HomeMy WebLinkAboutItem 08 - Park ImprovementsMEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: ROGER NELSON, CITY MANAGER.' MEETING DATE: MARCH 5, 2002 SUBJECT: CONSIDER APPROVAL OF BID 119-2002 FOR PARK IMPROVEMENTS AT MEADOWMERE PARK, A LAKE USE AGREEMENT WITH LONESOME DOVE RANCH AND FUNDS TO RELOCATE UTILITY LINES IN THE PARK RECOMMENDATION: City Council to consider award of a contract to Dean Construction for park improvements at Meadowmere Park. The base bid for the project is $420,119.80 and staff is recommending $55,378.00 in add/deduct items for a total bid of $475,497.80. A bid tabulation is attached for review. Staff also recommends the City Council approve a Lake Use Agreement with Lonesome Dove Ranch for storage of irrigation water for Meadowmere Park. Finally, staff recommends the Council approve the relocation of utility lines in the park in the amount of $52,606.43 to Tri -County Electric. The existing lines are located within the project area and need to be relocated to the perimeter of the park. An agreement with Tri -County electric to relocate the electric service is attached. The total cost of these recommendations is $528,104.23 FUNDING SOURCE: Account #176-71101-005 — Meadowmere Park Improvements $456,684.00 Account #171 -46680 -NW — Open Space Funds 71,420.23 TOTAL FUNDS AVAILABLE $528,104.23 BACKGROUND: The City Council approved a concept plan of Meadowmere Park at the October 6, 1998 --meeting:- Phase 1 development -of Meadowmere Park was included on the -December 5, 1998 bond election and was approved by the citizens of Grapevine. Phase 1 includes the development of baseball and soccer fields. February 27, 2002 (4:18PM) Bids were taken in accordance with Local Government Code Chapter 252, Subchapter ' B, Section 252.021, 252.0215, and 252.022. This bid was advertised in the Fort Worth Star Telegram and the Grapevine Sun on January 17, 2002 and January 24, 2002. The purpose of this bid was to obtain competitive pricing for park improvements at Meadowmere Park. This project consists of grading and irrigation for five soccer fields and three baseball/soccer practice fields, construction of a water well, pumping system for the irrigation, and establishment of turf. Ten vendors submitted bids for this project. Pricing consisted of a base bid with seven optional items. Dean Construction was the lowest bid received on both the base bid and optional items. Dean's total for the base bid was $420,119.80 and $55,378.00 for all optional items. The grand total of their bid (including optional items) was $475,497.80. DE/CD February 27, 2002 (4:18PM) Todays Date: 02/11/02 Page 1 CITY OF GRAEEV/NE Bid Tabulation Form Bid 119-2002 Improvements to Meadowmere Park ce..r;- a ____. $170.515.01 I $199,529.60 I $161,954.85 I $134,258.70 $60,264.00 $60,333.00 $48,346.00 tion Two -Water Well $569,474.50 $60,264.00 $629,738.50 $426,009.85 $60,333.00 $486,342.85 $482,'61.70 $48.346.00 $531,107.70 VENDORS ............................................. 1 1 TLB Construction rnsh Install develop complete in ce a deep water well Miller Sierra Contractors Green Scaping $127,500.00 Sprinkle & Sprout $114,900.00 � 3atai ca 'K* Ice tTnCt , r {Ta#aF �4Pt#ce ' s ,„ , , ,+PricB unit' R,rice --Total Price n1t ri atallin#t,,, Item Qty Un tem Description PriCC price LS [rnl_,n& install complete in place a deep ter well submersible pump $37,890.00 Section one -Site Work $35,000.00 $35,000.00 $31,200.00 $31,200.00 $34,74500 $34,745.00 3 1 1 1 20 AC Clearing, Stripping, Grubbing, Tree Removal & Grinding $2,635.20 $52,704.00 $3,293.00 $65,860.00 $4,068.00 $81,360.00 $1,680.00 $33,600.00 2 12538 Cy Unclassified excavation, including rough and fine grading $5.8268 $73,056.42 $6.40 $80,243.20 $3.59 $45,011.42 $5.00 $62,690.00 EA urnish and Install 3" single check valve