CHANGE ORDER NO. 1 — PARR ROAD CONSTRUCTION
PROJECT
City Council consider approving Change Order No. 1 to the Parr Road Construction
Contract in the amount of $180,659.98 for various items required during the construction
of the Parr Road project, authorize staff to execute said Change Order, and take any
necessary action.
FUNDING SOURCE:
Funds are currently available and programmed as follows:
Funding Source
Account
Amount
Award
Percent
99 GO Bonds
178-78101-010
$458,665
12.8%
00 GO Bonds
178-78102-011
$2,643,091
$180,659.98
73.7%
Peripheral Fees
178-21512-000
$172,750
4.8%
99 Utility Bonds
200-48930-534-5-000010WA
$147,595
4.1%
Water Impact Fees
200-48930-534-6-000004WA
$161,766
4.5%
Parks Admin Spec
Services
100-44540-312-1
$4,500
.1%
TOTAL
$3,588,367
$180,659.98
100%
Budget
Amount
Award
Percent
Engineering
$282,500
7.9%
Construction
$2,930,074
$180,659.98
81.6%
Testing
$40,000
1.1%
ROW Acq
$109,384
3.1%
Contingency
$226,409
6.3%
TOTAL
$3,588,367
$180,659.98
100%
BACKGROUND:
The Parr Road project has proved challenging because of the utility coordination and
adjustments, as well as the temporary traffic routing and detour construction in the
March 28, 2002 (8:30AM)
el a
narrow width of the finished pavement. The narrow pavement precluded the contractor's
option of building one-half of the pavement section and then maintaining two-way traffic
on the newly constructed section while the remaining half of the pavement was
constructed. The 27 -foot wide pavement section required that half of the roadway be
constructed while a temporary asphalt detour lane was constructed and used to maintain
two-way traffic north and south.
Included in the change order are the following items:
• The deep cut in the roadway grade, particularly just south of the Parr Road / Parr
Lane intersection, required a number of detour implementations, traffic re-routing
which significantly impacted the final cost of the asphalt detour. The added asphalt
lane was the only choice for the project to provide adequate access to the two
neighborhoods at the far north end of Parr Road (that have no other access). The
area around the Parr Road / Parr Lane intersection is the location where the need for
the added temporary paving was most required ($37,209.60).
• The installation of additional sanitary sewer lines to provide for sewer to the existing
homes on the north side of Parr Lane at the intersection with Parr Road as well as
the ability for properties just north of O'dell Court to be served by sewer at the time
they choose to connect ($ 20,424.20).
hQ,
• Storm drainage and water connections to the Walker Estates Subdivision which was
not in place at the time of the construction plan preparation for Parr Road
($17,670.00).
• Localized yard drainage systems to collect surface water and 700 feet of under -drain
to collect groundwater encountered along Parr Road ($ 18,473.75).
• Additional parking spaces and concrete drive surface in the vicinity of the entrance
drive into Parr Park ($78,373.65).
• Miscellaneous adjustments ($ 8,508.78).
Staff recommends approval.
JSL/dsm
0:\agenda\040202\Pa rrRd_ChangeOrder_l . agm
March 28, 2002 (8:30AM)
CITY OF GRAPEVINE
CONTRACT MODIFICATION AGREEMENT
W.T. Parr Road 1 Parr Lane Reconstruction
PROJECT:
OWNER:
City of Grapevine
ENGINEER:
Kimley-Horn and Associates,
CONTRACTOR:
J.L. Bertram Construction and
COST
1007 Harrison Avenue
DESCRIPTION
Arlington, Texas 76011
DATE
March 21, 2002
CHANGE ORDER NO:
One
Inc.
Engineering, Inc.
Number of Days added to the Contract by this change order: 120 Days
Original Contract Amount
Previous Change Orders
Change Order One
Adjusted Contract Amount
$2,661,154.37
$0.00
$180,659.98
$2,841,814.35
The compensation agreed upon in this Change Order is for all costs the CONTRACTOR has incurred or may incur as a result of or relating to the
changes in the scope of work whether said costs are known, unknown, foreseen or unforeseen at this time, including without limitation, any cost
for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged work as a result of this Change
Order. The compensation is for fully complete and in-place construction. The actual quantities of items installed or constructed have been
measured and the quantities herein are adjusted accordingly.
