Loading...
HomeMy WebLinkAboutItem 10 - Permit FeesITEM # UNNONNOW / 0 MEMO TO: HONORABLE MAYOR AND MEMBERS OF E CITY COUNCIL FROM: ROGER NELSON, CITY MANAGER MEETING DATE: JULY 17, 2001 SUBJECT: PROPOSED PERMIT FEES INCREASE RECOMMENDATION: Staff recommends Council consider amendments to Chapter 7 of the Grapevine Code of Ordinances relating to permit fees, and take any necessary action. BACKGROUND: The Building Department has not increased Building Permit Fees since 1987. The City of Grapevine building permit fees are lower than those assessed by many area cities. Staff proposes the adoption of the fee schedule from the 1994 Uniform Building Code. In most cases, the new plan review and building permit fees would approximately double the amount of our current fees. In order to avoid an applicant's attempt to use lower than actual project valuations, Staff also proposes use of 'Building Standards' tables. The International Conference of Building Officials publishes a periodical called "Building Standards" which provides tables based on regional empirical construction costs. In order to assess uniform fees, this proposal should enable the building department to assign the published project valuation from "Building Standards" when it is higher than the claimed valuation. The proposal also includes an increase in Certificate of Occupancy fees from $25.00 to $50.00. Since Certificates of Occupancy involve a great deal of Staff time, the new fee is justified. Fence permits would be raised from $10.00 to $21.00. Staff is often asked to release 'partial permits' or `foundation only' permits for projects. These are usually released prior to full permit approval (often before full plan submittal), in order to facilitate the customers' project needs. However, the partial permits add time and paperwork to the normal process. A 10% fee for early releases or partial permits is proposed to recover the added cost. Lastly, our current mechanical and plumbing fee schedules are very difficult and time consuming to use for Staff, and more importantly, our customers. We are proposing a fee schedule based on project square footage for new projects and additions. We have historically calculated only the electrical permit fee using this approach. July 10, 2001 (4:08PM) Alterations and small 'simple trade permits' will use a revised fee schedule based on the contract amount for the work to be done. The new fees will also make the cost the same for plumbing, mechanical, and electrical contractors. It is anticipated that overall fees for mechanical, electrical, and plumbing permits will increase approximately 14% with the new fees. As proposed, the fee increases will take effect on October 1, 2001. This delay in the effective date will give the City time to notify the contractors impacted by the change in rates. This item was presented to City