MEMO TO: HONORABLE MAYOR AND MEMBERS ,OAF/THE CITY COUNCIL
FROM: ROGER NELSON, CITY MANAGER ✓`(/
MEETING DATE: FEBRUARY 19, 2002
SUBJECT: DESIGN CONTRACT AMENDMENT # 3 — ELEVATED
STORAGE TANK
RECOMMENDATION:
City Council consider approving Amendment # 3 to the Engineering Services Contract
with Freese & Nichols, Inc. for the elevated Storage Tank Project in an amount not to
exceed $91,000.00, authorize staff to execute said amendment, and take any necessary
action.
FUNDING SOURCE:
Funds are available in the following accounts:
Funding Source
Account
Amount
Award
Percent
99 Utility Bonds
200-48930-534-5
$308,000.00
$91,000.00
8.5%
01 Utility Bonds
200-48930-534-7
$2,819,334.20
78.2%
01 Utility Bonds
200-48800-534-7
$330,665.80
9.2%
Utility Fund Balance
200-48800-530-1
$147,688.62
4.1%
Special Services
100-44540-415-1
$1,700.00
0.0%
TOTAL
$3,607,388.62
$91,000.00
100%
Budget
Amount
Award
Percent
Engineering
$296,400.00
$91,000.00
8.2%
Construction
$2,653,860.00
73.6%
ROW Acquisition
$488,949.92
13.5%
Contingency
$ 168,178.70
4.7%
TOTAL
$3,607,388.62
$91,000.00
100%
February 14, 2002 (9:55AM)
BACKGROUND:
11 A 3
City Council approved the original contract with Freese & Nichols, Inc. for the design of
the elevated storage tank in an amount of $ 143,900.00 on March 28, 2000 and contract
modifications # 1 and 2 in the total amount of $58,500.00 on August 6, 2001. These
past contract modifications included design of two climate controlled floors for storage of
City records and investigation of the water system model.
The proposed contract amendment # 3 in an amount of $ 91,000.00 with Freese &
Nichols provides specialized construction inspection and material testing services for the
construction of the 2 Million Gallon water tower and the storage facilities incorporated in
the tower. City Staff does not have the specific expertise in elevated water tank
construction to provide the services needed for this project.
Staff has anticipated this third party inspection and testing need since the outset of the
design of the project and has maintained a budget item for these services in the overall
project budget.
Staff recommends approval.
JSL/dsm/ jdr
O:\AGEN DA\02-19-02\Elevated_Ta nk_Desian_Amend#3.doc
February 14, 2002 (9:55AM)
Feb.12, 2002 10:54AM C E N T U R Y a F s E R v l c E No.6489 P. 4
Iris,%
FREESE,NICHOLS
Februay 5, 2002
Mr, Stan Laster
City of Grapevine
P. 0. Box. 95104
Grapevine, TX 76099
Re: 2.0 MG Elevated Storage Tank
Additional Services for Construction
Dear Mr, Laster:
We are please to provide additional construction services for the installation of the new 2.0 million
gallon elevated tank. In accordance with your request, we propose to use Deltatek Engineers as a
sub contractor to perform the bulk of the additional construction services. We are estimating at this
time that these services will be performed over an eighteen month period beginning in February 2002
and ending in August 2003.
Our scope for additional services include the following items:
SCOPE Of SERVICES
Item. 1. Project Administration
1. Attend pre-eonstxuetion, and progress meetings during construction. Record or list
meeting notes to be included into meeting minutes.
2. Review pay requests with the Contractor and make recommendations to the OWNBR for
payment.
3. Perform on site observation as required by the project activities. Consultant's on site
visits shall be coordinated with the activities of the Contractor and shall be sufficient in
number to assure all installations and tests can be observed as outlined in the folluwrizrg
scope of service items.
4. Review project changes and assist the Contractor with project mark-ups for use in
preparation of "Record Drawings".
5. Perforin substantial project completion walls-diru and prepare list of items to be corrected
or addressed.
Freese and Nichols, Inc. . Engineers ; Environmental Scientists ::: Arcnitects
215 Mary Street Suite 3C5 Waco, Texas . 76701
254-741-6030 Fax 254-296-4630
Feb.12. 2002 10:54AM No.6489 P.
6. Perform final project walk-thm and assist the OWNER with the project closeout.
Item 2. Architectural
1. Provide on site observation for installation of doors, windows, floors, ceilings, and
interior finish out.
Item 3. Concrete Testing
Consultant will provide on-site technician to collect concrete compressive strength
cylinders for the tank support system to include but not limited to the foundation,
concrete pedestal and structural floors.
2. As a minimum, one set of four cylinders will be collected and tested at 14 day and 28 day
for each 30 cubic yards of concrete placed as part of the tower foundation, pedestal and
support system.
3. Each lift of concrete pedestal will be tested using one set of four cylinders per lift.
4. Test cylinders will be collected and tested for all structural floors.
S_ Consultant will review placement of the reinforcement steel and the orientation will be
checked for compliance with the contractor's shop drawings, construction documents,
local code, and ACI.
Item 4. Steel Fabrications
1. Consultant will inspect the steel fabrication and welded joints for compliance with AWS,
AW"WA D100, and perform radiographic testing (x-ray) to ensure sufficient weld
penetration has been provided.
Item 5. 'Ward Piping
Provide on-site observation of installation of yard piping and pipe embedment. This
shall include valve boxes, vaults, and manholes_ Verify backfill densities for pipe
embedments.
2. Witness hydrostatic pressure testing of all pressure piping.
3. Witness low pressure air testing of installed sanitary sewer system piping and manholes.
Item 6. Mechanical and HVAC
1. Provide on-site observation of installation and testing of all mechanical equipment
including but not limited to heating, air conditioning, plumbing, fire protection and
elevator systems.
-2-
Feb.12. 2002 10:55AM
Item 7. Electrical Systems
No•6489 P, 6
Provide on-site observation of installation and testing of all electrical installation system
including but not limited to conduit, wiring, disconnects, switches, and lighting.
Item 8. Instrumentation and Controls
Provide on-site observation ofinstallation and testing of all instrumentation and controls
including but not limited SCADA system and interfacing with existing SC.4DA system,
water level control valves and related pressure sensors, and alarm systems.
Item 9. Coating Applications
Consultant shall inspect surface preparation and shop prime coat applications work to be
incorporated into the project.
2. Consultant will verify the application of prime, intermediate and final coatings and layer
thickness in accordance with the specifications as outlined in Section 9901 and Section
9905.
Services to be performed include:
a_ Check surface preparation of tank interior and exterior.
b. Measure surface profile of metal substrate for interior and exterior of tank and all
other metals scheduled for coating.
c. Inspect immediate coat applications and measure vet film thickness of all items
scheduled for coatings.
d. Measure dry film thickness of all items scheduled for coatings
e. Perform holiday detection test on tank interior.
Item 10. Miscellaneous Improvements and Site Clean-up
Provide on site observation for miscellaneous improvements, temporary grading and
site clean-up as directed by the Owner. It is anticipated that the final site grading,
fencing, site lighting and Final landscaping will be performed by the Owner after final
completion of the construction project.
Item 11. Time of Completion
This additional service has been, prepared with the following milestone dates. The
agreement shall remain in effect until completion of the work as outlined in the
milestones:
1. Project Pre -construction Meeting February 1, 2002
2, Project Award by Owner February 5, 2002
3. Substantial Completion of Water Storage February 1, 2003
4. 100 Percent Project Completion & Final Walk Through July 31, 2003
5. Submittal of "As -Built" Drawings to the Owner August 31, 2003
-3-
We respectfully request an amendment to the SPECL�L SERVICES section of our existing contract
amount for the additional work to be perforrn.ed. We request an additional amount not to exceed $
91,000 for the additional services as listed above. This additional request will modify the current
contract amount as follovvs:
Original contract amount for Basic Services $121,000.00
Modification to Basic Services $ •49,000.00
Subtotal Basic Services $170,000.00
Original contract amount for Special Services $ 22,900.00
Proposed Additional Construction Services $ 91,000.00
Subtotal Special Services $113,900.00
We will begin work on this additional scope upon your approval and notice to proceed. Should you
have any questions, we will be glad to meet with you and discuss oux proposal.
If this proposal meets with your approval, please sign and return, one copy of this letter to our office.