w/concrete vault $3,493.00 $3,493.00 $3,177.00 $3,177.00 $2,400.00 $2,400.00 $3,875.00 $3,875.00 6 11 3 6167 $3,720.00 ITEM DELETED BY ADDENDUM $3,390.00 $3,390.00 $1,400.00 $1,400.00 $2,150.00 $2,150.00 7 1 1 EA Furnish and Install 3" Tee $1,230.00 $1,230.00 $1,113.00 $1,113.00 $200.00 $200.00 $930.00 $930.00 8 2 4 6167 $1,243.00 ITEM DELETED BY ADDENDUM $1,132.00 $2,264.00 $300,00 $600.00 $1,085,00 $2,170.00 5 1413 Sy Scarified and compact subgrade to density in drive $1.0545 $1,490.01 $1.00 $1,413.00 $1.33 $1,879.29 $1.90 $2,684.70 6 14131 SY Furnish & Install compete in place " o compacted commercial grade base $7.2470 $10,240.01 $6.60 $9,325.80 $6.39 $9,029.07 $6.00 $8,478.00 7 89 LF Furnish & install 4' reinforced concrete pipe, Class III, tongue/groove $127.8650 $11,379.99 $96.20 $8,561.80 $44,00 $3,916.00 $82.00 $7,298.00 81 2 EA urnish & install standar of double 124" type "B: headwall $1,975.00 $3,950.00 $1,085.50 $2,171.00 $1,100.00 $2,200.00 $1700.00 $3,400.00 Furnish & Instal Hybrid Bermuda Sprigging in designated areas $1,581.3560 $27,990.00 $4,522.00 $80,039.40 $1,400.00 $24,780.00 $4,700.00 $83,190.00 Sub -Total Section 3 ........................ 9 1503 LF Furnish & install silt fence per detail $1.5170 $2,280.05 $2.40 $3,607.20 $1.29 $1.938.87 $2.00 $3.006.00 10 2234 LF Furnish and install post & cable fence per detail $3.9510 $8,826.53 $11.40 $25,467.60 $5.30 $11,840.20 $3.00 $6,702,00 $180.00 $180.00 $170.00 $170.00 $172.00 $172.00 2 1 LF Drilling 17 1/2" diameter hole $44.00 $44.00 $48.00 11 2 EA Furnish & install 24" pipe gate, per detail $3,294.00 $6,588.00 $1,440.00 $2,880.00 $2,390.00 $4,780.00 $3,200.00 $6,400.00 $18.00 $18.00 $22.50 $22.50 4 ITEM DELETED BY ADDENDUM 12 12 _.5 .___-I LF__.. ITEM DELETED BY ADDENDUM .___1110.00 $110.00 _. .$120.00. ___.$120.00 ._ _. $100.00 ..._.$100.00 124.00 _ $124.00 6 1 LF Furnish & Install " discharge column pipe, & 114" hydraulic plastic air line & electric $11.00 $11.00 $12.00 $12.00 $10.00 $10.00 $16.50 $16.50 7 1 LS urnish all 777 materials, tools and equipment for abandoning test hole 13 13 $14,400.00 ITEM DELETED BY ADDENDUM $12,000.00 $12,000.00 $15,000.00 $15,000.00 8 1 LS Furnish &Install Irrigation System Valves $41,695.50 $41,695.50 ce..r;- a ____. $170.515.01 I $199,529.60 I $161,954.85 I $134,258.70 Sub -Total Add/Deduct Section............ $55,242.00 $60,264.00 $60,333.00 $48,346.00 tion Two -Water Well $569,474.50 $60,264.00 $629,738.50 $426,009.85 $60,333.00 $486,342.85 $482,'61.70 $48.346.00 $531,107.70 1 1 LS rnsh Install develop complete in ce a deep water well $139,995.00 $139,995.00 $127,500.00 $127,500.00 $114,900.00 $114,900.00 $122,725.00 $122,725.00 2 1 LS [rnl_,n& install complete in place a deep ter well submersible pump $37,890.00 $37,890.00 $35,000.00 $35,000.00 $31,200.00 $31,200.00 $34,74500 $34,745.00 3 1 LS rnish & Install complete in place, a mp/well pad $19,074.00 $19,074.00 $13,000,00 $13,000.00 $18,900.00 $18,900.00 $7,000.00 $7,000.00 4 75 LF Furnish and Install 3" PVC or 18 discharge line $67.5330 1 $5,064.98 $61.50 $4,612.50 $3.80 $285.00 $40.00 $3,000.00 5 1 EA urnish and Install 3" single check valve w/concrete vault $3,493.00 $3,493.00 $3,177.00 $3,177.00 $2,400.00 $2,400.00 $3,875.00 $3,875.00 6 11 EA Furnish and Install " meterlstrainer with box $3,720.00 $3,720.00 $3,390.00 $3,390.00 $1,400.00 $1,400.00 $2,150.00 $2,150.00 7 1 1 EA Furnish and Install 3" Tee $1,230.00 $1,230.00 $1,113.00 $1,113.00 $200.00 $200.00 $930.00 $930.00 8 2 EA Furnish & Install 3" gate valve and box $1,243.00 $2,486.00 $1,132.00 $2,264.00 $300,00 $600.00 $1,085,00 $2,170.00 Sub -Total Section 2 ............................ $212,952.98 $190,056.50 $169,885.00 $176,59500 section Three -Landscape andIrrigation 1 1 LS urnish & Instal complete kid n ump Irrigation Pump System $50,730.00 $50,730.00 $43,533.00 $43,533.00 $37,400.00 $37,400.00 $49,718.00 $49,718.00 2 1 LS Furnish and Install complete Irrigation System w/mains and valves $61,835.00 $61,835.00 $56,316,00 $56,316.00 $31,990.00 $31,990.00 $39,000.00 $39,000.00 3 17.7 AC Furnish & Instal Hybrid Bermuda Sprigging in designated areas $1,581.3560 $27,990.00 $4,522.00 $80,039.40 $1,400.00 $24,780.00 $4,700.00 $83,190.00 Sub -Total Section 3 ........................ $140,555.00 $179,888.40 $94,170.00 $171,908.00 Add/Deduct items 1 1 HR Additional Testing $16500 $165.00 $180.00 $180.00 $170.00 $170.00 $172.00 $172.00 2 1 LF Drilling 17 1/2" diameter hole $44.00 $44.00 $48.00 $48.00 $45.00 $45.00 $29.00 $2900 3 1 LF urnish/Install/ emmet rout B casing $16.50 $16.50 $18.00 $18.00 $18.00 $18.00 $22.50 $22.50 4 ITEM DELETED BY ADDENDUM _.5 .___-I LF__.. urnish/Insia I! ravelack / dia min slotted screen .. __ .___1110.00 $110.00 _. .$120.00. ___.$120.00 ._ _. $100.00 ..._.$100.00 124.00 _ $124.00 6 1 LF Furnish & Install " discharge column pipe, & 114" hydraulic plastic air line & electric $11.00 $11.00 $12.00 $12.00 $10.00 $10.00 $16.50 $16.50 7 1 LS urnish all 777 materials, tools and equipment for abandoning test hole $13,200.00 $13,200.00 $14,400.00 $14,400.00 $12,000.00 $12,000.00 $15,000.00 $15,000.00 8 1 LS Furnish &Install Irrigation System Valves $41,695.50 $41,695.50 $45,466.00 $45,486.00 $47,999.00A $47,990.00 $32,982.00 $32,982.00 Sub -Total Add/Deduct Section............ $55,242.00 $60,264.00 $60,333.00 $48,346.00 TOTALS: Total Amount of Base Bid (Sum of Sects 1-3 $524,022.98 Total Amount of Add/Deduct Items $55,242.00 GRAND TOTAL AMOUNT ................ $579,264.98 $569,474.50 $60,264.00 $629,738.50 $426,009.85 $60,333.00 $486,342.85 $482,'61.70 $48.346.00 $531,107.70 Todays Date: 02/11/02 page 2 CITY OF GRAPEVINE Bid Tabulation Form Bid 119-2002 Improvements to Meadowmere Park 00' ., Ref B VENDORS ............. ............................ „... American Civil Contractors North HavenNalley Crest AUI Contractors $61,629.82 Dean Construction $519,561.04 $647,997.69 $552,748.65 Add pricing for bonds Wit, 1otaP �r� Ictal „„ iUn w r L '°Total L#nIEotaf $126,521.15 I r pig $122,727.00 Unit Item Description $111,500.00 of 'i'dce` ,-T" ;Prtee .. ..'...' `8tice pt€co "Pttre`;.. .#'riae :. 37,200.00 $37,200.00 $34,744.60 Section One -Site Work $36,366.00 $36,36600 $33,000.00 v� 3 1 LS Furnish & Install complete in place, a pump/well pad ' $13,250.00 $19,360.00 earing, tripping, rub Ing, I ree $39,000.00 $39,000.00 $12,600.00 $12,600.00 -.4 75 LF urnish and Insta 3" PVC dr 1 discharge line 1 20 AC Removal & Grinding $1,765.00 $35,300.00 $2,106.14 $42,122.80 $950.00 $19,000.00 $3,200.00 $64,000.00 3,153.23 $3,153.23 $3,162.50 Unclassified excavation, including rough $3,000= $3.000.00 $2,400.00 $2,400.00 1 EA Furnish and Install " meter/strainer with box 3,463.85 2 12538 CY and fine grading 5.50 $68,959.00 $9.05 $113,466.90 $4,60 $57,674.80 $5.10 $63,943.80 $1,104.00 $1,705.00 $1,705.00 $1,100,00 $1,100.00 $400.00 $400.00 8 2 EA Furnish & Install 3" gate valve and box 1 122.90 3 61671 $2,255.00 1 ITEM DELETED BYADDENDUM $2,200.00 $400.00 $800.00 Sub -Total Section 2... .................... .... $189,513.03 4 6167 ITEM DELETED BYADDENDUM $164,600.00 Section Three -Landscape and Irrigation 11 11 11 �` -�' Scanted and compact ' subgrade to 1 1 LS urnish nstall complete Skid n Pump Irrigation Pump System 60,104.00 $60,104.00 5 1413 SY 95% density in drive 0.96 $1,356.48 $0.33 $466.29 $1.30 $1,836.90 $1.00 $1,413.00 $45,794.00 $45,794.00 $53,500.00 urnish nstall complete in place " of $33,000.00 $33,000.00 3 17.7 AC urnish & nstall ybritlBermuda Sprigging in designated areas 1,430.00 $25,311.00 6 1413 SY compacted commercial grade base 8.45 $11,939.85 $7.15 $10,102.95 $6.15 $8589.95 $4.00 $5,652.00 $205,299.72 $127,590.00 urnish install 4" reinforced concrete $94,240.00 Add/Deduct Items 7 89 LF pipe, Class III, tongue/groove 'install 99.50 $8,855.50 $60.25 $5,362.25 $140.00 $12,460,00 $55.00 $4,895.00 $165.00 $200.00 $200.00 urnish I XDot double 1 LF Drilling 17 1/2" diameter hole 45.77 $45.77 $27.50 $27,50 $44.00 $44.00 8 2 EA 24" type "B: headwall 2,149.00 $4,298.00 $2,788.50 $5,577.00 $3,500.00 $7,000.00 $2,500.00 $5,000.00 9 1503 LF Furnish & install silt fence per detail 2.15 $3,231.45 $1.38 $2,074.14 $6.00 $9,018.00 $2.00 $3,006.00 5 1 LF urn ish/Instal / rave ack / dia mill slotted screen urnish and mstaii post & cable fence per $114.44 $118.25 $118.25 $110.00 $110.00 $110.00 $110.00 6 10 2234 LF detail 2.80 $6,255.20 $3,58 $7,997.72 $11.50 $25,691.00 $5.00 $11,170.00 urnish ail abor, materials, tools and equipment for abandoning test hole 13,734.00 $13,734.00 $16,500.00 $16,500.00 $13,200.00 $13,200.00 $13,000.00 $13,000.00 8 1 LS Furnish & Install Irrigation System Valves 11 2 EA Furnish & install 24" pipe gate, per detail 1,800.00 $3,600.00 $660.00 $1,320.00 $850.00 $1,700.00 $1,100.00 $2,200.00 12 12 ITEM DELETED BYADDENDUM 13 13 ITEM DELETED BY ADDENDUM Sub -Total Section 1 114379548 I £1RR dQ9 n5 I C1A1 rnn ac Sub -Total Add/Deduct Section ............ 1 $45,877.53 Total Amount of Base Bid (Sum of Sects 1-3 Total Amount of Add/Deduct Items GRAND TOTAL AMOUNT ............... $55,247.00 1 1 $55,378.00 $473,683.51 $586,367,87 $497,501.65 Section Two -Water Well $61,629.82 $55,247.00 $519,561.04 $647,997.69 $552,748.65 Add pricing for bonds 1 1 LS Furnish & Install & develop complete in place a deep water well 126,521.15 $126,521.15 $122,727.00 $122,727.00 $135,000.00 $135,000.00 $111,500.00 $111,500.00 2 1 LS Furnish & Install complete in place a deep water well submersible pump 37,200.00 $37,200.00 $34,744.60 $34,744.60 $36,366.00 $36,36600 $33,000.00 $33,000.00 3 1 LS Furnish & Install complete in place, a pump/well pad 13,250.00 $13,250.00 $19,360.00 $19,360,00 $39,000.00 $39,000.00 $12,600.00 $12,600.00 -.4 75 LF urnish and Insta 3" PVC dr 1 discharge line 61.00 $4,575.00 $68.76 $5,157.00 $93.00 1 $6,975.00 $20.00 $1,500.00 1 EA Furnish and Install 3" singe check valve w/concrete vault 3,153.23 $3,153.23 $3,162.50 $3,162.50 $3,000= $3.000.00 $2,400.00 $2,400.00 1 EA Furnish and Install " meter/strainer with box 3,463.85 $3,463.85 $3,465.00 $3,465.00 $3,200.00 $3,200.00 $2,400.00 $2,400.00 _ 7 1 EA Furnish and Install 3" Tee 1,104.00 $1,104.00 $1,705.00 $1,705.00 $1,100,00 $1,100.00 $400.00 $400.00 8 2 EA Furnish & Install 3" gate valve and box 1 122.90 $245.80 $1,127.50 $2,255.00 $1,100.00 $2,200.00 $400.00 $800.00 Sub -Total Section 2... .................... .... $189,513.03 $192,576.10 $226,841.00 $164,600.00 Section Three -Landscape and Irrigation 11 11 11 �` -�' 1 1 LS urnish nstall complete Skid n Pump Irrigation Pump System 60,104.00 $60,104.00 $43,153.00 $43,153.00 $44,000.00 $44,000.00 $40,000.00 $40,000.00 2 1 LS urnish and Install complete Irrigation System w/mains and valves 54,960.00 $54,960.00 $45,794.00 $45,794.00 $53,500.00 $53,500.00 $33,000.00 $33,000.00 3 17.7 AC urnish & nstall ybritlBermuda Sprigging in designated areas 1,430.00 $25,311.00 $6,573.60 $116,352.72 $1,700.00 $30,090,00 $1,200.00 $21,240.00 Sub -Total Section 3 ........................ $140,375.00 $205,299.72 $127,590.00 $94,240.00 Add/Deduct Items 1 1 HR Additional Testing 171.68 $171.66 $165.00 $165.00 $165.00 $165.00 $200.00 $200.00 2 1 LF Drilling 17 1/2" diameter hole 45.77 $45.77 $27.50 $27,50 $44.00 $44.00 $33.00 $33.00 3 1 LF urnish/ nstai!emmet Grout 8 518 casing 17.20 $17.20 $21.45 $21.45 $17.00 $17.00 $20,00 $20.00 4 /TEM DELETED BY ADDENDUM 5 1 LF urn ish/Instal / rave ack / dia mill slotted screen 11444 $114.44 $118.25 $118.25 $110.00 $110.00 $110.00 $110.00 6 -- --1 LF- Furnish & Install " discharge column pipe ;-& 114" hydraulic plastic air line & --- -- --- 114 44 ------$114.44 ------$15 62 - ------$15.