Council at their June 19, 2001, workshop. Staff recommends approval. SW/ga Proposed Fees July 12, 2001 (9:31 AM) •z�� AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS AMENDING THE GRAPEVINE CODE OF ORDINANCES BY AMENDING CHAPTER 7 BUILDINGS AND CONSTRUCTION, ARTICLE 1, SECTION 7-3; ARTICLE 111 ELECTRICAL CODE, SECTION 7-81; ARTICLE IV FENCES, SECTION 7-123; ARTICLE VI MECHANICAL CODE, SECTION 7-151; ARTICLE Vill PLUMBING CODE, SECTION 7-177, REGARDING PERMIT FEES, PROVIDING AMENDMENTS TO SAME, REPEALING CONFLICTING ORDINANCES; PROVIDING A SEVERABILITY CLAUSE; PROVIDING A PENALTY NOT TO EXCEED TWO THOUSAND DOLLARS ($2,000.00) FOR EACH SEPARATE OFFENSE AND A SEPARATE OFFENSE SHALL BE DEEMED COMMITTED UPON EACH DAY DURING OR ON WHICH A VIOLATION OCCURS; DECLARING AN EMERGENCY AND PROVIDING AN EFFECTIVE DATE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS: Section 1. That Chapter 7 Buildings and Construction, Article I In General, Section 7-3, Amendments, Table 1-A is hereby amended in its entirety and replaced by the attached Exhibit "A". Section 2. That Chapter 7 Buildings and Construction, Article III Electrical Code, Section 7-81, Fee Schedule is hereby amended in its entirety to read as follows: "Sec. 7-81. Fee Schedule. (a) Permit or inspection fees to be charged for any electrical work in the City shall be as shown in the attached Exhibit "B". Section 3. That Chapter 7 Buildings and Construction, Article IV Fences, Section 7-123, Fee, is hereby amended in its entirety to read as follows: "Sec. 7-123. Same — Fee (a) The fee for issuance of fence construction permits shall be $21.00." Section 4. That Chapter 7 Buildings and Construction, Article VI Mechanical Code, Section 7-151, Amendments to Code, shall be amended by the addition of Table I -A attached hereto as Exhibit "B". Section 5. That Chapter 7 Buildings and Construction, Article VIII Plumbing Code, Section 7-177 Amendments to Plumbing Code, Table No. 3-A Plumbing Permit Fees, is hereby amended in its entirety and replaced by the attached Exhibit "B". Section 6. That all ordinances or any parts thereof in conflict with the terms of this ordinance shall be and hereby are deemed repealed and of no force or effect. Section 7. Any person violating any of the provisions of this ordinance shall be deemed guilty of a misdemeanor and upon conviction thereof shall be fined in a sum not to exceed two thousand dollars ($2,000.00) and a separate offense shall be deemed committed upon each day during or on which a violation occurs or continues. Section 8. If any section, subsection, sentence, clause or phase of this ordinance shall for any reason be held to be invalid, such decision shall not affect the validity of the remaining portions of this ordinance. Section 9. The fact that the present ordinances and regulations of the City of Grapevine, Texas are inadequate to properly safeguard the health, safety, morals, peace and general welfare of the inhabitants of the City of Grapevine, Texas, creates an emergency for the immediate preservation of the public business, property, health, safety and general welfare of the public which requires that this ordinance shall become effective from and after the date of its passage, and it is accordingly so ordained. 