Approved By:
Jerry Hodge, Public Works Director
Approved By:
o:\johnny\2002\parrroad\changeorder1 a.XLS
Approved By:
Approved By:
UNIT
CONTRACT
`QUANTITY
REVISED
REVISED
COST
ITEM
DESCRIPTION
UNIT
PRICE
QUANTITY
CHANGE
QUANTITY
COST;
ADJUSTMENT
Add Items
1A
4" San Sewer tap
EA
$1,695.00
2.00
2.00
$3,390.00
$3,390.00
2A
18" Steel Casing
LF
$65.60
18.00
18.00
$1,180.80
$1,180.80
3A
12" PVC SDR -35 San Sewer Pipe (8-12')
LF
$46.70
520.00
520.00
$24,284.00
$24,284.00
4A
Plug 18" RCP Storm Sewer Pipe
EA
$165.00
2.00
2.00
$330.00
$330.00
5A
Temporary Fire Hydrant relocation
EA
$440.00
1.00
1.00
$440.00
$440.00
6A
1/2 day crew
EA
$1,925.00
1.00
1.00
$1,925.00
$1,925.00
7A
1-1/2" water service
EA
$1,650.00
1.00
1.00
$1,650.00
$1,650.00
8A
2'x2' drop inlet
EA
$1,023.75
1.00
1.00
$1,023.75
$1,023.75
9A
Subdrain
LF
$20.00
700.00
700.00
$14,000.00
$14,000.00
10A
Hydromulch
SY
$2.25
110.00
110.00
$247.50
$247.50
11A
Re -work Water and Sanitary service
LS
$2,832.90
1.00
1.00
$2,832.90
$2,832.90
12A
4" HMAC Subgrade
SY
$7.89
502.00
502.00
$3,960.78
$3,960.78
13A
Connect to existing storm system
EA
$750.00
2.00
2.00
$1,500.00
$1,500.00
Contract Items
4
Unclassified Street Excavation
CY
$7.74
5,700.00
580.00
6,280.00
$48,607.20
$4,489.20
22
3" TY D Temp HMAC Pvmt
SY
$19.20
8,312.00
1,938.00
10,250.00
$196,800.00
$37,209.60
39
18" RCP Class III
LF
$44.00
1,867.00
155.00
2,022.00
$88,968.00
$6,820.00
44
1'x1' Grate Inlet
EA
$325.00
20.00
2.00
22.00
$7,150.00
$650.00
46
6" PVC Drain Pipe
LF
$14.00
112.00
200.00
312.00
$4,368.00
$2,800.00
61
Connection to Existing Water main - 8"
EA
$2,475.00
3.00
3.00
6.00
$14,850.00
$7,425.00
69
Concrete Encasement
LF
$38.00
14.00
56.00
70.00
$2,660.00
$2,128.00
71
4' dia sanitary sewer manhole (0-6')
EA
$1,600.00
5.00
2.00
7.00
$11,200.00
$3,200.00
73
5' dia sanitary sewer drop manhole
EA
$5,400.00
1.00
-1.00
0.00
$0.00
($5,400.00)
76
6" PVC SDR -35 San Sewer Pipe (0-6')
LF
$28.00
114.00
410.00
524.00
$14,672.00
$11,480.00
77
6" PVC SDR -35 San Sewer Pipe (6-8')
LF
$33.00
598.00
-468.00
130.00
$4,290.00
($15,444.00)
78
6" PVC SDR -35 San Sewer Pipe (8-10')
LF
$37.00
635.00
123.00
758.00
$28,046.00
$4,551.00
79
6" PVC SDR -35 San Sewer Pipe (10-12')
LF
$40.00
397.00
-220.00
177.00
$7,080.00
($8,800.00)
80
12" Steel Casing
LF
$61.00
18.00
-18.00
0.00
$0.00
($1,098.00)
ALT1
6" cement stabilized subgrade
SY
$2.21
1,585.00
1,740.00
3,325.00
$7,348.25
$3,845.40
ALT2 Furnish & Place Cement TY I (27#/SY)
Ton
$96.47
23.00
24.00
47.00
$4,534.09
$2,315.28
ALT3 6" reinforced Concrete Pavement
SY
$38.19
1,673.00
1,740.00
3,413.00
$130,342.47
$66,450.60
ALTS Concrete Wheel Stops
EA
$34.41
9.00
37.00
46.00
$1,582.86
$1,273.17
Number of Days added to the Contract by this change order: 120 Days
Original Contract Amount
Previous Change Orders
Change Order One
Adjusted Contract Amount
$2,661,154.37
$0.00
$180,659.98
$2,841,814.35
The compensation agreed upon in this Change Order is for all costs the CONTRACTOR has incurred or may incur as a result of or relating to the
changes in the scope of work whether said costs are known, unknown, foreseen or unforeseen at this time, including without limitation, any cost
for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged work as a result of this Change
Order. The compensation is for fully complete and in-place construction. The actual quantities of items installed or constructed have been
measured and the quantities herein are adjusted accordingly.
Approved By:
Jerry Hodge, Public Works Director
Approved By:
o:\johnny\2002\parrroad\changeorder1 a.XLS
Approved By:
Approved By: