HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
ROGER NELSON, CITY MANAGER
JUNE 19, 2001
WORKSHOP - PROPOSED PERMIT FEES INCREASE
Staff recommends Council consider amendments to Chapter 7 of the Grapevine Code of
Ordinances relating to permit fees, take any necessary action, and authorize a public
hearing for adoption of same.
BACKGROUND:
The Building Department has not had an increase in Building Permit Fees since 1987. A
list of hypothetical projects with comparative fee data, as well as a cross section of real
projects that were recently built, are attached as examples. The City of Grapevine
building permit fees are lower than those assessed by neighboring cities.
Staff proposes adoption of the fee schedule from the 1994 Uniform Building Code. In
most cases the plan review and building permit fee would be approximately double the
amount of our current fees.
In order to avoid an applicant's attempt to use lower than actual project valuations, the
Staff also proposes use of 'Building Standards' tables. The publisher of the building
code, International Conference of Building Officials, publishes a periodical called
"Building Standards". This periodical has tables based on regional empirical
construction costs. In order to assess uniform fees, it is proposed to assign the
published project valuation from "Building Standards" if it is higher than the claimed
valuation.
The proposal also includes an increase in Certificate of Occupancy fees from $25.00 to
$50.00. Since Certificates of Occupancy involve a great deal of Staff time, the new fee
is justified. Fence permits would be raised from $10.00 to $21.00.
Staff is often asked to release `partial permits' or 'foundation only' permits for projects.
These are usually released prior to full permit approval (often before full plan submittal),
in order to facilitate the customers' project needs. However, the partial permits add time
and paperwork to the normal process. A 10% fee for early releases or partial permits is
proposed to recover the added cost.
June 14, 2001 (8:57AM)
Lastly, our current mechanical and plumbing fee schedules are very difficult and time
consuming to use for Staff, and more importantly, our customers. We are proposing a
fee schedule based on project square footage for new projects and additions. We have
historically calculated only the electrical permit fee using this approach.
Alterations and small `simple trade permits' will use a revised fee schedule based on the
contract amount for the work to be done. The new fees will also make the cost the same
for plumbing, mechanical, and electrical contractors. It is anticipated that overall fees for
mechanical, electrical, and plumbing permits will increase approximately 14% with the
new fees.
Staff recommends approval.
SW/ga
Proposed Fees
June 13, 2001 (4:20PM)
I
0)
CD
0
. U,
C)
000
R
R
o
6
o
o 1-7
0
C)
C;
C;
0
C)
CD
c:!
w
c,
T-
0,
o osl
C;
C;
Lf)
6-,
V).
a)
C)C14
c)
61).
cn
i.
cn
2)
cli
oa
2) z co
CO
cs
vi
=
O
O
X_- C.) c-- =0
CD
CD
a
EQ
CD
CD-
C5
25C6
EE
EEO
CD
Z
U)
T-
69-
0
0
E E E a)
6
C'4
+-
*+
4-
B
a
0
*�
4z
W.
o
ca
tm
Cts
4-
0
0
0
0
w
"
F-
a
0
0
"
"
0
0 0 0 a
0
ci
-S
r
C) C, C) tll
0
O C! C) 0 icn
a
O
a
O
0;++
C) C) Lo, 0,
N m
0
Q
j2
ca
4-
4-
L-
isi
.2
O
o
o
0
CD
cn
(D
co
0
C>
0
CD
0
O6
c,
0
C;
a)
0
L-
00000
4Z
4-
0
0o
'0
CD
*..
4
4;
0
:4-
0
U.
C)
r-
CO
4Z
fts
4Z
0
0
c,
T.-
(U
0
Cis
L -L C-4
0
to
—
to
a
o
c
o
0
U) .o
4-r
cri c —
cu cu
0
E E 4) 0
t:l),-
0
a
a
oE
0
E -0
— —e's
o
cz
O
o
=
4-
co
=
U
co
m
0
tz
4w
w
0
CL
u
04L„
cu
4-
L-
L
0
4-
0
4-
2n CL
-�a C,3
0
4IM
-
0
CD
o
CD
Lo
0 0
t-- 0 0
.
a) 0.0.0
CL CL E 0 -0
4 2
4
c n
Lo
.
