Loading...
HomeMy WebLinkAboutItem 15 - Golf Course Improvement ProjectMEMO TO FROM: MEETING DATE: SUBJECT RECOMMENDATION: ITEM # l�� HONORABLE MAYOR AND MEMBERS OF TPE CITY COUNCIL ROGER NELSON, CITY MANAGER �C FEBRUARY 5, 2002 CHANGE ORDER NO. 1 — WADSWORTH CONTRACT GOLF COURSE IMPROVEMENT PROJECT City Council to consider approving Change Order No.1 to the Wadsworth Construction Inc., contract in the amount of $46,490 to upgrade the installed irrigation system; and to authorize reuse of greens mix for tee construction, authorize staff to execute change order and take any necessary action. FUNDING SOURCE: Funds are available from the Combination Tax and Revenue Certificates of Obligation, Series 1998, the Lake Enterprise Permanent Capital Maintenance Fund and Lake Enterprise Fund Balance; Golf Course Construction, Phase III: Certifications of Obligation, Account No. 210-48850-314-2 $ 888,779 PCMF, Account No. 210-48850-341-0 $ 873,322 Lake Enterprise Fund Balance Account No. 210-28900-000-0 $ 275.175 Total $2,037,276 BACKGROUND: On October 16, 2001 City Council authorized a contract with Wadsworth Golf Construction Inc. in the amount of $1,990,786 for the third and final phase of the Golf Course Improvement Project. At the time of bid award the City staff discussed three items which needed to be approved to amend the contract. This change order authorizes those three items. The three items included in Change Order No. 1 are listed below: Upgrade Irrigation System Add Fertigation System Reuse of Greens Mix on new tees (deduct) Total Change Order No. 1 $ 55,500 $ 17,800 $(26,810) $ 46,490 January 31, 2002 (3:36PM) The irrigation system upgrade will provide an upgraded control system which will allow golf course staff to use interactive control computer communicators for setting the irrigation system program. The upgrade will allow use of one graphic display controller for all 27 holes, Mockingbird, Bluebonnet and Pecan. This is a much improved controller system over the previous one. The fertigation system on the final phase (Pecan) will be consistent with the system installed for the irrigation of both the Bluebonnet and Mockingbird nines. This allows the use of liquid fertilizers and other chemicals to be selectively applied through the irrigation water to the golf course. It is a state of the art fertilizer application system and is very efficient and effective. The third item is a cost savings procedure which is recommended by both the contractor and the architect. Approval of these items in Change Order No. 1 will result in a new total contract price of $2,037,276. Staff recommends approval. WAG/cjc H: WadsworthChangeOrderl -2-05-02 January 30, 2002 (2:20PM) 1850 Crown Dr, Suite 1112 Dallas, TX 75234 Phone: (97 2) 831-9200 Fax: (972) 831 -1616 E-mail: weibring@golfresourcesinc.com D.A. Weibring/ Golf Resources Group January 15, 2002 Mr. Bill Gaither Director of Administrative Services City of Grapevine 200 S. Main Street P. O. Box 95104 Grapevine, TX 76099 RE: Grapevine Municipal Golf Course- Change Order No. 1. Dear Bill: Our office is in receipt of Change Order number one for the third nine renovation at Grapevine Municipal Golf Course. The following items are proposed as changes to the contractual scope of work: 1). Irrigation Alternate #1 Irrigation Upgrade to "Vista" $55,000.00 2). Irrigation Alternate #2 Fertigation System, Comm 2000 $17,800.00 3). Tee Mix Alternative Reuse Existing Greensmix on Tees $(26,810.00) Total $46,490.00 Based on the prior approval of these changes by Jim Smith and Jim Long, it is the recommendation of GRI Design, Inc. that Change Order No. I be processed. Sincerely, A�A /11� �tA� Steve Wolfard Grapevine/bap-'Third NineCorr/Change Order///,75/02 cc: Jim Smith Sam Swanson D. A. Weibring GRI Consulting, Inc. GRI Construction, Inc GRI Design, Inc. GRI Management, Inc. 01/16/02 WED 11:46 FAX 815 436 8404 WGCC-MIDWEST Z 002 CHANGE iff RDER AIA DOCUMENT (3701 PROJECT GRAPEVINE MUNICIPAL GOLF COURSE (name, address) GRAPEVINE, TEXAS TO CONTRACTOR: WADSWORTH GOLF CONSTR. CO. (name, address) 1401 VAN DYKE ROAD PLAINFIELD, IL 60544 The Contract is changed as follows: OWNER ❑ ARCHITECT CONTRACTOR ❑ FIELD ❑ OTHER ❑ CHANGE ORDER NUMBER. ne DATE: January 10, 2002 ARCHITECTS PROJECT NO: CONTRACT DATE' CONTRACT FOR: 1) Upgrade of Irrigation System Controls (Add Alternate #2) ramming "Vista,, series satellite controlers, includes Larry Rodgers pros 2) installation of Fertigation System in Pump Station (Add Alternate 0) "Truf Feeding System" model 2000 3) Reuse of Old Greens Mix$ on New Tees "Sand approved Suitable" October 30, 2001 golf course improvements Total 11 111MINERNM 55,500.00 � 17,800,00 $ (26,810.00) $ 46,490.00 Not valid until signed by the Owner, Architect and Contractor. 1,990,786.00 0,00 1,990,786,00 ) was ...................................... S The original (Contract Sum) ( $ Net change by previously authorized Change Orders prior to this Change Order was ........................................ .. $ The (Contract Sum) { ) The (Contract Sum) will be (increased) (dewea�►) ( $ (unchanged) by this Change Order in the amount of ............................... The new (Contract Sum) ( ) including this Change Order will be ..................... • • • The Contract Time will be (increased) (decreased) (unchanged) by The date of Substantial Completion as of the date of this Change Order there is 46,490.00 2,037,276,00 NOTE: This summary does not reflect rhan9e5 in the Contract Sum, Contract Time, or Guaranteed Maximum Price which have been authorized by Construction Change Directive, Golf Resources Group ARCHITECT 1850 Crown Drive, Suits 141112 Address Dallas, Texas 75234 BY Wadsworth Golf Construction Company CONTRACTOR 1901 Van Dyke Road Address Plainfi ois 60544 )days. City of Grapevine, Texas OWNER 200 South Main Street, p, O. Box 95104 Address Grapevine, Texas 76099 BY ' Z�G DATE %` /0 —;Z6 Q �- DATE DATE t - AtA DOCUMENT G701, CHANGE ORDER . 1987 EDITION AIA 1987 TH> (3701-1987 AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N,W., WASHINGTON, D.C. 20006