MEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: ROGER NELSON, CITY MANAGER
MEETING DATE: JUNE 19, 2001
SUBJECT: SH 26 OVERLAY & RESTRIPING CHANGE ORDER NO. 1/
ADVANCED FUNDING AGREEMENT - TXDOT
RECOMMENDATION:
City Council consider ratifying staff's execution of Change Order No. 1 to the Advanced
Funding Agreement with TxDOT in the amount of $70,606.25 for local participation in
the surfacing and restriping of SH 26 between Mustang Drive and Kimball Road and
take any necessary action.
FUNDING SOURCE:
Funds for this Change Order have been provided by the Grapevine-Colleyville
Independent School District in the amount of $ 100,000.00.
BACKGROUND:
TxDOT is proposing to modify SH 26 between Mustang Drive and Kimball Road /
Heritage Avenue from the existing four -lane configuration to a four -lane with a center
turn -lane configuration. The project will involve overlaying the entire width of the
roadway, including the shoulders, and adding new pavement markings.
The cost of this work, based upon existing TxDOT contract prices, is $141,212.50.
TxDOT is willing to fund half of that cost and has asked the local entities to fund the
other half. The GCISD has provided $100,000.00 to the City of Grapevine for
participation in these improvements. The City will not be required to provide any
funding.
TxDOT has requested the City expedite the approval of the change order so that the
work can begin immediately. Staff executed the Change Order and forwarded the
documentation to TxDOT for their processing.
Staff recommends approval.
JSL/dsm
0:\agenda\061901 \SH26_MustangDr_Change0rder.agm
June 14, 2001 (10:52AM)
Is
=501110-
h..
"'�,
Form CO S -98R
CHANGE ORDER NUMBER: 1 RWZ 05/24/01
1. CONTRACTOR: Duininck Bros, Inc.
2. Change Order Work Limits: Sta. Kimball to Sta. Mustang
3. Type of Change(on federal -aid non-exempt projects): Major (Major/Minor)
4. Reasons: 3F (3 Max. - In order of importance - Primary first)
5. Describe the work being revised: This change order is necessary
in order to revise the project limits on the original construction project.
The revision was agreed upon by our office in an effort to provide a safer
condition to the traveling public by restriping this section of roadway to
provide a continuous left turn lane. This was a decision based on a request
from the City of Grapevine due to a high school that is located in this area
and the numerous left turn movements that occur daily in this area. The
overlay will provide a stronger pavement section. This is a third party
funding effort in which the City of Grapevine has agreed to pay for half the cost
associated with this work.
CCSJ:
0014-15-027 etc.
Project:
NH 2001 (58) ETC.
Highway:
US 287
County:
TARRANT
District:
FORT WORTH
Contract
LCONTRACTOR
Number:
02013008
Fed. Aid Exempt: ❑
Fed. Aid Non Exempt: ❑
6. New or revised plan sheet(s) & sketch(es) are attached and numbered: 5 REV 1 7A REV 0 9A REV 0
Each signatory hereby warrants that each has the authority to execute this Change Order (CO).
RECOMMENDED FOR EXECUTION:
District Const/Maint/Operations Engineer Date Area Engineer Date
❑ APPROVED C] REQUEST APPROVAL
Director, Design Division Date District Engineer Date
C] APPROVED ❑ REQUEST APPROVAL
Director, Traffic Operations Division ; a Date
Area Engineer's Seal:
P„1?.:'.K C V,.L
Ju
y �4
Director, Construction or Maintenance Division Date
❑ APPROVED ❑ REQUEST APPROVAL
AED, Engineering Operations Date
APPROVED
The following information must be provided
The contractor must sign the Change Order and, by doing so, agrees to
waive any and all claims for additional compensation due to any and all
other expenses. additional changes for time, overhead and profit: or loss
Time Ext. #: 1 Days added on this CO: 20
of compensation as a result of this change.
Amount added by this change order: $141,212.50
Date
For TxDOT use only:
LCONTRACTOR
Days FHWA non -participating:
NameCO
portion FHWA non -participating: $70,606.25
d Title
CO portion financed by 3rd party funding: $70,606.25
RECOMMENDED FOR EXECUTION:
District Const/Maint/Operations Engineer Date Area Engineer Date
❑ APPROVED C] REQUEST APPROVAL
Director, Design Division Date District Engineer Date
C] APPROVED ❑ REQUEST APPROVAL
Director, Traffic Operations Division ; a Date
Area Engineer's Seal:
P„1?.:'.K C V,.L
Ju
y �4
Director, Construction or Maintenance Division Date
❑ APPROVED ❑ REQUEST APPROVAL
AED, Engineering Operations Date
APPROVED
N
x -
CC. I
LU
!9
I
uj
.