C:�
.
0
-o
0 C:
Cl
R
vi.
to*
cn
CL 0
CD
LO
CO
CD
C;
C=;
5
a
c)
00
CD
649.
Ch
3
C)
CL
0,0
C�
,z
- .S; �-
-0 a
a ca
O
0
Cl
a)
CD
CD
C;
CD
6
1
C�
a
0 0L
0 CD
C (/)
C)
4 Z)
,
Cl
0
C)
C:
= 0 C:
a
c)
c:l
C>
0
T:,
T--
6M
c;
C�
Ls
C�
CS
C)
U)
04
C14
tfi
LO
69-
,
09-
0 3: 70
E U) va
CL)
:5 E
tsi
tFt
c..
!2
is
r-
0
C: =3 o
.0
=
V)
4-
4-
4-
0.04-
.c c/) cn cl) -
.o6
-5 r-ZT
O
4-
0
V)
cc
r
i3
a>3
z
0
0
O
O CL
its
0
4-4-.
0
4-
O
if;
4-
O
O
cn Q C1
'O C C :; cu
O
R
c,
9
a
Lq
C;
O
vi
O
V;
c15:3
CD
CD
C14
I-
co
m
00 0
6%
69
40).
tFt
tn'
1,.%
CW CD
VCZ
0
4)
"
(D
'-
4C
46 u) .2 0
.a)-
0 LO 0
C'4: E cu
"
0
-
40-
U) 0 — a)
a) cu ch
04
Oo
CD -
"a a) ca. > CD
4) CD
O
C)
C�
R
C�
C;
6
a
6,.4.0)
U)
4w U) t- 4 -
=; - . S C:
0
C>
C)
c,
a
0
6
0 6-o co E
to :p
o
to
LO
O
ham --
cl) 0-
09-
O
C4
vi
ts)
C4)-
cz
.2 0- C: 0)
LO
cy
o
o
CD
U) U)
V).
0
C!
6
CL
0
,,-
CR
6
o
c.
U)
C)
C)
cl
cl
Q
0000
(6
C5
a
:.
c�
X6
a
6
C;
C:)
0
C;
6
a
LO
04
"
U)
V-
C:)
6r#-
tr)-
V)-
69-
69
69-
cu
- F -6
C)
0
T
CD
a
C;
0,
CD
C;
a
R
C;
25
Q
oa
CD
cs
CD
CD
a
CD
CD-
C5
25C6
in
CD
In
U)
T-
69-
0)
6
C'4
to
to
ME
O
as
tm
c
a
a
a
ci
-S
6%
a
O
a
V
0
.c
O
m
0
0
0
0
-
4Z
4-
0
(b
'0
0
*..
4
4;
0
2
U.
r-
CO
4Z
4Z
0
4Z
0
0
(U
0
0
0
CL
4-r
E E 4) 0
t:l),-
0
a
a
oE
0
E -0
— —e's
Q
O
o
=
4-
.0 m
U
U
u
04L„
m
4-•
4-
L-
L
0 0 0 0.
C r
0
4IM
-
L.
4-
%-
"
0
0
-
CD
C,
Q
a) 0.0.0
CL CL E 0 -0
u
%-
O
0
-o
0
C;
C> C� CD 0 0 Z cx_
6.
4-
CD
CD
Q
6
CD
CD
C;
C=;
5
a
c)
0 CN cq N 04 >
Ln V -,zr ,i v, cm "2 2
636", ll� cu a
'-0c
0
3
C)
C;
CD
c,
C�
,z
- .S; �-
-0 a
a ca
Cl
CD
60-
W
60
C)
CD
a
":
60-
vl>
a)
ui69-
T:,
T--
6M
a
r- ca
LL
Rf
as
a2
.
:5 E
is
r-
0
C
0
.0
=
UO) C,
O
UJ Eu in L.R
U.
r
i3
a>3
z
0
a
its
its
s
U
U
m'a)w'
u
m
V)
U
uu
its
cu
m
a)
L
4- 0
o
E
VCZ
0
4)
"
(D
'-
4C
LO
I--:
0 LO 0
C'4: E cu
"
0
-
40-
0
4-
04
uj .2
CL '0 :.s; cr
-=s
O
C)
Lo
N
C)
-4
tp,
6,.4.0)
U)
0.c.
