HomeMy WebLinkAboutItem 18 - Bluebonnet Hole No. 4 RestroomMEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: ROGER NELSON, CITY MANAGER��t/
MEETING DATE: JULY 16, 2002
SUBJECT: GRAPEVINE MUNICIPAL GOLF COURSE
CHANGE ORDER No. 2
BLUEBONNET HOLE NO. 4 RESTROOM
RECOMMENDATION:
City Council consider approval of Change Order No. 2 to the construction contract with
Wadsworth Golf Construction Co. for the construction of the Pecan Course of the
Grapevine Municipal Golf Course in the amount of $ 45,914.00, for the construction of a
restroom on the Bluebonnet Course of the Grapevine Municipal Complex, authorize staff
to execute said change order, and take any necessary action.
FUNDING SOURCE:
Funds are currently available in the Lake Enterprise Permanent Capital Maintenance
Fund, account number 210-48850-341-0.
BACKGROUND:
Staff has worked with an architect, SG Design, Inc., to prepare plans for a restroom on
the Bluebonnet Course. When the bids were received, the construction cost of the
facility was in excess of the project budget. Staff then began to explore possible
alternatives to the original design, which would be more cost effective.
Staff has met with the proposed subcontractor, Lane Supply, Inc. of Arlington, Texas to
discuss the fabrication and construction of a self contained restroom facility, which will
be delivered and installed near the green of Hole No. 4 on the Bluebonnet Course. The
restroom will be connected to utilities that will be provided by the Town of Flower Mound
through an Interlocal Agreement, which was approved by the Flower Mound Council on
December 18, 2000 and the Grapevine City Council on December 19, 2000.
The proposed restroom will have a masonry exterior and a metal roof. The colors will
correspond to the other facilities on the course.
July 9, 2002 (8:37AM)
On October 16, 2001, the City Council authorized a contract with Wadsworth Golf
Construction, Inc. in the amount of $1,990,786 for the third and final phase of the
Golf Course Improvement Project. Subsequently, Council approved Change
Order No. 1 to Wadsworth's contract on February 5, 2002 in the amount of
$46,490.00.
This final phase contract provides the opportunity to incorporate the construction
of the self-contained restroom into the existing contract as a change order. The
third phase contractor has agreed to add this project to the existing contract by
utilizing Lane Supply, Inc. as a subcontractor for the installation of the restroom.
This approach expedites the construction of the facility at a price that Staff feels
is representative of the proposed facility.
Staff recommends approval.
Jul 08 02 04:02p Jamie Mc Nair 972-624-8764 p.2
Total
Not valid until signed by the Owner, Architect and Contractor -
The original (Contract Sum) ( ) was ...................................................
Net change by previously authorized Change Orders .................
The (Contract Sum) ( ) prior to this Change Order was ...............................
The (Contract Sum) ( ) will be (increased) (decreased)
(unchanged) by this Change Order in the amount of.._.........................................................................
The new (Contract Sum) ( } including this Change Order will e
The Contract Time will be (increased) (decreased) (unchanged) by
C 1 Completion as of the date of this Change. Order there is
$ 45 41.00
$ 1,990,786.UU
$ 46,490.00
$ 2,037,276.00
$ 45,914.00
$ 2,083,190.00
( )days.
The date of Substan is
in the Contract Sum, Contract Time, or Guaranteed Maximum Price which have been authorized by
NOTE: This summary does not reflect changes
Construction Change Directive. Ci of Gra evine, Texas
Wadsworth Golt Construction Com an OWNERGolf Resources Grou CONTRACTOR 200 South Main Street P.O. Box 95104
ARCHITECT 1901 Van 0 ke Road Address
1850 Crown Drive Suite #1112 Address Gra evine, Texas 76099
Address Plainfield Illinois 60544
Dallas, Texas 75234 BY
BY
BY DATE
2002
DATE Jul 8
DATE
HE r` G701•1
DOCUMENT AMERICAN INSTITUTE OF ARCHITECTS, ORDER73NEW YORK AVE-, NOw-• WASHINGTON. D.C. 20006
CHANGE
HA
OWNER
Q
ARCHITECT
ORDER
CONTRACTOR ❑
FIELD D
AIA DOCUMENT G701
OTHER ❑
GRAPEVINE MUNICIPAL GOLF COURSE
CHANGE ORDER NUMBER: Three
PROJECT:
(name, address) GRAPEVINE, TEXAS
DATE: July 8, 2042
TO CONTRACTOR: WADSWORTH GOLF CONSTR. CO.
ARCHITECTS PROJECT NO:
address) 1901 VAN DYKE ROAD
(name, PLAINFIELD, IL 64544
CONTRACT DATE: goober 30, 2001
CONTRACT FOR: gaff course improvements
The Contract is changed as follows:
$ 45,914.00
1) Furnish and Instal! (1) real building Including overhang buAding
Supply Inc. Proposal. The proposal
description is as follows on the Lane
include: slec> kal, permits, city water tap, facW heater, waif or
does not
celiGtg insulation, concrete footings, wrterlor signs, city sewer tap and
Inspections of the building.
Total
Not valid until signed by the Owner, Architect and Contractor -
The original (Contract Sum) ( ) was ...................................................
Net change by previously authorized Change Orders .................
The (Contract Sum) ( ) prior to this Change Order was ...............................
The (Contract Sum) ( ) will be (increased) (decreased)
(unchanged) by this Change Order in the amount of.._.........................................................................
The new (Contract Sum) ( } including this Change Order will e
The Contract Time will be (increased) (decreased) (unchanged) by
C 1 Completion as of the date of this Change. Order there is
$ 45 41.00
$ 1,990,786.UU
$ 46,490.00
$ 2,037,276.00
$ 45,914.00
$ 2,083,190.00
( )days.
The date of Substan is
in the Contract Sum, Contract Time, or Guaranteed Maximum Price which have been authorized by
NOTE: This summary does not reflect changes
Construction Change Directive. Ci of Gra evine, Texas
Wadsworth Golt Construction Com an OWNERGolf Resources Grou CONTRACTOR 200 South Main Street P.O. Box 95104
ARCHITECT 1901 Van 0 ke Road Address
1850 Crown Drive Suite #1112 Address Gra evine, Texas 76099
Address Plainfield Illinois 60544
Dallas, Texas 75234 BY
BY
BY DATE
2002
DATE Jul 8
DATE
HE r` G701•1
DOCUMENT AMERICAN INSTITUTE OF ARCHITECTS, ORDER73NEW YORK AVE-, NOw-• WASHINGTON. D.C. 20006
Jul 08 02 04:03P
Jamie Mc Nair
07-08-'02 15:27 FROM -LANE SUPPLY
nomm
LA E SUPPLY, INC.
972-624-8764 P.3
8172751660 T-924 FOZ/ez U -1'5e
PROPOSAUSALES ORDER
2W0318
WADSWORThi uOL!= CONSTRUCTION
1901 VAN DYKE. RD
INFIELD, IL 6054A
JAMIG MINA
17 723M
(a15) 341.--7'714
.. (97r') 65?4- 0764_
GRAPEV I EVIG GOLF COURSE
GRAPEVINE , 1'x
Lane Supply, Inc.
120 Fairview
Arlington, Texas 76010
PH: 817-261-9116
FAX 817-275-1660
WE PlJOPOSE TO 39� 2A G � 00
RESTROOM BUILDING KIOSK
**FURNISH $r INSTALL. (1) LT' X 16' Rf_'i,TROOM 'BUILDING INCLUDING OVERHANG
BUILDING DESCRIPTION IS AS FOLLOWS...
dt0tall WIDE X I(;' - b" LONG X 81.0" EiIGH STRUC'T'URE:
--INCLUDE:'S; STEEL TUBE COLUMNS, BASEPILATE S, SL316 ROOF DECK, BEAMS,
CONCRE':TE_ FLOORINGS, OsrA BURRD EXTERIOR SHEATHING, SHEET ROCK INTERIOR
SHEATHING, HE=RCUHOND EXTERIOR STONE WALEL, PANELS, FRP INTE=RIOR WALL
PANELS, (2) END WALL VENTS, (1) SKYLIGHT FOR LIGHTING, STOWLING SEAM
METAL ROOFING, (1) 3068 EXTERIOR DOOR, (1) TOIL-F'T PARTITION WALL W/
DO(]R, (1) ADA WA TER CLOSET "STAINLESS STEEL" WITH FLUESti VALVE, (1)
STAINLESS STEEL SINK (1) S. S. SOAP DISPENSER, (i) S. S. T0I LETT PAPER
DISPENSLR, (1) S. S_ MIRROR, (1) ADA S. 5. CRAB BAR, AND INSTALLATION
ON SITE OF PRE -F'ABRICAT'ED BUILDING.
*CONNECTION OF WATER IS NOT INCLUDED
*FACILITY HAS NO ULECTRICAL, INCLUDED
***EXCLU{)ES; PERMITS, FACILITY HEATER, EL_EwCTRICAL, WALL OR CET.LING
INSULATION, EXTERIOR SIGNS, AND ANY ITEMS NOT LISTED ABOVE.
INCLUDES: MATERIAL, LABOR, DRAWINGS, FREIGHT, TAX.
EXCLUDES; FOOTINGS, SIGNS, ELECTRICAL, PERMITS,
INSPECTIONS, LIMON/PREVAILING WnG'E LABOR R ITEi'Ra NOT l.I'.STED
"REQUESTED
DELIVERY DATE
t ANE SUPPLY. INC CLANE-) proposes to tumish malerufe and/or labor in accordance with all 39.
2
42. 00
of the spOCAicaliona listod a0ove and at accordance with at of the terms and conditions 6cled ($ - )
on the reverse side. for the sum at:
LANE' ntahve: E, A{SIC SEAL Y � rrdc; - Terms 25tDV_4_ WM GN M01.ETION W/Will CREDIT
Repria
This LANE AUthon2ation is based upon the work guefentes explained on the Ms arse side
Authofled JOHNNY MEEK
LANE
Signature
ACCEPTANCE OF PROPOS
along with all of the term$ ants conddione or
are acC9pted. ey signing ibis proposal, I I +
to all of the terms and conditions listed
rousse side of Itis form LANE is auMrited
as outlined above.
The ve pacer, speciflcations and cOndiilonC
:44,
4 azarof IN$ Tam ars saeatili ark!n at t love the authority to bind the Customer
oposat and that t have read and signed the
o do thia work as specified Paynront will be made
copy must be returned to LANE, before conatru6W COM Msnces.
form (ser paragraph 0.02)
Note: This proposal may be wandrawn 301
by LANE 11 not accepted whhin days.
Data of Accaplen0
Authorized
Customer Signalu147
Authorized
Customer Signaturr:
R VERSE SLOE ORIGINAL REQUIRES gk;NJM ltace