MEMO TO: HONORABLE MAYOR AND MEMBERS OF HE CITY COUNCIL
FROM: ROGER NELSON, CITY MANAGER iq
MEETING DATE: MAY 7, 2002
SUBJECT: TIF IMPROVEMENTS FOR RUTH WALL ROAD — CHANGE
ORDER #3 AND CHANGE ORDER #4.
RECOMMENDATION:
City Council consider approving Change Order #3 to correct bid quantities and the
Opryland force main extension in an amount of $95,559.88 and Change Order #4 for
installation of a communication duct bank from the Opryland Hotel to the Opryland
employee center in an amount of $137,460.89, authorize staff to execute said change
orders, and take any necessary action.
FUNDING SOURCE:
Account #173-48899-0003, TIF II/Ruth Wall Construction.
BACKGROUND:
TIF improvements for Opryland Texas include improvements to Ruth Wall Road and
improvements to the City's water and sanitary sewer systems. The Ruth Wall Road
project scope includes three gravity sanitary sewer lines, a sanitary sewer lift station and
a sanitary sewer force main.
Change Order #3:
Bid item quantities for many of the sanitary sewer improvements were inaccurate and an
adjustment is reflected in this change order to provide a more accurate representation of
plan quantities. These items are itemized in detail on the attached change order. The
total dollar amount for these items is $47,854.80.
The 14" Opryland force main is proposed to be extended an additional 426 LF along
Dove Loop Road to connect to a deeper and larger diameter section of the existing
gravity sewer system. The extension is needed to minimize the risk of overflows and
minimize the potential for odor at the connection to the sewer system. The total dollar
amount for this item is $47,705.08.
The total dollar amount for Change Order #3 is $95,559.88.
May 1, 2002 (8:48AM)
Change Order #4:
A communications duct bank is proposed to be extended along the west Ruth Wall Road
right of way to the Opryland Employee Center by change order to the Ruth Wall project.
The communications duct bank will provide a link for telephone and high speed
communications between the hotel and the employee center. The additional scope of
work will be funded by the Gaylord Hotels (see attached letter). The advantage to
performing the work under the Ruth Wall contract is the cost savings realized by
completing the work prior to installation of paving and sidewalks and the limiting of the
number of contractors working on the project site.
The total dollar amount for Change Order #4 is $137,460.89.
Staff recommends approval.
May 1, 2002 (8:51 AM)
zsp
CONTRACT MODIFICATION AGREEMENT C.O. # 3
A change to the terms of the Contract below is agreed as follows:
PROJECT: TIF IMPROVEMENTS FOR OPRYLAND TEXAS, PHASE 2 - RUTH WALL ROAD, LIFT STATION AND
SEWER IMPROVEMENTS
OWNER: City of Grapevine
ENGINEER: CARTER & BURGESS, INC.
CONTRACTOR: AUI CONTRACTORS, INC.
CHANGE ORDER NO: 3
DATE: 04-3-2002
The compensation agreed upon in this Change Order is for all costs the CONTRACTOR has incurred or may incur as a result of or
relating to the changes in the scope of work whether said cost are known, unknown, foreseen or unforeseen at this time, including
without limitation, any cost for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged work as
a result of this Change Order. The compensation will be for fully complete and in-place construction and the actual quantities of
items installed or constructed will be measured and the quantities herein adjusted accordingly.
A. CHANGE IN SCOPE OF WORK:
Quantity Revisions
Force Main Extension
B. DETAILED UNIT COSTS, QUANTITIES & TOTAL CONTRACT PRICE CHANGES
Quantity Revisions _. - , 11-:1 r -4—i— RPVISP(i
Quantity ttevisions zwmuLai
Force Mai Extesions
Chance Unit Extension
11-1$47,70b.Ud
Force Main Extension Subtotal
98220906.RW ChangeOrder3.xls
CONTRACT MODIFICATION AGREEMENT C.O. # 3
TOTAL THIS CHANGE ORDER
C. SUMMARY OF NET CHANGES TO CONTRACT AMOUNT AND TIME
original Contract Amount
$5,889,576.70
;hange Order No. 1
($3,050.00
hange Order No. 2
$47,347.02
hange Order No. 3
$95,559.88
:hange Order No. 4
Revised Contract Amount
$6,029,433.60
Number of Days added to the Contract Time by this chang 12 Days
Last day of the Contract Time:
D. APPROVALS
City of Grapevine
By:
Jerry L. Hodge
Director of Public Works
Engineer
By: 11&4
Burt Weathersbef
Carter & Burgess
By:
D is
B. DOUG ALUMBAUGH
EXEC. VICE PRESIDENT
f�
AUI MANAGEM= LLO
GENERAL PARTNER OR
AUI CONTRACTORS, L.P.