-0
Lo
a;
6
tn'
o
O
ham --
09-
W.
ma) -Q
15 U') 0 c
c:,
.0
0 E 0 cu
to>
W
CL
0-
C:)
CD
0
U)
CL
C�
CD
CD
c)
UT CL,-� U) >
CL
CD
0
C;
0
C;
6
a
C�
0) (n t-- >
:,6 :.- G -, -, '6
.0 >
C:)
C:)
C�
C:)
-
CD
C)
Cl
cu
- F -6
O
0
Q
C�
Cl
Lo
0-:3 "a a) -
C: �5 (n �a -F, D- Q
o C: a) CD C= 4)
C)
Q-
cq
U)
,
to
691
*1
t3 cu:) �; - -0 0 J -
-0
LO
C%4
t").
6%
+.'
6%
+-
(U 0 r .R a)
U) 2 ;.j m 0 mm cm
c
a o
(D
rn a m -6) E
'0(n co
C,
cu a)
O
4'>
0
4-
0
4-
: w 0 0 m
0
0
000
1*-
4-
4-
C;
W C:,
Ul)
a) E = - o o
C::t0 U a) - -
, 5 -0 0)
'ui t
40
CD
LO
CC)
t--
Lo
f-
Lo
C-4
cl C�
C14
.
C'4
-
0. M 0 0 CD
D'a CX
c '0
C!
C!
Ci
C14
ci
�t
j
t-
t.,:
oo
00 C)
co m
T-
CD
.0 w T
- :72 a) 0) -Z (D E
m -0 (D c'-� D-,
04
to
m
In
co
CZ Z
E a) a, co a) E
'on0
tF-
6�)'
6%
tO)l
V)-
CF)l
tf)- 4b�
IF,-
>1
0 C: (D (n 0--'0 W
C: (n c 0,- E
0 0 --,0
C)
C)
CL Omu LD 0 -6 U) 0
> (V C: cu
Z
C>
C:)
Co
8 a) E 0
(L)
0
C)
Q
6
C,
0,5 - W
- 0 0 (1) E
0
C;000
C;
C5
C�
C -.2
0 0.0 U) 0- C) c 3::
0000
C�
C)
-0
-
6
C�
a
(D
mac:3
>
m .0 CL) .0 >
2.c
D
C)
a
Cl
ui
LO
T-
U-)
V).
�b%
-
r
0
fx 00 r
aJ 0 w .
C)
.
C)
�
CN
I
61:�
tr-
0
0
U- CL :3 a- 0
< LL m
>
C)
cl
"
69.
,;,%
0
0
0
40
CD
_j
0
C,
0a
C)
oT
a
-
0
':
T: C=;
0
*..
C)
R
V-:
T -:CD
v Cl-
Cl
Cl
+1
0
T-
CD
C:)
C�
C
�
O
Q
C:,
Cl
Cl
CD
IR.
U
6
CD
a
W
04
C14
Ul)
T-
W)
tf)-
6%
V)-
61),
6%
to).
6t,
SAMPLE PROJECTS
1515 WEST STATE HWY. 114 - BEST BUY — 45,004 SQ.FT. —
$2,100,000 VALUATION
rli-ry I BUILDING PERMIT FEE
Grapevine — proposed
0, 1,5 I.vv
Southlake 16,074.50
5,933.20
Colle ville 15,879.19
4,855.95
Keller 15,879,19
4,694.00
Grapevine — proposed 13,261.00
3,844.35
Euless 12,702.20
3,743.50
Grapevine - current 8)964.45
1,331.45
Fort Worth 7,087.00
Bedford 5,739.00
Flower Mound 4,700.40
Co ell 3,400.00
635 WESTPORT PKWY. — SHELL OFFICEMAREHOUSE — 49,258 SQ.FT —
$1,102,394 VALUATION
CITY BUILDING PERMIT FEE
Southlake 10,591.00
Colleyville 9,867.50
Keller 9,867.50
Grapevine — proposed
0, 1,5 I.vv
Euless
5,933.20
Grapevine - current
4,855.95
Fort Worth
4,694.00
Flower Mound
3,844.35
Bedford
3,743.50
Cor)r)ell
1,331.45
3000 GRAPEVINE MILLS — POLAR ICE — 78,363 SQ.FT. —
$750,000 VALUATION
CITY I BUILDING PERMIT FEE
Flower Mound 8,036,30
Southlake 7,899.50
Colleyville 7,293.83
Keller 7,293.83
Grapevine — proposed 6,517.00
Co ell 5,735.00
Euless 4,597.32
Fort Worth 3,547.00
Grapevine - current 3,395.70
Bedford 2 789.50
1155 W. WALL STREET — MIKE WARE OFFICE BUILDING — 3,930 SQ.FT. —
$250,000 VALUATION
MIT
BUILDING PERMIT FEES
Southlake
3,274.50
Colle ville
3,025.68
Keller
3,025.68
Euless
2,567.25
Grapevine — proposed
2,701.00
Fort Worth
1,597.00
Grapevine - current
1,414.45
Bedford
1,164.50
Co ell
525.00
Flower Mound
444.75
1235 WILLIAM D. TATE AVE. — SILVER FOX / GOOD EATS — 7,085 SQ.FT. —
$171,000 VALUATION
CITY
BUILDING PERMIT FEE
Southlake
2,484.50
Colle ville
2,295.73
Keller
2,295.73
lrapevine — proposed
2,050.00
less
1,947.89
Fort Worth
1,140.00
Grapevine - current
1,007.33
Flower Mound
908.50
Bedford
888.00
Co ell
400.00
1217 WEST STATE HIGHWAY 114 — FAMOUS FOOTWEAR REMODEL — 12,410 SQ.FT. -
$90,000 VALUATION
CITY
BUILDING PERMIT FEES
Southlake
1,649.50
Colle ville
1,524.19
Keller
1,524.19
Flower Mound
1,441.00
Grapevine — proposed
1,361.00
Euless
1,293.25
Fort Worth
788.00
Grapevine - current
763.95
Bedford
594.50
Co ell
300.00
HYPOTHETICAL PERMITS/FEES
NEW RETAIL: 50,000 SQ. FT., $1,702,000 VALUATION
CITY
BUILDING PERMIT FEE
Southlake
13,885.00
Colleyville
13,482.00
Keller
13,482.00
Grapevine — proposed
11,456.00
Euless
10,947.02
Grapevine - current
7,322.70
Fort Worth
6,131.00
Flower Mound
5,200.00
Bedford
4,943.00
Ca ell
3,750.00
NEW OFFICE BUILDING: 5000 SQ.FT, $236,000 VALUATION
CITY
BUILDING PERMIT FEE
Southlake
3,134.50
Colleyville
2,896.33
Keller
2,896.33.
Grapevine — proposed
2,586.00
Euless
2,457.49
Fort Worth
1,538.00
Grapevine - current
1,275.45
Bedford
1,115.50
Flower Mound
700.00
Co ell
600.00
SINGLE FAMILY RESIDENTIAL: 3000 SQ.FT., $200,000 VALUATION
CITY
BUILDING PERMIT FEE
Keller
2,563.69
Euless
2,175.25
Southlake
2,060.00
Grapevine — proposed
1,387.00
Colleyville
1,253.75
Fort Worth
1,187.00
Flower Mound
1,150.00
Co ell
1,125.00
Bedford
730.00
Grapevine - current
683.00
I
INTERIOR ALTERATION IN A RETAIL CENTER: 5000 SQ.FT., $75,000 VALUAT16N—
ITY
BUILDING PERMIT FEE
Southlake
1,462.00
Colleyville
1,350.93
Keller
1,350.93
Grapevine — proposed
1,206.00
Euless
1,146.25
Fort Worth
707.00
Flower Mound
700.00
Grapevine - current
590.70
Bedford
527.00
Co ell
250.00
u:\sw\nypopermits
m
Ojsv\hyposonnp|epnojeota
CERTIFICATE OF OCCUPANCY
CITY
Southlake
50.00
Co pell
50.00
Flower Mound
50.00
Grapevine — proposed
50.00
Fort Worth
48.00
colleyville
47.00
Euless
47.00
Keller
45.00
Bedford
40.00
Ojsv\hyposonnp|epnojeota
.Mechanical, Electrical, and Plumbing
0 Permit Fees
TYPE OF OCCUPANCY
F_
BUILDING AREA (SQFT)
PERMIT FEES
AMOUNT DUE
EACH TRADE
1. R-3
1- 749
$ 33.25
SINGLE FAMILY, DUPLEX,
750- 1,199
$ 49.88
TOWNHOUSE,
1,200- 1,500
$ 63.18
NEW CONSTRUCTION & ADDITIONS
1,501- 1,750
$ 76.48
(PER UNIT)
1,751- 2,000
$ 83.13
2,001 - 2,250
$ 89.78
TOTAL SQ. FOOT UNDER ROOF
2,251- 3,000
$ 96.43
3,001 - 3,500
$ 103.08
3,501 - 4,000
$ 109.73
$
4,001+
$ 120.37
EACH TRADE
11. A, E, 1, R-1
1 - 500
$ 37.00
HOTELS, APARTMENTS,
501 -100,000
$ 17.50+.035 PER
DRINKING/DINING, EDUCATIONAL,
100,001 - 500,000
$ 3,500.00 +.03 SQUARE
ASSEMBLY, INSTITUTIONAL
500,001+
$ 15,000.00+.02 FOOT
EACH TRADE
III. B, F, H, M, S, U
1- 500
$ 37.00
OFFICE, RETAIL, WHOLESALE,
501- 50,000
$ 32.00+.01 PER
GARAGES, FACTORIES,
50,001- 100,000
$ 182.00 +.007 QUARE
WORKSHOPS, SERVICE STATIONS,
100,001 +
$ 582.00 +.003 FOOT
WAREHOUSE
$
CONTRACT
EACH TRADE
IV. ANY OCCUPANCY GROUP,
VALUATION OF WORK
0- 500
ALTERATIONS,
$ 37.00
SHELL COMPLETIONS
501- 1,500
$ 45.00
1,501 - 3,000
$ 57.00
3,001 - 5,000
$ 72.00
CONTRACT VALUATION OF WORK:
5,001- 50,000
$ 27.00+ .009 PER
50,001 - 100,000
$ 127.00 +.007 $1,000.00
$
100,001- 500,000
$ 327.00 +.005 VALUATION
$
500,000+
$ 1,327.00 +.003
EACH TRADE
V. IRRIGATION SYSTEMS
$ 37.00
MOBILE HOME SERVICE
$ 37.00
TEMPORARY POLE SERVICE
$ 37.00
SWIMMING POOLS
$ 37.00
$
OTHER INSPECTIONS AND FEES
• INSPECTIONS OUTSIDE NORMAL BUSINESS HOURS (2HR MINIMUM).................................................................. $42.00/HOUR*
• REINSPECTION FEES...................................................................................................................................... $42.00/HOUR
• PERMITS FOR WHICH NO FEE IS SPECIFICALLY INDICATED.................................................................................$37.00
• INSPECTIONS FOR WHICH NO FEE IS SPECIFICALLY INDICATED(1/2 HOUR MINIMUM) ........................................... $42.00/HOUR
• ADDITIONAL PLAN REVIEW REQUIRED BY CHANGES, ADDITIONS, OR REVISIONS TO APPROVED PLANS .............. $42.00/HOUR
• BUILDING PERMIT FEES FOR THE GRAPEVINE-COLLEYVILLE INDEPENDENT SCHOOL DISTRICT SHALL BE 25%
OF THE FEES ESTABLISHED IN THIS TABLE
• FOR USE OF OUTSIDE CONSULTANTS FOR PLAN CHECKING AND INSPECTIONS, OR BOTH..............................ACTUAL COSTS*
*OR THE TOTAL HOURLY COST TO THE JURISDICTION WHICHEVER IS GREATER.
**ACTUAL COSTS INCLUDE ADMINISTRATIVE AND OVERHEAD COSTS.
f fo_j 1