.
. .otn
.
.
.
.
.
LO
z
Z
0
LO
q
1,
1
M
0
"
W
000
M
let
0
C%i
in,
41%
VZ
40
V_7
O
04
LUT
W
> C)
Z
-
0
D
C14
a
LU
LU
Vi
C5
0
V-:
0
0)
vi
Lp
m
C-4
o
r+
C4
Ln
o
0
et
CD
0
to
OCL
-tt
of
to
m
LO
v
co
N
-4
64
N
601,
4C60144
N
M,
M
W
"
M
co
0
409,
*4
0
40
0
wri
Om
w
x
co
rn0
0
E
0
U-
0
0
H
.
.
. .otn
.
.
.
.
.
LO
z
Z
0
LO
q
1,
1
M
0
"
W
000
M
let
0
C%i
in,
41%
VZ
40
V_7
04
LUT
W
> C)
Z
-
0
C14
rl:
Vi
C5
0
V-:
0
0)
vi
Lp
m
C-4
o
r+
C4
Ln
o
0
et
CD
0
to
OCL
-tt
of
to
m
LO
v
co
N
-4
64
N
601,
4C60144
N
M,
M
W
"
co
409,
*4
0
40
0
wri
w
R
R
R
R
R
CR
R
R
mai
v
V
ce)
V
0
0
at
r-
rl
CO
m
lc�
17i
"-:.
Ci
"It
"�
in
N
to
of
I-
m
M
04
C-4
00
00
0
Ln
0
CY!
(D
h
0
IR
r-
r
r
0
C!
(D
M
0
LO
04
0
V
r--
00
0
460
ONO
*:L
0
0
N
401#
44).
404
m
-tr
>
40
w
44
co
wCNF
0
LU
cn
ui
44
a.
+
-J
<
z
CR
q
IR
R
q
q
q
-T
0
t-
co
0
Q
CN
h
f,
T
r-
V
co
CO
N
r,
CO
LU
O
Ln
CO
00
N
C%!
Ui
U
cc
coo
0
Ln
0
2
'n
w
"l,
4-,
era
to
m
44
0
V
F -
z
F-
0
<
<
u
U.
U-
zo
to
LU
W
-i
-j
-i
z
CV
U-
<
<<
0
z
O
z
cr
w
:,I
P
<
z
iux-
WO
rn
w
2
cr
2
�e
�<
�4
—0
>
w
m
Wui
a
<
0.
Q
a
2
>
>
>
<
Z
<
<
x
U
V—Q,
rj
N
m
m
g
0
�SCYGJ
U-
U-
w
w
w
9
9
9
w
t
w
C?
Ul
I?
to
C,
to
to
Ln
N
0
L
I
II
191919
1
x
co
rn0
0
E
0
U-
0
0
H
CHANGE ORDER NUMBER: 1
Advance Funding Agreement (Third Party Funding) Information
This form is used when the subject change order involves funding by a source other than TxDOT/U.S. DOT.
1. Outside funding provided by:
Citv of Grapevine
(Outside Entity's Legal Name)
2. Type of outside funding agreement for this change: [ Check one J
❑ Existing ❑ Amended ❑ New
3. Indicate the type and amount of funding:
❑ Fixed Price (Lump Su (Estimated Amount:
D Actual Cost
(a) Contract Items (Bid Items):
(b) E&C*: (a) x [enter
(c) Indirect Cost**: (a+b) x [enter
0
CCSJ:
0014-15-027 etc.
Project:
NH 2001 (58) ETC.
Highway:
US 287
County:
TARRANT
District:
FORT WORTH
Contract
Number:
02013008
Use as needed:
$70,606.25 1 hereby approve the modifications covered
by Form CO for this Change Order and agree
$0.00 to finance the additional costs, if any, as
reflected by this form.
$0.00
Advance_funding Date
TOTAL $70,606.25 / /r
T /Printed e Jerry L. Hodge
Typed/Printed Title Dir, of Public Works
* The percentage (%) for E&C (Engineering and Contingencies) charges varies from project to project from approximately 6%
to 11 % depending on the contract amount of the project. Projects with higher contract amount will have the lower rate of
E&C charge. For a specific project, E&C rate (%) can be derived from the cost of "Engineering and Contingencies" in the
"Estimated Cost" of the project.
** Use the statewide district rate as established by Finance Division each year. This line 3(c) is for Service Project only, unless
otherwise specified in the Advance Funding Agreement. See Stand Alone Manual Notice 98-2 for instructions.
Advance Funding for this Change Order has been arranged:
District Engineer Date
Typed/Printed Name: