Loading...
HomeMy WebLinkAboutItem 07 - Elevated Storage TankITEMi -.._...L.... --ID MEMO TO: HONORABLE MAYOR AND MEMBERS ,OAF/THE CITY COUNCIL FROM: ROGER NELSON, CITY MANAGER ✓`(/ MEETING DATE: FEBRUARY 19, 2002 SUBJECT: DESIGN CONTRACT AMENDMENT # 3 — ELEVATED STORAGE TANK RECOMMENDATION: City Council consider approving Amendment # 3 to the Engineering Services Contract with Freese & Nichols, Inc. for the elevated Storage Tank Project in an amount not to exceed $91,000.00, authorize staff to execute said amendment, and take any necessary action. FUNDING SOURCE: Funds are available in the following accounts: Funding Source Account Amount Award Percent 99 Utility Bonds 200-48930-534-5 $308,000.00 $91,000.00 8.5% 01 Utility Bonds 200-48930-534-7 $2,819,334.20 78.2% 01 Utility Bonds 200-48800-534-7 $330,665.80 9.2% Utility Fund Balance 200-48800-530-1 $147,688.62 4.1% Special Services 100-44540-415-1 $1,700.00 0.0% TOTAL $3,607,388.62 $91,000.00 100% Budget Amount Award Percent Engineering $296,400.00 $91,000.00 8.2% Construction $2,653,860.00 73.6% ROW Acquisition $488,949.92 13.5% Contingency $ 168,178.70 4.7% TOTAL $3,607,388.62 $91,000.00 100% February 14, 2002 (9:55AM) BACKGROUND: 11 A 3 City Council approved the original contract with Freese & Nichols, Inc. for the design of the elevated storage tank in an amount of $ 143,900.00 on March 28, 2000 and contract modifications # 1 and 2 in the total amount of $58,500.00 on August 6, 2001. These past contract modifications included design of two climate controlled floors for storage of City records and investigation of the water system model. The proposed contract amendment # 3 in an amount of $ 91,000.00 with Freese & Nichols provides specialized construction inspection and material testing services for the construction of the 2 Million Gallon water tower and the storage facilities incorporated in the tower. City Staff does not have the specific expertise in elevated water tank construction to provide the services needed for this project. Staff has anticipated this third party inspection and testing need since the outset of the design of the project and has maintained a budget item for these services in the overall project budget. Staff recommends approval. JSL/dsm/ jdr O:\AGEN DA\02-19-02\Elevated_Ta nk_Desian_Amend#3.doc February 14, 2002 (9:55AM) Feb.12, 2002 10:54AM C E N T U R Y a F s E R v l c E No.6489 P. 4 Iris,% FREESE,NICHOLS Februay 5, 2002 Mr, Stan Laster City of Grapevine P. 0. Box. 95104 Grapevine, TX 76099 Re: 2.0 MG Elevated Storage Tank Additional Services for Construction Dear Mr, Laster: We are please to provide additional construction services for the installation of the new 2.0 million gallon elevated tank. In accordance with your request, we propose to use Deltatek Engineers as a sub contractor to perform the bulk of the additional construction services. We are estimating at this time that these services will be performed over an eighteen month period beginning in February 2002 and ending in August 2003. Our scope for additional services include the following items: SCOPE Of SERVICES Item. 1. Project Administration 1. Attend pre-eonstxuetion, and progress meetings during construction. Record or list meeting notes to be included into meeting minutes. 2. Review pay requests with the Contractor and make recommendations to the OWNBR for payment. 3. Perform on site observation as required by the project activities. Consultant's on site visits shall be coordinated with the activities of the Contractor and shall be sufficient in number to assure all installations and tests can be observed as outlined in the folluwrizrg scope of service items. 4. Review project changes and assist the Contractor with project mark-ups for use in preparation of "Record Drawings". 5. Perforin substantial project completion walls-diru and prepare list of items to be corrected or addressed. Freese and Nichols, Inc. . Engineers ; Environmental Scientists ::: Arcnitects 215 Mary Street Suite 3C5 Waco, Texas . 76701 254-741-6030 Fax 254-296-4630 Feb.12. 2002 10:54AM No.6489 P. 6. Perform final project walk-thm and assist the OWNER with the project closeout. Item 2. Architectural 1. Provide on site observation for installation of doors, windows, floors, ceilings, and interior finish out. Item 3. Concrete Testing Consultant will provide on-site technician to collect concrete compressive strength cylinders for the tank support system to include but not limited to the foundation, concrete pedestal and structural floors. 2. As a minimum, one set of four cylinders will be collected and tested at 14 day and 28 day for each 30 cubic yards of concrete placed as part of the tower foundation, pedestal and support system. 3. Each lift of concrete pedestal will be tested using one set of four cylinders per lift. 4. Test cylinders will be collected and tested for all structural floors. S_ Consultant will review placement of the reinforcement steel and the orientation will be checked for compliance with the contractor's shop drawings, construction documents, local code, and ACI. Item 4. Steel Fabrications 1. Consultant will inspect the steel fabrication and welded joints for compliance with AWS, AW"WA D100, and perform radiographic testing (x-ray) to ensure sufficient weld penetration has been provided. Item 5. 'Ward Piping Provide on-site observation of installation of yard piping and pipe embedment. This shall include valve boxes, vaults, and manholes_ Verify backfill densities for pipe embedments. 2. Witness hydrostatic pressure testing of all pressure piping. 3. Witness low pressure air testing of installed sanitary sewer system piping and manholes. Item 6. Mechanical and HVAC 1. Provide on-site observation of installation and testing of all mechanical equipment including but not limited to heating, air conditioning, plumbing, fire protection and elevator systems. -2- Feb.12. 2002 10:55AM Item 7. Electrical Systems No•6489 P, 6 Provide on-site observation of installation and testing of all electrical installation system including but not limited to conduit, wiring, disconnects, switches, and lighting. Item 8. Instrumentation and Controls Provide on-site observation ofinstallation and testing of all instrumentation and controls including but not limited SCADA system and interfacing with existing SC.4DA system, water level control valves and related pressure sensors, and alarm systems. Item 9. Coating Applications Consultant shall inspect surface preparation and shop prime coat applications work to be incorporated into the project. 2. Consultant will verify the application of prime, intermediate and final coatings and layer thickness in accordance with the specifications as outlined in Section 9901 and Section 9905. Services to be performed include: a_ Check surface preparation of tank interior and exterior. b. Measure surface profile of metal substrate for interior and exterior of tank and all other metals scheduled for coating. c. Inspect immediate coat applications and measure vet film thickness of all items scheduled for coatings. d. Measure dry film thickness of all items scheduled for coatings e. Perform holiday detection test on tank interior. Item 10. Miscellaneous Improvements and Site Clean-up Provide on site observation for miscellaneous improvements, temporary grading and site clean-up as directed by the Owner. It is anticipated that the final site grading, fencing, site lighting and Final landscaping will be performed by the Owner after final completion of the construction project. Item 11. Time of Completion This additional service has been, prepared with the following milestone dates. The agreement shall remain in effect until completion of the work as outlined in the milestones: 1. Project Pre -construction Meeting February 1, 2002 2, Project Award by Owner February 5, 2002 3. Substantial Completion of Water Storage February 1, 2003 4. 100 Percent Project Completion & Final Walk Through July 31, 2003 5. Submittal of "As -Built" Drawings to the Owner August 31, 2003 -3- We respectfully request an amendment to the SPECL�L SERVICES section of our existing contract amount for the additional work to be perforrn.ed. We request an additional amount not to exceed $ 91,000 for the additional services as listed above. This additional request will modify the current contract amount as follovvs: Original contract amount for Basic Services $121,000.00 Modification to Basic Services $ •49,000.00 Subtotal Basic Services $170,000.00 Original contract amount for Special Services $ 22,900.00 Proposed Additional Construction Services $ 91,000.00 Subtotal Special Services $113,900.00 We will begin work on this additional scope upon your approval and notice to proceed. Should you have any questions, we will be glad to meet with you and discuss oux proposal. If this proposal meets with your approval, please sign and return, one copy of this letter to our office. Very truly yours, � Charles Manning, P.E. Accepted for City of Grapevine, Jerry L. Hodge, Director of Public Works Date in ID Si9n Here ❑ Initial Hers ❑ Notarize H Return Poa1,,ft7$j9r+2turereque8 1 PIC 7689 Feb 12. tUU[ IUC E N T U R Y U r H ��u•b4b5 F L Irlev, FREESE•NICHOLS February 12, 2002 Mr. John Robertson City of Grape-,ine P. O. Box 95104 Grapevine, TY 76099 Re: 2.0 MG Elevated Storage Tank Additional Senices for Construction Dear lair. Robertson: In accordance wit: your fax dated February 7, 2002, we have amended the request letter to Mr. Stan Laster. These amendments include adding testing of backfill densities for pipeline embedment and we have added the term "not to exceed" in our fee request. With regard to our fee break down, we have included the following: 1. Adjusted our request as per our discussion with Mr. Mike Brownlee. 2. Amended the total number of site visits for Project Administration by the sub consultant . 3. Added a column indicating the Sub Consultants Billable rates for this project. 4. Indicated the unit costs for the various tests that will be performed. 5. Updated our spread sheet to indicate current totals and a not to exceed fee request of $91,000. If you have any questions, please contact me at your convenience. Very truly yours,, Charles Manning, P.E. Cc: File GPV00247 Freese and Nichois, Inc. Engineers °> Environmental Scientists ; Architects 215 Mary Street Suite 305 Waco, Texas 76701 254,741.6030 Fax 254-296-4630 City of Grapevine 2.0 MC Elevated Tank Construction Services Itemized Fee CWculationv Item Description No. 1 Conferences 2 Project Meetingslsite visna (6 extra months) 3 DeitaTck Ccordination (4 hralmonth - 18 months) 4 Coordination w/Clty (6 extra months) 5 Q VOC 6 Prepare As -bulb dwgs. (bsslc services) Subtotal Manhours . 1 v 1. 1 v V , , v Item Expenses No. 1 site survey ( in original scope) 2 Deltatek Engineers Number of Esbrratcd sR.vwscr Billable Description Manhou z. mearng: Amounts 2s Project Admir:istration 168 36 $10,021 2b Architectural 82 20 $5,776 2c Concrete InspecV..on 170 $0 $11,880 2d Steel Fabrications 106 30 $7,250 2e Yard Piping 52 14 $3,410 2f Mechanical & HVAC 40 12 $3,421 29 Electrical 32 a $2,552 21: instrumentation & Cantrols 44 6 $3,454 21 Coating Applicafior„ 200 80 $14.300 2) Miscellaneous Improvements 36 16 $2,310 Sub total elUble sa!ary 930 282 $64,383 Estimate of # of testa Unl: Deltaiek Nen Salary Expanaea performed Unit Costs 2a Project Administration 0 11,694 2b Architectural 0 so 2c Concrete Inepectlon 20 ea $138 $2,750 2d Steel Fabrications 20 ea $248 $4,950 2e Yard Piping 25 as $132 $3,300 2f Mechanical & HVAC 0 S0 2g . Electrical 0 $0 2h Instrumentation & Controls 0 $0 2i Cooling Applications 20 ea $108 $2,123 2j Misceltanecus Improvements 0 so Subtotal 85 $14,5' 7 Total amount of aub contract $79,200 Total amount basad on manhours & services Total Amount of Request General Information Deltatek Billable Rates Per Hour Bid Amount $2,653,860 Senior Engineer $95 Five percent of construction $132,693 Registered Engineer se5 Fee Request $91,000 Englneer $75 Difference $41,593 Senior Technician $60 Cad brafter 155 Clerical $35 DclttlyFifes\SpreadsheefslGRAPEVtN\2.Omg elevated tank\constnx tion services budgetwb3 total manhours S 12 $1,292 0 $0 $ $734 0 $0 72 $8,813 0 $0 a $734 0 $0 4 $490 0 s0 0 s0 100 $12,063 $91,263 $91,000