2001. Section 10. That the effective date of this ordinance shall be October 1, PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS, on this the 17th day of July, 2001. K ATTEST: 0 4 Wl EXHIBIT "All CD C� C� Cl IR R C) C� CI C) 40 0oc g: 0 CDC C> � C) - a 6 0 C: oC� C� (D U) 0 mo aLO 6 10 04 619. W V'* m T- V). tm 61)- 0) 0) s 1 ca C 21 C) CY) C r- c 0 10 2) cc :3 cc CIF 73CD ca 0 m cm Eco 12 IL 0 r - C; C t15 t3 O Z Q --u CL a) 0 0 0 %Z > cm C: CU &--O " cu % Z 0 %, -Z 0 0 w 2 w F- ca cL E, a " CL o 0 0 -W 0 C Cc ca 41 4Z 0 0 a .2 —0 (n U)m 0 44 0 .2 *1 CD >1 CD C) C) C:) c ca 00000 0 11;5 0 ;: u:6 4- 00000 "Fu 0 .2 Z E 0 V ";:; u u cc . C� C.,j (N C,4 Co — C) 0 LO .2 4a !2 4 - 0 QC: 0 0 0 C� a C; 6 40 . . . . . . 4- CC 4- L- 0 4� O C� O Q C) O Q o Cl C� r =) U) ul CD C� Q 40 .0 0 0 r 0 E uj CD V- ,Z V!k 2 c L L 13, Lo 0 U- 0 tij C,4 0 4) L. 0 C 0 0 = U =3 —cr .2 'rZ Co4) r HE ^o�a cz c 0 �o co Ri m u ca m 0 Co c: (DX.-- ca (D a LO 0 a (n 0 (0-67 0 - a o (D 0 0tLi LO 0 0 Cc o = = : *ja &- C'A cn a) 0 >w LO CD 611.11 * 0 a 0) - C.> co a) r - 0 4- CD to a a; C14 (i ui vi V1, ch 0 OII 06 .(n �� E- 0 a) ot C) 0a C: -0 to C14 611j� 61), m CL a) CL =$ 4) C� 6-, m m — CL CL a C� r " 'n .0 0 0 (D Q? NO tO 0 0 — CL Co cl CD C� 0 a o ,-- cn Q Cl C� C; CD C� C) C 0— 0 (D 0 c (D *= co co (D 0. CD co 6 0 6 CS C; 6 co C� C; C� CD 16 cm a 0-0 C: CL 0— CD C� S CD 40 C; C� Lo (n i5 co :2 C: C C; CD 6 c, tO, -Z t), 0 — — -6 " a) W) 60- C14 V) V). V) 61) -W cn 0 >1 1-- 0 = CM= CL C) > Cc C: 0 44 44 0 cu a o CD r C, 5 0 0 — 0 Cc a 44 -W *4 C� o 4- C; o0 4- 0 V) cc (D co 0 4- 0 4- 4- to �2 LO 40- w too C14 CD to " cc 0 C g * 0) C- CU a) 4)'s CU >, to O CD LO N 00 O0 C4 (n cr 0 V) a)CLL M N 0; 1-t r-- t,: 00 0 co-- C: co 0 4) V) 4- cc 0 ic 0 0 04 V). C%4 tFk to V� Mto V} V). co 6'k C4 V), tO LO V-:� (n .00 0- cuU S) 0 V) — 0 0 0 > L) 0 O• a W- 0 Cn (D 'o E —,.- C: o 0 *�5 1-- 0 O• CD Z C� C! C� 0— = 4- — (D Q) — co 0 c co = E 76 , 0 CD C) C) 0 cn 0 (n 0 3: 0 276 c CD C� C) CD oo 0 CL M > 0 0 0 CU 0 > co < O CD Cl Cl C) CD C) 0 C� 0 (n 0 ic U) CD O O Co IR LO C) LO Cl T- LO 61). r C Q C fl -'o L C: 6 c: cu =3 � 0 0 O'D 0 0 0 < a C, V> V3 0 0 m C: < LL U- EL M n- C.) > 6 C) C4 40% 0 4+ 0 4+ *.