Very truly yours,
� Charles Manning, P.E.
Accepted for City of Grapevine,
Jerry L. Hodge, Director of Public Works
Date
in
ID Si9n Here
❑ Initial Hers
❑ Notarize H
Return
Poa1,,ft7$j9r+2turereque8
1
PIC 7689
Feb 12. tUU[ IUC E N T U R Y U r H ��u•b4b5 F L
Irlev,
FREESE•NICHOLS
February 12, 2002
Mr. John Robertson
City of Grape-,ine
P. O. Box 95104
Grapevine, TY 76099
Re: 2.0 MG Elevated Storage Tank
Additional Senices for Construction
Dear lair. Robertson:
In accordance wit: your fax dated February 7, 2002, we have amended the request letter to Mr. Stan
Laster. These amendments include adding testing of backfill densities for pipeline embedment and
we have added the term "not to exceed" in our fee request.
With regard to our fee break down, we have included the following:
1. Adjusted our request as per our discussion with Mr. Mike Brownlee.
2. Amended the total number of site visits for Project Administration by the sub consultant .
3. Added a column indicating the Sub Consultants Billable rates for this project.
4. Indicated the unit costs for the various tests that will be performed.
5. Updated our spread sheet to indicate current totals and a not to exceed fee request of
$91,000.
If you have any questions, please contact me at your convenience.
Very truly yours,,
Charles Manning, P.E.
Cc: File GPV00247
Freese and Nichois, Inc. Engineers °> Environmental Scientists ; Architects
215 Mary Street Suite 305 Waco, Texas 76701
254,741.6030 Fax 254-296-4630
City of Grapevine
2.0 MC Elevated Tank
Construction Services
Itemized Fee CWculationv
Item Description
No.
1 Conferences
2 Project Meetingslsite visna (6 extra months)
3 DeitaTck Ccordination (4 hralmonth - 18 months)
4 Coordination w/Clty (6 extra months)
5 Q VOC
6 Prepare As -bulb dwgs. (bsslc services)
Subtotal Manhours
. 1 v 1. 1 v V , , v
Item
Expenses
No.
1
site survey ( in original scope)
2
Deltatek Engineers
Number of
Esbrratcd sR.vwscr
Billable
Description
Manhou z. mearng:
Amounts
2s
Project Admir:istration
168 36
$10,021
2b
Architectural
82 20
$5,776
2c
Concrete InspecV..on
170 $0
$11,880
2d
Steel Fabrications
106 30
$7,250
2e
Yard Piping
52 14
$3,410
2f
Mechanical & HVAC
40 12
$3,421
29
Electrical
32 a
$2,552
21:
instrumentation & Cantrols
44 6
$3,454
21
Coating Applicafior„
200 80
$14.300
2)
Miscellaneous Improvements
36 16
$2,310
Sub total
elUble sa!ary
930 282
$64,383
Estimate
of # of
testa
Unl:
Deltaiek Nen Salary Expanaea
performed
Unit Costs
2a
Project Administration
0
11,694
2b
Architectural
0
so
2c
Concrete Inepectlon
20
ea $138
$2,750
2d
Steel Fabrications
20
ea $248
$4,950
2e
Yard Piping
25
as $132
$3,300
2f
Mechanical & HVAC
0
S0
2g
. Electrical
0
$0
2h
Instrumentation & Controls
0
$0
2i
Cooling Applications
20
ea $108
$2,123
2j
Misceltanecus Improvements
0
so
Subtotal
85
$14,5' 7
Total amount of aub contract
$79,200
Total amount basad on manhours & services
Total Amount of Request
General Information
Deltatek Billable Rates
Per Hour
Bid Amount
$2,653,860
Senior Engineer
$95
Five percent of construction
$132,693
Registered Engineer
se5
Fee Request
$91,000
Englneer
$75
Difference
$41,593
Senior Technician
$60
Cad brafter
155
Clerical
$35
DclttlyFifes\SpreadsheefslGRAPEVtN\2.Omg elevated tank\constnx tion services budgetwb3
total
manhours S
12 $1,292
0 $0
$ $734
0 $0
72 $8,813
0 $0
a $734
0 $0
4 $490
0 s0
0 s0
100 $12,063
$91,263
$91,000