HomeMy WebLinkAboutItem 10 - State Highway 26 Overlay and RestripingITEM /a MEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: ROGER NELSON, CITY MANAGER MEETING DATE: JUNE 19, 2001 SUBJECT: SH 26 OVERLAY & RESTRIPING CHANGE ORDER NO. 1/ ADVANCED FUNDING AGREEMENT - TXDOT RECOMMENDATION: City Council consider ratifying staff's execution of Change Order No. 1 to the Advanced Funding Agreement with TxDOT in the amount of $70,606.25 for local participation in the surfacing and restriping of SH 26 between Mustang Drive and Kimball Road and take any necessary action. FUNDING SOURCE: Funds for this Change Order have been provided by the Grapevine-Colleyville Independent School District in the amount of $ 100,000.00. BACKGROUND: TxDOT is proposing to modify SH 26 between Mustang Drive and Kimball Road / Heritage Avenue from the existing four -lane configuration to a four -lane with a center turn -lane configuration. The project will involve overlaying the entire width of the roadway, including the shoulders, and adding new pavement markings. The cost of this work, based upon existing TxDOT contract prices, is $141,212.50. TxDOT is willing to fund half of that cost and has asked the local entities to fund the other half. The GCISD has provided $100,000.00 to the City of Grapevine for participation in these improvements. The City will not be required to provide any funding. TxDOT has requested the City expedite the approval of the change order so that the work can begin immediately. Staff executed the Change Order and forwarded the documentation to TxDOT for their processing. Staff recommends approval. JSL/dsm 0:\agenda\061901 \SH26_MustangDr_Change0rder.agm June 14, 2001 (10:52AM) Is =501110- h.. "'�, Form CO S -98R CHANGE ORDER NUMBER: 1 RWZ 05/24/01 1. CONTRACTOR: Duininck Bros, Inc. 2. Change Order Work Limits: Sta. Kimball to Sta. Mustang 3. Type of Change(on federal -aid non-exempt projects): Major (Major/Minor) 4. Reasons: 3F (3 Max. - In order of importance - Primary first) 5. Describe the work being revised: This change order is necessary in order to revise the project limits on the original construction project. The revision was agreed upon by our office in an effort to provide a safer condition to the traveling public by restriping this section of roadway to provide a continuous left turn lane. This was a decision based on a request from the City of Grapevine due to a high school that is located in this area and the numerous left turn movements that occur daily in this area. The overlay will provide a stronger pavement section. This is a third party funding effort in which the City of Grapevine has agreed to pay for half the cost associated with this work. CCSJ: 0014-15-027 etc. Project: NH 2001 (58) ETC. Highway: US 287 County: TARRANT District: FORT WORTH Contract LCONTRACTOR Number: 02013008 Fed. Aid Exempt: ❑ Fed. Aid Non Exempt: ❑ 6. New or revised plan sheet(s) & sketch(es) are attached and numbered: 5 REV 1 7A REV 0 9A REV 0 Each signatory hereby warrants that each has the authority to execute this Change Order (CO). RECOMMENDED FOR EXECUTION: District Const/Maint/Operations Engineer Date Area Engineer Date ❑ APPROVED C] REQUEST APPROVAL Director, Design Division Date District Engineer Date C] APPROVED ❑ REQUEST APPROVAL Director, Traffic Operations Division ; a Date Area Engineer's Seal: P„1?.:'.K C V,.L Ju y �4 Director, Construction or Maintenance Division Date ❑ APPROVED ❑ REQUEST APPROVAL AED, Engineering Operations Date APPROVED The following information must be provided The contractor must sign the Change Order and, by doing so, agrees to waive any and all claims for additional compensation due to any and all other expenses. additional