&2 ---$41.00- .------ ----$11.00 ----- -$15.00- - $15.00 7 1 LS urnish ail abor, materials, tools and equipment for abandoning test hole 13,734.00 $13,734.00 $16,500.00 $16,500.00 $13,200.00 $13,200.00 $13,000.00 $13,000.00 8 1 LS Furnish & Install Irrigation System Valves 31,680.00 $31,680.00 $44,782.00 $44,782.00 $41,700.00 $41,700.00 $42,000.00 $42,000.00 Sub -Total Add/Deduct Section ............ 1 $45,877.53 Total Amount of Base Bid (Sum of Sects 1-3 Total Amount of Add/Deduct Items GRAND TOTAL AMOUNT ............... $55,247.00 1 1 $55,378.00 $473,683.51 $586,367,87 $497,501.65 $45, 877.53 $61,629.82 $55,247.00 $519,561.04 $647,997.69 $552,748.65 Add pricing for bonds $12,664.92 $420,119.80 $55,378.00 $475,497.80 Todays Date. 02/11/02 CITY OF GRAPEVINE Bid Tabulation Form Bid 119-2002 Improvements to Meadowmere Park .Aiof 9 10 vc.mnoe cnnrrc PaniiPlca f1K Snr1 Item 10ty I Unit Item Description w , c Unit � t3otat � . _ Unllt .. Puce Total 1 1 LS urnish & install & develop complete In place a deep water well Section One -Site Work $122,000.00 $111,565.86 $111,565.86 2 1 20 AC tearing, titripptrig, UruDbing, Tree Removal & Grinding 1,650.00 $33,000.00 No Bid No Bid 2 12538 CY Unclassified excavation, including rough and fine grading 8.50 $106,573.00 No Bid No Bid 3 6167 No Bid ITEM DELETED BYADDENDUM 5 1 EA Furnish and Install " single check valve w/concrete vault 3,045.00 4 6167 No Bid ITEM DELETED BY ADDENDUM 1 EA urnish and Install "meter/strainer with box 3.248.00 $3.248.00 5 14131 SY can ied and compact " subgrade to 95% density in drive 1.35 $1,907.55 No Bid No Bid 6 1413 SY Furnish & Install complete in place 6" 07- compacted commercial grade base 25.00 $35,325.00 No Bid No Bid 7 89 LF Furnish & install 4" reinforced concrete pipe, Class III, tonguelgroove 43,711 $3,890.19 No Bid No Bid 8 2 EA Furnish & install standard TXDot double 24" type "B: headwall 1,040.00 $2.080.00 No Bid No Bid 9 1503 LF Furnish & install silt fence per detail 2.00 $3,006.00 No Bid No Bid 10 2234 LF Furnishand install post & cable fence per detail 12.00 $26,808.00 No Bid No Bid 11 2 EA Furnish & install 24" pipe gate, per detail 2,100.00 __$4,200.00j_No Bid No Bid 12 12 ITEM DELETED BY ADDENDUM AddlDeduct items 131 131 1 HR 1 ITEM DELETED BY ADDENDUM 172.501 $172.50 No Bid No Bid C„3._Tnr�f CnNinn 1 A71F 7Rq 74 ' S000 TOTALS: Total Amount of Base Bid (Sum of Sects 1.-3 Total Amount of Add/Deduct Items GRAND TOTAL AMOUNT, $548,409.24 $271,277.85 $52,663.00 $41.205.58 $601,072.24 $312,483.43 Page 3 BID SUMMARY (Low bid by vendor for base bid - Sects 1-3) Vendor Total Cost Dean Construction $420,119.80 Green Scalping $426,009.85 Section Two -Water Well $473,683.51 Sprinkle & Sprout $482,761.70 ALI Contractors 1 1 LS urnish & install & develop complete In place a deep water well 122,000.00 $122,000.00 $111,565.86 $111,565.86 2 1 LS Furnish & Install complete in place a deep water well submersible pump 47,000.00 $47,000.00 $31,668.45 $31,668.45 3 1 LS 7777X—Install complete in place, a pumplweil pad 10,000.00 $10,000.00 No Bid No Bid 4 75 LF urnish and Install " PVC dr 18 discharge line 58.94 $4,420.50 No Bid No Bid 5 1 EA Furnish and Install " single check valve w/concrete vault 3,045.00 $3,045.00 No Bid No Bid 6 1 EA urnish and Install "meter/strainer with box 3.248.00 $3.248.00 No Bid No Bid 7 1 EA Furnish and Install 3" Tee 1,066.00 $1,066.00 No Bid No Bid 8 2 EA Furnish & Install 3" gate valve and box 1,000.00 $2,000.00 No Bid No Bid Sub -Total Section 2.. ......... ........... $192,779.50 $143,234.31 Section Three -Landscape and Irrigation 1 1 LS urnish & Install complete Sikid n Pump Irrigation Pump System 41,500.00 $41,500.00 $39,849.91 $39,849.91 2 1 LS urnish and Install complete Irrigation System w/mains and valves 40,700.00 $40,700.00 $36,775.13 $36,775.13 3 17.7 AC urnish & Install Hybrid Bermuda Sprigging in designated areas 3,200.00 $56,640.00 $2,905.00 $51,418.50 Sub -Total Section 3 ........................ $138,840.00 $128.043.54 AddlDeduct items 1 1 HR Additional Testing 172.501 $172.50 No Bid No Bid 2 1 LF Dnlling 17 1/2" diameter hole 46.00 $46.00 No Bid No Bid 3 1 LF UmisNlnStal emmet Grout 8 5ib casing 17.50 $17.50 No Bid No Bid 41 ITEM DELETED BY ADDENDUM 5 1 LF Urnish/install! ravel Pa ! dla mill slotted screen 115.00 $115.00 No Bid No Bid 6 1 LF urnish & install 3" discharge column pipe.. & 1/4" hydraulic plastic air line & 12.00 $12.00 No Bid No Bid 7 1 LS Furnish all labor, materials, tools and equipment for abandoning test hole 13,800.00 $13,800.00 No Bid No Bid 8 1 LS Furnish & Install irrigation System Valves 38,500.00 $38,500.00 $41,205.58 $41,205.58 Sub-Total'Add/Deduct Section............ $52,663.00 $41,205.58 TOTALS: Total Amount of Base Bid (Sum of Sects 1.-3 Total Amount of Add/Deduct Items GRAND TOTAL AMOUNT, $548,409.24 $271,277.85 $52,663.00 $41.205.58 $601,072.24 $312,483.43 Page 3 BID SUMMARY (Low bid by vendor for base bid - Sects 1-3) Vendor Total Cost Dean Construction $420,119.80 Green Scalping $426,009.85 Am. Civil Cont. $473,683.51 Sprinkle & Sprout $482,761.70 ALI Contractors $497,501.65 TLB Construction $524,022.98 Sports Facilities $548,409.24 Miller Sierra $569,474.50 North Haven $566,367.87 OK Sod' $271,277.85 `Incomplete LU CL O w a G®@(B`J 00000 J a CC C F- ui F- Y 7 K Y m V a p 7 z F a V to L� m S m G @ 98S @0000 f w E gt V LAKE USE AGREEMENT BETWEEN ' CITY , INC.GRAPEVINE, TEXAS AND THE LONESOME DOVE RANCH, WHEREAS, the City of Grapevine, Texas ("City"), a home -rule municipality of the State of Texas, and Lonesome Dove Ranch, Inc. ("LDR"), an S Corporation authorized to do business in the State of Texas, desire to enter into this Agreement (the "Agreement"); and WHEREAS, there exists a lake known as Dove Lake, located at 2299 Lonesome Dove Road, Southlake, Texas, owned by LDR and more fully described in the attached Exhibit 'A' (the "Lake"); and WHEREAS, LDR utilizes the Lake for irrigation, fishing, and aesthetic purposes; and WHEREAS, the City is constructing a park recreational area in an area adjacent to the Lake and desires to utilize the Lake as an irrigation water storage facility; and WHEREAS, both the City and LDR will benefit from the terms of this Agreement. NOW THEREFORE, for the sum of ten dollars ($10.00) and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, and the mutual promises that are relied on by both parties, the City and LDR do hereby contract and agree as follows: I. All matters in the preamble are found to be true and correct and are incorporated into the body of the Agreement as if copied in their entirety. LIN The City shall be granted an easement over and across the area described and/or shown on the attached Exhibit `B" (the "Easement"), which is incorporated herein by reference. The Easement shall remain in effect for the duration of this agreement and shall be used only for the purpose of the City, its employees, contractors, and agents accessing the Lake, constructing water pumping and transfer facilities, repair or reconstruction of said facilities, and testing. The City shall be entitled to pump raw water into the Lake for storage purposes, via facilities constructed within the Easement. Any raw water pumped into the Lake shall be measured by the City —a it g a._.Mutually agreed_upon_metering system- T7pon request -the City shall provide_LDR an accounting of its water use from its metering system. The City is entitled to withdraw from the Lake an amount