MEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
n/
FROM: ROGER NELSON, CITY MANAGER1
MEETING DATE: JULY 16, 2002
SUBJECT: ENGINEERING SERVICES CONTRACT AMENDMENT # 1 — BS
114L
RECOMMENDATION:
City Council consider approving Amendment # 1 to the Engineering Services Contract
with Nathan D. Maier Consulting Engineers for the design of the BS 114L
Reconstruction Project in an amount not to exceed $62,230.00, authorize staff to
execute said amendment, and take any necessary action.
FUNDING SOURCE:
Funds are available as follows:
Funding Source
00 GO Bonds
TOTAL
Account
178-78103-011
Amount Award Percent
$778,322.63 $62,230.00 100%
$778,322.63 $62,230.00 100%
Budget
Amount Award Percent
Engineering
$598,755.00 $62,230.00 76.9%
Contingency
$179,567.63 23.1%
TOTAL
$778,322.63 $62,230.00 100%
BACKGROUND:
City Council approved the original contract with Nathan D. Maier Consulting Engineers
for the design of the paving and drainage facilities in an amount of $536,525.00 on
January 16, 2001. The City of Grapevine is to fund the design of BS 114L while TxDOT
and NCTCOG are funding the construction of the paving and drainage improvements.
The proposed design section in the original contract was a five lane section from Dallas
Road to Wall Street and a four lane divided section from Dallas south to State Highway
114. With the added traffic generated by the Opryland facility to the north of this project,
a six lane divided section is more appropriate to carry the traffic flows for the full length
of the project. The design change to a six lane section has been presented to NCTCOG
and additional construction funding was approved at the July 11, 2002 RTC Meeting.
July 9, 2002 (4:41 PM)
The proposed contract amendment #1 in an amount of $62,230.00 with Nathan D. Maier
12
Consulting Engineers includes:
• change in roadway design from a five lane and four lane divided pavement section to
a six lane section.
• design of a 12" water line from Dallas Road south to State Highway 114.
• added environmental assessment requirements imposed since January 1, 2001.
• survey work necessary to re -survey the area north of Dallas Road for a six lane
divided section as well as record the new railroad improvements through which the
roadway improvements will pass.
The consultant's initial contract for Basic Services was significantly below the
Engineering Fee Curves. The addition to Basic Services in the lump sum amount of
$37,000.00 still maintains a Basic Services fee well below the Engineering Fee Curves
for this type of project.
The Special Services fee proposal in the amount of $25,230.00 is a "not to exceed"
figure that will be utilized as necessary on an hourly basis.
Staff recommends approval.
JSL/Ig
0:\AGENDA\07-16-02\ ENGR CONTRACT AMENDMENT # 1 — BS 114L.doc
July 11, 2002 (1:19PM)
Jul 08 02 11:55a
SID
July 3, 2002
Nathan D Maier C.E. e147395bbi
NATHAN D. MAIER
CONSULTING ENGINEERS, INC.
Ms. Lorna Gibson, P.E.
Public Works Department
City of Grapevine
P. O. Box 95104
Grapevine, Texas 76099
RE: BS114L —SH 114 to Wall Street
Revised Engineering Fees
NDIITCE Job No.: 01-01-008
Dear Lorna:
Attached is a revised fee schedule for the BSI14L project. The increased fee is a result of the
increased scope of the project, additional time and effort required for approval of the scope
change, changes in TxDOT processes, and changed field conditions.
1. Basic Services — Roadway Design
The increase in this item reflects the additional design effort required due to the increased
scope of the project and the additional time and effort required for approval of the change in
project scope.
2. Basic Services — Water and Sewer Design
The increase in this item reflects the additional design effort required due to the increased
scope of the project. The 12" water line will be extended from Dallas Road to SH 114,
which doubles its length under the contract, but there is a decrease in the replacement of the
8" line.
3. Special Services — Design Survey
TxDOT is nearing completion of the railroad overpass north of Dallas Road. This project
will require re -survey of about 1/3 of the BSI 14L project before we complete final design.
4. Special Services — Environmental Analysis
The increase in this item reflects additional work effort required to comply with current
TxDOT and FHWA requirements for the NEPA process. The additional work is due to a
more rigorous, more detailed process rather than additional work items.
All other items are proposed to remain the same. if you have any questions or need additional
information, please do not hesitate to call me.
Sincerely,
NATHAN D. MAIER
El`1 x ERS, INC.
Gordon J. Mayet, ., P.E.
GJM/klb
Attachment
Two. North Park 1 8080 Park Laue / Suite 600 / Dallas, Texas 75231 1 (214) 739-4741
'Jul uo vc il:ooa
IN
pus
Ila Lnan L Pia ler l.. t.
BASIC SERVICES
Roadway Design
Water and Sewer Design
TOTAL BASIC SERVICES
C- it l.7bbbb1
BS 114L - SH 114 to Wall Street
Revised Engineering Fees
SPECIAL SERVICES
ROW Survey
Design Survey
Schematic Design
Environmental Analysis
404 Permit Application
Hydraulic Analysis
Geotechnical Investigation
Landscape Architecture
Reimbursable Expenses
TOTAL SPECIAL SERVICES
TOTAL ENGINEERING
APPROVED
PROPOSED
TOTAL
FEE
FEE REVISION
REVISED FEE
249,400
25,000
274,400
48,130
12,000
_ 60,130
$297,530
$37,000
$334,530
34,150
-0-
34,150
36,985
12,330
49,315
27,370
-0-
27,370
31,000
12,900
43,900
18,500
-0-
18,500
28,980
-0-
28,980
9,700
-0-
9,700
44,810
-0-
44,810
7,500
-0-
_ 7,500
$238,995
$25,230
$264,225
$536,525
S62,230
$598,755
r