- CD 4� 40 CD CD . . . C; W) 0 O Cl CD CD 0 O CD (D r Cl r T.: a V-: c, Ct F- O c) C) r O go Cl CD O CD O to C, .: C) C� &6 C; (6 6 C5 1=t Vi U) Vi C14 40 C4 6p. to 61k V- 6413 U) GH V - V} EXHIBIT "All CITY OF GRAPEVINE EXHIBIT "B" MECHANICAL, ELECTRICAL AND PLUMBING PERMIT FEES TYPE OF OCCUPANCY BUILDING AREA PERMIT FEES AMOUNT DUE (SQ FT) EACH TRADE I. R-3 1 - 749 $ 33.25 SINGLE FAMILY, DUPLEX 750- 1,199 $ 49.88 TOWNHOUSE, 1,200- 1,500 $ 63.18 NEW CONSTRUCTION & 1,501- 1,750 $ 76.48 ADDITIONS (PER UNIT) 1,751- 2,000 $ 83.13 2,001- 2,250 $ 89.78 TOTAL SQ.FOOT UNDER 2,251- 3,000 $ 96.43 ROOF 3,001- 3,500 $ 103,08 3,501- 4,000 $ 109.73 $ 4,001+ $ 120.37 EACH TRADE 11, A, E, 1, R-1 I - 500 $ 37.00 HOTELS, APARTMENTS, 501 - 100,000 $ 17.50+.035 PER 1 DRINKING/DINING, 100,001 - 500,000 $ 3,500.00+.03 SQUARE EDUCATIONAL, ASSEMBLY, 500,001+ $15,000,00+.02 FOOT INSTITUTIONAL EACH TRADE Ill. B, F, H, M, S, 1 - 500 $ 37.00 'OFFICE, RETAIL, WHOLESALE, 501- 50,000 $ 32,00+.01 PER f GARAGES, FACTORIES, 50,001- 100,000 $ 182.00+ .007 SQUARE WORKSHOPS, SERVICE 100,001+ $ 582.00+ .003 FOOT STATIONS, WAREHOUSE CONTRACT EACH TRADE VALUATION OF WORK IV. ANY OCCUPANCY GROUP, 0- 500 $ 37.00 ALTERATIONS, FINISH -OUTS, 501- 1,500 $ 45.00 SHELL COMPLETIONS 1,501- 3,000 $ 57.00 3,001- 5,000 $ 72.00 CONTRACT VALUATION OF WORK: 5,001- 50,000 50,001- 100,000 $ 27.00+ .009 $ 127.00+.007 PER 100,001- 500,000 $ 327,00+ .005$1,000.00 TVALUATION 500,000+ $ 1,327,00+.003 $ EACH TRADE V. IRRIGATION SYSTEMS $ 37.00 MOBILE HOME SERVICE $ 37.00 TEMPORARY POLE SERVICE $ 37.00 $ SWIMMING POOLS $ 37.00 OTHER INSPECTIONS AND FEES • INSPECTIONS OUTSIDE NORMAL BUSINESS HOURS (2HR MINIMUM) .... .... _ ........... ................ ....... $42.00/HOUR- • REINSPECTION FEES ..... ............................ ................ ....... ................ ........ .............. ..... $42.00 • PERMITS FOR WHICH NO FEE IS SPECIFICALLY INDICATED ......... _ ....... ...................... ....... ......... $37.00 • INSPECTIONS FOR WHICH NO FEE IS SPECIFICALLY INDICATED (1/2 HOUR MINIMUM) ......................$42.00/HOUR • ADDITIONAL PLAN REVIEW REQUIRED BY CHANGES, ADDITIONS, OR REVISIONS TO APPROVEDPLANS ..... ... ..................................... ...... ___ ............................... __ ............ __$42,00/HOUR • BUILDING PERMIT FEES FOR THE GRAPEVINE-COLLEYVILLE INDEPENDENT SCHOOL DISTRICT SHALL BE 25% OF THE FEES ESTABLISHED IN THIS TABLE • FOR USE OF OUTSIDE CONSULTANTS FOR PLAN CHECKING AND INSPECTIONS, OR BOTH......... ACTUAL COSTS** *OR THE TOTAL HOURLY COST TO THE JURISDICTION WHICHEVER IS GREATER. **ACTUAL COSTS INCLUDE ADMINISTRATIVE AND OVERHEAD COSTS. 0:\F0RM\MEPNEWPEHMl 12 062101 SAMPLE PROJECTS 1515 WEST STATE HWY. 114 - BEST BUY — 45,004 SQ.FT. — $2,100,000 VALUATION h CITY BUILDING PERMIT FEE Southlake 16,074.50 Colleyville 15,879.19 Keller 15,879.19 Grapevine — proposed 13,261.00 Euless 12,702.20 Grapevine - current 8,964.45 Fort Worth 7,087.00 Bedford 5,739.00 Flower Mound 4,700.40 Coppell 3,400.00 635 WESTPORT PKWY. — SHELL OFFICE/WAREHOUSE — 49,258 SQ.FT — $1,102,394 VALUATION CITY BUILDING