98220906. RW ChangeOrder3.xls
Date
Date
I� r Of
CONTRACT MODIFICATION AGREEMENT C.O. i# 4
A change to the terms of the Contract below is agreed as follows:
PROJECT: TIF IMPROVEMENTS FOR OPRYLAND TEXAS, PHASE 2 - RUTH WALL ROAD, LIFT STATION AND
SEWER IMPROVEMENTS
OWNER: City of Grapevine
ENGINEER: CARTER & BURGESS, INC.
CONTRACTOR: AUI CONTRACTORS, INC.
CHANGE ORDER NO: 4
DATE: 04-03-2002
The compensation agreed upon in this Change Order is for all costs the CONTRACTOR has incurred or may incur as a result of or
relating to the changes in the scope of work whether said cost are known, unknown, foreseen or unforeseen at this time, including
without limitation, any cost for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged work as
a result of this Change Order. The compensation will be for fully complete and in-place construction and the actual quantities of
items installed or constructed will be measured and the quantities herein adjusted accordingly.
A. CHANGE IN SCOPE OF WORK:
Communications Duct Bank Extension
B. DETAILED UNIT COSTS, QUANTITIES & TOTAL CONTRACT PRICE CHANGES
$5,889,576.70
Change Order No. 1
(53,050.00)
Change
Revised
Change Order No, 3
Unit
Extension
Revised
ITEM DESCRIPTION in Qty
Quantity
UNITS
$
Price
46.19
Net Change
$83,742 47
Amount
$83,742 47
1098 4T4 2T2 (4 4" Schedule 40 PVC) With Backfill C 1813
- -- — -._ - __-_ _ -- - - -
1813
g
LF
LF 3
4 200 00 -
W6 800 00
$37,800.00
112 Oldcastle Communication Vaults 4
-- - - -
-- - 262
262
LF $
140 91 -
336 918.42
536,918 42
113 12=8are-ar��-SLC Casing__-
TOTAL THIS CHANGP ORDER
C. SUMMARY OF NET CHANGES TO CONTRACT AMOUNT AND TIME
Original Contract Amount
$5,889,576.70
Change Order No. 1
(53,050.00)
Change Order No. 2
$47,347.02
$95,559.88
Change Order No, 3
5137,460.89
Change Order No. 4
$6,166,894.49
Revised Contract Amount
Number of Days added to the Contract Time by this change order: Days
Last day of the Contract Time:
D. APPROVALS
City of Grapevine
By:
Jerry L. Hodge Date
Director of Public Works
Engineer arq
-- jL* ♦ W `
By'�.A.�M`tinez KKDate
Carter & Burgess
Contract
By
Date
98220906. RW ChangeOrder4.As
HDC
EXAS
04/02/2002` 4wcw- 103-w17 rK4�1 u HOTELS 615 316 668% TO 9191741088$7
GAYLORD 140TELs"
Dima M. Bp2mmo. AIA
April 1, 2002
Mr. Dean Wilkerson
Sr. Project Manager
HOC International
1507 Gaylord Trail, No.105
Grapevine, TX 76501
RE; G#ord Oprytand Hotel
Ruth Well Road Communication Conduits
Dear Mr. Wilkeesan,
PAGE 02
P. 02/02
RECEIVED
APR - 2002
HDC INTERNATIONAL.
GAYLORD OPRYLAND - TEXAS
via Facsimile and Mall
As previously discussed, Gaylord Hotels authorizes the installation of the communication duct
bank located underneath the hike / bike trail along the West side of Ruth Wall Road due to the
timing of the installation of the hike 1 biks trail. Therefore, Gaylord Hotels requests that HOCI
notify the City of Grapevine of this authorization as follows'
1. Authorize the City of Grapevine to notify AUI General Contractors to proceed with the
installation of communication conduits and vaults as Indicated in their letter to HDCI
dated March 26, 2002. The total costs for this work are not to exceed $137,460.89.
2. Gaylord Hotels understands that this work will be a ohange order to the existing TIP No. 2
contract per' the amount above.
3. Please confirm with the City of Grapevine payment procedures for this work and notify
Gaylord Hotols of the procedurm
please don't hesitate to call with any questions or comments regarding this matter_
Sincerely, .
Gaylord Hotels
David M. Breeding, ALA
Prollact Director
cc: pave Kloeppel
Carter Todd
Pete Cesah
Paul Underkoffler
Naahvcllc • , T