HomeMy WebLinkAboutItem 10 - Dove Elevated Storage Tank RenovationsMEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: BRUNO RUMBELOW, CITY MANAGER MEETING DATE: NOVEMBER 19, 2013 SUBJECT: AWARD OF CONSTRUCTION CONTRACT — DOVE ELEVATED STORAGE TANK RENOVATIONS, REPAIRS AND REPAINTING RECOMMENDATION City Council consider awarding the contract for the Dove Elevated Storage Tank Renovations and Repainting to A &M Construction & Utilities, Inc. in the amount of $757,270.00, authorizing a 5% project contingency in the amount of $37,863.50, authorize staff to execute said contract, and take any necessary action. FUNDING: Funds are programmed in un- appropriated Utility Fund Balance and will be transferred to Account # 200 - 48930 - 534- 8- 000035WA MONEENNEM The Dove Elevated Storage Tank was constructed in 1973 with a storage capacity of 750,000 gallons of water. The pedestal and the elevated bowl are steel construction requiring periodic painting and other maintenance activities. This tank was last emptied and painted between the fall of 1993 and spring of 1994. The City logos were touched up in 2008. Painting systems used on storage tanks typically last 12 to 15 years. The paint system life can be extended with minor maintenance. The interiors of all of our tanks are inspected annually by a certified inspector checking the paint system for pitting and deterioration. Last year, staff had DeltaTek, the City's elevated and ground storage tank consultant, perform a full inspection of this tank. The results of this inspection identified that the bowl and the pedestal needed painting and that structural repairs were needed on the pedestal due to corrosion. In addition to the painting and structural repairs, modifications to the tank are necessary to comply with regulatory agency regulations (TCEQ, AWWA, ANSI, OSHA) and to address operational deficiencies. These modifications include replacing the roof vent with a new vandal resistant vent, replacing the insect shield with one that will also shield from dust and other particulate matter, installing a new roof safety rail and installing an anti -fall railing on all access ladders. R:\AGENDA \2013 \11 -19 -13 \Dove Tank rehab Const Award.doc Bids were opened on October 30, 2013 with eight bids received as follows: A &M Construction & Utilities, Inc. $ 757,270.00 Utility Service Co. $ 954,900.00 Classic Protective Coatings, Inc. $ 967,950.00 N.G. Painting, Inc. $ 993,700.00 J.R. Stelzer Co. $ 998,952.00 American Suncraft Co. $1,201,287.00 TMI Coatings, Inc. $1,288,400.00 L.C. United Painting $1,411,000.00 Deltatek Engineering has reviewed the bids and has recommended that the City award the contract to A &M Construction & Utilities, Inc. Staff recommends approval. JDR /JSL RAAGENDA\2013 \11 -19 -13 \Dove Tank rehab Const Award.doc