changes for time, overhead and profit: or loss Time Ext. #: 1 Days added on this CO: 20 of compensation as a result of this change. Amount added by this change order: $141,212.50 Date For TxDOT use only: LCONTRACTOR Days FHWA non -participating: NameCO portion FHWA non -participating: $70,606.25 d Title CO portion financed by 3rd party funding: $70,606.25 RECOMMENDED FOR EXECUTION: District Const/Maint/Operations Engineer Date Area Engineer Date ❑ APPROVED C] REQUEST APPROVAL Director, Design Division Date District Engineer Date C] APPROVED ❑ REQUEST APPROVAL Director, Traffic Operations Division ; a Date Area Engineer's Seal: P„1?.:'.K C V,.L Ju y �4 Director, Construction or Maintenance Division Date ❑ APPROVED ❑ REQUEST APPROVAL AED, Engineering Operations Date APPROVED N x - CC. I LU !9 I uj . . . .otn . . . . . LO z Z 0 LO q 1, 1 M 0 " W 000 M let 0 C%i in, 41% VZ 40 V_7 O 04 LUT W > C) Z - 0 D C14 a LU LU Vi C5 0 V-: 0 0) vi Lp m C-4 o r+ C4 Ln o 0 et CD 0 to OCL -tt of to m LO v co N -4 64 N 601, 4C60144 N M, M W " M co 0 409, *4 0 40 0 wri Om w x co rn0 0 E 0 U- 0 0 H . . . .otn . . . . . LO z Z 0 LO q 1, 1 M 0 " W 000 M let 0 C%i in, 41% VZ 40 V_7 04 LUT W > C) Z - 0 C14 rl: Vi C5 0 V-: 0 0) vi Lp m C-4 o r+ C4 Ln o 0 et CD 0 to OCL -tt of to m LO v co N -4 64 N 601, 4C60144 N M, M W " co 409, *4 0 40 0 wri w R R R R R CR R R mai v V ce) V 0 0 at r- rl CO m lc� 17i "-:. Ci "It "� in N to of I- m M 04 C-4 00 00 0 Ln 0 CY! (D h 0 IR r- r r 0 C! (D M 0 LO 04 0 V r-- 00 0 460 ONO *:L 0 0 N 401# 44). 404 m -tr > 40 w 44 co wCNF 0 LU cn ui 44 a. + -J < z CR q IR R q q q -T 0 t- co 0 Q CN h f, T r- V co CO N r, CO LU O Ln CO 00 N C%! Ui U cc coo 0 Ln 0 2 'n w "l, 4-, era to m 44 0 V F - z F- 0 < < u U. U- zo to LU W -i -j -i z CV U- < << 0 z O z cr w :,I P < z iux- WO rn w 2 cr 2 �e �< �4 —0 > w m Wui a < 0. Q a 2 > > > < Z < < x U V—Q, rj N m m g 0 �SCYGJ U- U- w w w 9 9 9 w t w C? Ul I? to C, to to Ln N 0 L I II 191919 1 x co rn0 0 E 0 U- 0 0 H CHANGE ORDER NUMBER: 1 Advance Funding Agreement (Third Party Funding) Information This form is used when the subject change order involves funding by a source other than TxDOT/U.S. DOT. 1. Outside funding provided by: Citv of Grapevine (Outside Entity's Legal Name) 2. Type of outside funding agreement for this change: [ Check one J ❑ Existing ❑ Amended ❑ New 3. Indicate the type and amount of funding: ❑ Fixed Price (Lump Su (Estimated Amount: D Actual Cost (a) Contract Items (Bid Items): (b) E&C*: (a) x [enter (c) Indirect Cost**: (a+b) x [enter 0 CCSJ: 0014-15-027 etc. Project: NH 2001 (58) ETC. Highway: US 287 County: TARRANT District: FORT WORTH Contract Number: 02013008 Use as needed: $70,606.25 1 hereby approve the modifications covered by Form CO for this Change Order and agree $0.00 to finance the additional costs, if any, as reflected by this form. $0.00 Advance_funding Date TOTAL $70,606.25 / /r T /Printed e Jerry L. Hodge Typed/Printed Title Dir, of Public Works * The percentage (%) for E&C (Engineering and Contingencies) charges varies from project to project from approximately 6% to 11 % depending on the contract amount of the project. Projects with higher contract amount will have the lower rate of E&C charge. For a specific project, E&C rate (%) can be derived from the cost of "Engineering and Contingencies" in the "Estimated Cost" of the project. ** Use the statewide district rate as established by Finance Division each year. This line 3(c) is for Service Project only, unless otherwise specified in the Advance Funding Agreement. See Stand Alone Manual Notice 98-2 for instructions. Advance Funding for this Change Order has been arranged: District Engineer Date Typed/Printed Name: TXDOT Form CO-AFA 5-98R