MEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: ROGER NELSON, CITY MANAGER f� V
MEETING DATE: APRIL 2, 2002
SUBJECT: CHANGE ORDER NO. 1 — PARR ROAD CONSTRUCTION
PROJECT
RECOMMENDATION:
City Council consider approving Change Order No. 1 to the Parr Road Construction
Contract in the amount of $180,659.98 for various items required during the construction
of the Parr Road project, authorize staff to execute said Change Order, and take any
necessary action.
FUNDING SOURCE:
Funds are currently available and programmed as follows:
Funding Source Account Amount Award Percent
99 GO Bonds 178-78101-010 $458,665 12.8%
00 GO Bonds 178-78102-011 $2,643,091 $180,659.98 73.7%
Peripheral Fees 178-21512-000 $172,750 4.8%
99 Utility Bonds 200-48930-534-5-000010WA $147,595 4.1%
Water Impact Fees 200-48930-534-6-000004WA $161,766 4.5%
Parks Admin Spec
Services 100-44540-312-1 $4,500 .1%
TOTAL $3,588,367 $180,659.98 100%
Budget Amount Award Percent
Engineering $282,500 7.9%
Construction $2,930,074 $180,659.98 81.6%
Testing $40,000 1.1%
ROW Acq $109,384 3.1%
Contingency $226,409 6.3%
TOTAL $3,588,367 $180,659.98 100%
BACKGROUND:
The Parr Road project has proved challenging because of the utility coordination and
adjustments, as well as the temporary traffic routing and detour construction in the
March 28,2002 (8:30AM)
elt
narrow width of the finished pavement. The narrow pavement precluded the contractor's
ay . , option of building one-half of the pavement section and then maintaining two-way traffic
on the newly constructed section while the remaining half of the pavement was
constructed. The 27-foot wide pavement section required that half of the roadway be
constructed while a temporary asphalt detour lane was constructed and used to maintain
two-way traffic north and south.
Included in the change order are the following items:
• The deep cut in the roadway grade, particularly just south of the Parr Road / Parr
Lane intersection, required a number of detour implementations, traffic re-routing
which significantly impacted the final cost of the asphalt detour. The added asphalt
lane was the only choice for the project to provide adequate access to the two
neighborhoods at the far north end of Parr Road (that have no other access). The
area around the Parr Road / Parr Lane intersection is the location where the need for
the added temporary paving was most required ($37,209.60).
• The installation of additional sanitary sewer lines to provide for sewer to the existing
homes on the north side of Parr Lane at the intersection with Parr Road as well as
the ability for properties just north of O'dell Court to be served by sewer at the time
they choose to connect ($ 20,424.20).
hQ,
• Storm drainage and water connections to the Walker Estates Subdivision which was
not in place at the time of the construction plan preparation for Parr Road
($17,670.00).
• Localized yard drainage systems to collect surface water and 700 feet of under-drain
to collect groundwater encountered along Parr Road ($ 18,473.75).
• Additional parking spaces and concrete drive surface in the vicinity of the entrance
drive into Parr Park ($78,373.65).
• Miscellaneous adjustments ($ 8,508.78).
Staff recommends approval.
JSL/dsm
0:\agenda\040202\Pa rrRd_ChangeOrder_l.agm
k
March 28,2002 (8:30AM) -
CITY OF GRAPEVINE
CONTRACT MODIFICATION AGREEMENT
PROJECT: W.T. Parr Road/Parr Lane Reconstruction
OWNER: City of Grapevine
ENGINEER: Kimley-Horn and Associates, Inc.
CONTRACTOR: J.L. Bertram Construction and Engineering, Inc.
1007 Harrison Avenue
Arlington,Texas 76011
DATE March 21,2002
CHANGE ORDER NO: One
UNIT CONTRACT QUANTITY REVISED REVISED COST
ITEM DESCRIPTION UNIT PRICE QUANTITY CHANGE QUANTITY COST; ADJUSTMENT
Add Items
1A 4"San Sewer tap EA $1,695.00 2.00 2.00 $3,390.00 $3,390.00
2A 18"Steel Casing LF $65.60 18.00 18.00 $1,180.80 $1,180.80
3A 12"PVC SDR-35 San Sewer Pipe(8-12') LF $46.70 520.00 520.00 $24,294.00 $24,284.00
4A Plug 18"RCP Storm Sewer Pipe EA $165.00 2.00 2.00 $330.00 $330.00
5A Temporary Fire Hydrant relocation EA $440.00 1.00 1.00 $440.00 $440,00
6A 1/2 day crew EA $1,925.00 1.00 1.00 $1,925.00 $1,925.00
7A 1-1/2"water service EA $1,650.00 1.00 1.00 $1,650.00 $1,650.00
8A 2'x2'drop inlet EA $1,023.75 1.00 1.00 $1,023.75 $1,023.75
9A Subdrain LF $20.00 700.00 700.00 $14,000.00 $14,000.00
10A Hydromulch SY $2.25 110.00 110.00 $247.50 $247.50
11A Re-work Water and Sanitary service LS $2,832.90 1.00 1.00 $2,832.90 $2,832.90
12A 4"HMAC Subgrade SY $7.89 502.00 502.00 $3,960.78 $3,960.78
13A Connect to existing storm system EA $750.00 2.00 2.00 $1,500.00 $1,500.00
Contract Items
4 Unclassified Street Excavation CY $7.74 5,700.00 580.00 6,280.00 $48,607.20 $4,489.20
22 3"TY D Temp HMAC Pvmt SY $19.20 8,312.00 1,938.00 10,250.00 $196,800-00 $37,209.60
39 18"RCP Class III LF $44.00 1,867.00 155.00 2,022.00 $88,968.00 $6,820.00
44 1'x1'Grate Inlet EA $325.00 20.00 2.00 22.00 $7,150.00 $650,00
46 6"PVC Drain Pipe LF $14.00 112.00 200.00 312.00 $4,368.00 $2,800.00
61 Connection to Existing Water main-8" EA $2,475.00 3.00 3.00 6.00 $14,850.00 $7,425.00
69 Concrete Encasement LF $38.00 14.00 56.00 70.00 $2,660.00 $2,128.00
71 4'dia sanitary sewer manhole(0-6') EA $1,600.00 5.00 2.00 7,00 $11,200.00 $3,200.00
73 5'dia sanitary sewer drop manhole EA $5,400.00 1.00 -1.00 0.00 $0.00 ($5,400.00)
76 6"PVC SDR-35 San Sewer Pipe(0-6') LF $28.00 114.00 410.00 524.00 $14,672.00 $11,480.00
77 6"PVC SDR-35 San Sewer Pipe(6-8') LF $33.00 598.00 -468.00 130.00 $4,290.00 ($15,444.00)
78 6"PVC SDR-35 San Sewer Pipe(8-10') LF $37.00 635.00 123.00 758.00 $28,046,00 $4,551.00
79 6"PVC SDR-35 San Sewer Pipe(10-12') LF $40.00 397.00 -220.00 177.00 $7,080.00 ($8,800.00)
80 12"Steel Casing LF $61.00 18.00 -18.00 0.00 $0.00 ($1,098.00)
ALT1 6"cement stabilized subgrade SY $2.21 1,585.00 1,740.00 3,325.00 $7,348.25 $3,845A0
ALT2 Furnish&Place Cement TY I(27#/SY) Ton $96.47 23.00 24.00 47.00 $4,534.09 $2,315.28
ALT3 6"reinforced Concrete Pavement SY $38.19 1,673.00 1,740.00 3,413.00 $130,342.47 $66,450.60
ALT5 Concrete Wheel Stops EA $34.41 9.00 37.00 46.00 $1,582.86 $1,273.17
Number of Days added to the Contract by this change order: 120 Days
Original Contract Amount $2,661,154.37
Previous Change Orders $0.00
Change Order One $180,659.98
Adjusted Contract Amount $2,841,814.35
The compensation agreed upon in this Change Order is for all costs the CONTRACTOR has incurred or may incur as a result of or relating to the
changes in the scope of work whether said costs are known,unknown,foreseen or unforeseen at this time,including without limitation,any cost
for delay,extended overhead,ripple or impact cost,or any other effect on changed or unchanged work as a result of this Change
Order.The compensation is for fully complete and in-place construction.The actual quantities of items installed or constructed have been
measured and the quantities herein are adjusted accordingly.
Approved By: _ Approved By:__
Jerry Hodge,Public Works Director
Approved By: ---- --- ----. Approved By: _. -----._ -
o:\johnny\2002\parrroad\changeorderl a.XLS
Z aF
� Q
Q LL
a
i
i
v
06
QVMf 2f?`sld
�`.R„ .", ! 2 F `°� #`y*ter., � �� � " ✓""""� � {� �� ��,..- 3 � "Y,�
—'��i � � �...' `b..,�Y,.� �,w^.�. ......_L � L_...m,W....._.��..,.e_,,,..�..�..�t4,�. L........y,....„„.„.„,�'V� jai } ➢ g �3 11(�
\ P ;
E # 4