of water equal to the amount pumped into the lake by the City, subject to the reduction of a mutually agreed upon amount to account for evapotranspiration losses, and conditioned upon it being measured by the City. LAKE USE AGREEMENT- Page 1 i The City makes no warranties and assumes no responsibility for the quality of the raw water it is permitted to pump into the Lake, except to commit that the source of the raw water will be the Paluxy Reservoir. The City shall be responsible for all repair and maintenance of its piping and transfer facilities, including, but not limited to, the pipeline. M LDR shall not be permitted to remove from the Lake more water than it has pumped into the Lake or has entered the Lake naturally fromrunoff. In the event the City believes LDR is removing a disproportionate level of water from the Lake, the City may demand an accounting from LDR, which may include, but is not limited to, requiring the installation of a metering device for water pumped into and/or out of the Lake by LDR.. LDR agrees, as a condition to being provided the aesthetic benefits of the increased level of water in the Lake from the City, that use of the Lake by LDR shall be limited to irrigation purposes, swimming, fishing, and the use of non -motorized watercraft. LDR retains, reserves, and shall continue to enjoy the ownership and use of the surface of the Easement area subject to the terms of this Easement.. Any additional or expanded use of the Lake shall be subject to the prior written approval of the City. No improvements, alterations, or repairs shall be made to the Lake or the Easement without the agreement of both parties. The term of this agreement shall be for fifty (50) years from the date of execution. W In the case of failures to timely address defaults under this section, the City reserves the right to seek any and all remedies available to it under applicable law. V. INDEMNIFICATION LDR agrees to release, indemnify, and hold harmless the City, its officers, employees, agents, elected officials, attorneys and assigns from all liability for any such loss, damage, or injury, including death or injury of other persons, arising from any claims, demands, or lawsuits of other persons or entities concerning any such loss, damage, or injury, including death or injury of other persons, based ari�inout-o-the_neligence.f LnRssgrentLeaap�o�ees, or in any way connected to the design, construction, operation or maintenance of the Lake, and associated structures. The City agrees to release, hold harmless, and indemnify LDR, its agents, employees, and assigns from all liability for any such loss, damage, or injury, including; death or in'M of other j LAKE USE AGREEMENT- Page 2 persons arising out of the negligence of the City in the use operation, or maintenance of its equipment and pipe line and/or pumping of water into the lake. VI. In the event default occurs under this Agreement, the prevailing party shall be entitled to recover its costs and reasonable attorney's fees. W1 Venue for enforcement of this Agreement shall lie in the City Courts of Tarrant County, Texas, and shall be interpreted pursuant to the laws of the State of Texas. This Easement shall be assignable with the approval of the LDR, which approval shall not be unreasonably withheld. This easement, and its restrictions, shall run with the land. LDR shall retain all its rights to sell, transfer, lease, or otherwise dispose of its property without prior approval from the City. 100 LDR shall only assign this Agreement upon the prior written consent of the City, which consent shall not be unreasonably withheld. The City will approve no assignment unless the assignee executes an assignment and assumption agreement regarding this Agreement. The terms of this Agreement shall run with the Lake. LDR shall provide notice of the conditions contained herein to any subsequent purchaser or owner of the Lake. RO This Agreement contains the entire understanding of the parties with respect to the subject matter contained herein and there are no oral understandings, statements or stipulations bearing upon the meaning or effect of this Agreement which have not been incorporated herein. This Agreement may only be modified, amended, supplemented or waived by a written instrument executed by the parties herein. LAKE USE AGREEMENT- Page 3 All notices, demands and communications hereunder shall be in writing and may be served by regular mail, certified mail, return receipt requested, or via hand delivery at the address indicated below. The address of a party may be changed by notice given pursuant to this Article. If to City: City Of Grapevine Parks & Recreation Director P. O. Box 95104 Grapevine, Texas 76099 With copy to: Matthew C. G. Boyle Boyle & Lowry, L.L.P. 4201 Wingren, Suite 108 Irving, Texas 75062 If to LDR: Willie Ihnfeldt, Vice President 2299 Lonesome Dove Road Southlake, Texas 76092 EXECUTED this V-�' day of F6LXAK, 200,.. City of Grapevine: Roger Nelson, City Manager Attested: Linda Huff- City Secretary City Attorney • t ' • .4 6 i�l WIN lla LAKE USE AGREEMENT- Page 4 Lonesome Dove Ranch, Inc. The State of Texas County of Tarrant Before me, the undersigned rotary on this day personally appeared Willie Ihnfeldt, President of Lonesome Dove Ranch, Inc., known to me or proved to me through the presentation of a valid Texas Driver's License to be the person whose name is subscribed to the foregoing instrument and acknowledged to me that he executed the same for the purposes and consideration therein expressed. Mr. Ihnfeldt furthermore attested that he is signing this Agreement in his capacity as President of Lonesome Dove Ranch, Inc., and that such capacity makes his signature valid to bind himself personally and the company, Lonesome Dove Ranch, Inc. Seal: 0-1 Given under my hand and seal of office this � day of � , 2002, My Commission Expires: (� a MM NOTARYPUSUC State of Texas °` '" . EV. oe-oi,Wp Notary Public in and for the State of Texas AAGV Lonesome Dove Lake Use Agreement.doc Last printed 11/16/012:59 PM LAKE USE AGREEMENT- Page 5 TRImCOUNTY Electric Cooperative, Inc. "A Commitment to Service and Savings" Central Headquarters CXfwA / 500 N W Parkway I Azle, Tx 76020 1 Ph -'(81 7)444-3201 or (817)523-7231 / Fax * (817)444-3542 southwest District OfkA I I eM Weatherford Hwy./ Granbury, Tx 79048 I Pb -,(617)279-7010 / Fax # (817)279-7012 Northeast District Oftice / 4740 Keller HIc" Rd, i Keller, TY 7e248 I Ph:(817)431-1541 i Fax # (8172 431-9880 9-K District Office 1418 N. Main, P 0 Box Ora~ 4672 / Seymour, Tx 76360 / Ph: / Fax # (940)888-3820 111;4 0 94',VA4114 4 Y 14Z k A (W1 4ATI (a] q February 25, 2002 Mr. Joseph D. Moore AsSt. Dir. Parks & Rec. City of Grapevine P.C. Box 95104 Grapevine, Texas 76099 Dear Mr. Moore: Based on the plans submitted, the cost to extend overhead three phase electric utility servlet to your proposed three phase load(s) at Meadowmere Park is $52,606.43. This Contribution -In -Aid -Of -Construction is due before we commence construction and excludes any costs associated with obtaining easements from private landowners. As you are aware, current plans indicate that a permit from the Corps of Engineers is the only "easement" necessary to extend our distribution facilities, This price is good for 30 days from letter date. If the above meets your understanding and approval, please acknowledge below. Please feei free to contact me at 817-431-1541 should you have any questions or concerns. I hope I can be of service to the City in the future. Sincerely, Accepted by: Name Scott D. BaumBach Manager, Northeast District Title Date