PERMIT FEE Southlake 10,591.00 Colleyville 9,867.50 Keller 9,867.50 Grapevine — proposed 8,737.00 Euless 5,933.20 Grapevine - current 4,855.95 Fort Worth 4,694.00 Flower Mound 3,844.35 Bedford 3,743.50 Coppell 1,331.45 3000 GRAPEVINE MILLS — POLAR ICE — 78,363 SQ.FT. - $750,000 VALUATION CITY BUILDING PERMIT FEE Flower Mound 8,036.30 Southlake 7,899.50 Colleyville 7,293.83 Keller 7,293.83 Grapevine - proposed 6,517.00 Coppell 5,735.00 Euless 4,597.32 Fort Worth 3,547.00 Grapevine - current 3,395.70 Bedford 2,789.50 1155 W. WALL STREET — MIKE WARE OFFICE BUILDING — 3,930 SQ.FT. — $250,000 VALUATION CITY BUILDING PERMIT FEES Southlake 3,274.50 Colleyville 3,025.68 Keller 3,025.68 Euless 2,567.25 Grapevine — proposed 2,701-00 Fort Worth 1,597.00 Grapevine - current 1,414.45 Bedford 1,164.50 Coppell525.00 Flower . Mound 444.75 1235 WILLIAM D. TATE AVE. — SILVER FOX I GOOD EATS — 7,085 SQ.FT. — $171,000 VALUATION CITY BUILDING PERMIT FEE Southlake 2,484.50 Colleyville 2,295.73 Keller 2,295.73 Grapevine —proposed 2,050.00 Euless 1,947.89 Fort Worth 1,140.00 Grapevine - current 1,007.33 Flower Mound 908.50 Bedford 888-00 Coppell 400.00 1217 WEST STATE HIGHWAY 114 — FAMOUS FOOTWEAR REMODEL — 12,410 SQ.FT. - $90,000 VALUATION CITY PERMIT FEES --BUILDING Southlake 1,649.50 Colleyville 1,524.19 Keller 1,524.19 Flower Mound 1,441.00 Grapevine — proposed 1,361.00 Euless 1,293.25 Fort Worth i 788.00 v. ZM a 1yNvaai 11p1Up1 vJcAw CERTIFICATE OF OCCUPANCY CITY Southlake 50.00 Coppell 50.00 Flower Mound 50.00 Grapevine — proposed 50.00 Fort Worth 48.00 Colleyville 47.00 Euless 47.00 Keller 45.00 Bedford 40.00 Grapevine - current 25.00 v. ZM a 1yNvaai 11p1Up1 vJcAw HYPOTHETICAL PERMITS/FEES NEW RETAIL: 50,000 SQ. FT., $1,702,000 VALUATION CITY BUILDING PERMIT FEE Southlake 13,885.00 Colleyville 13,482.00 Keller 13,482.00 Grapevine — proposed 11,456.00 Euless 10,947.02 Grapevine - current 7,322.70 Fort Worth 6,131.00 Flower Mound 5,200.00 Bedford 4,943.00 Coppell 3,750.00 NEW OFFICE BUILDING: 5000 SQ.FT, $236,000 VALUATION CITY BUILDING PERMIT FEE Southlake 3,134.50 Colleyville 2,896.33 Keller 2,896.33 Grapevine — proposed 2,586.00 Euless 2,457.49 Fort Worth 1,538.00 Grapevine - current 1,275.45 Bedford 1,115.50 Flower Mound 700.00 Coppell 600.00 SINGLE FAMILY RESIDENTIAL: 3000 SQ.FT., $200,000 VALUATION CITY BUILDING PERMIT FEE Keller 2,563.69 Euless 2,175.25 Southlake 2,060.00 Grapevine — proposed 1,387.00 Colleyville 1,253.75 Fort Worth 1,187.00 Flower Mound 1,150.00 Coppell 1,125.00 Bedford 730.00 Grapevine - current 683.00 INTERIOR ALTERATION IN A RETAIL CENTER: 5000 SQ.FT., $75,000 VALUATION CITY BUILDING PERMIT FEE Southlake 1,462.00 Colleyville 1,350.93 Keller 1,350.93 Grapevine — proposed 1,206.00 Euless 1,146.25 Fort Worth 707.00 Flower Mound 700.00 Grapevine - current 590.70 Bedford 527.00 Coppell 250.00 v.,avv %I iyNvNci mi iiia