HomeMy WebLinkAboutItem 18 - Electrical PurchaseMEMO TO
FROM:
MEETING DATE
SUBJECT
RECOMMENDATION:
mom
HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
ROGER NELSON, CITY MANAGER d�f
NOVEMBER 20, 2001
APPROVAL OF AN ELECTRICAL PURCHASE AGREEMENT
City Council to consider approving an agreement to purchase electrical energy and
authorize the City Manager as signatory and take any necessary action.
BACKGROUND:
Grapevine joined the Houston -Galveston Area Council (H -GAC) aggregation to secure
pricing for electrical purchase. Council approved a Resolution to authorize purchase of
electrical power from H -GAC and TXU Inc. on November 6, 2001.
The Resolution contained an indicative price of $0.041595/kwh and the provision that if
the price exceeded the indicative price the Resolution was not binding. TXU submitted a
final price on November 16, 2001 of $0.04397, due to a recent surge in natural gas
prices. This exceeded the indicative price and Grapevine had the option of waiving the
Resolution and seeking alternative procurement methods.
Staff contacted Malcolm Pirnie, our energy consultant, to seek their advice. Their
recommendation was that the final price submitted by TXU was still the most
advantageous offer (see attached letter). Bids were received on November 6, 2001 for
electric purchase from providers for Grapevine's electrical purchase and the final price
submitted by TXU was the overall best bid.
TXU pricing and terms and conditions are superior. Under the old price Grapevine stood
to save $382,000 for the 2 -year term based on last year's energy consumption. Based
on the new price Grapevine will still realize a savings of $362,000.
H-GAC/TXU's price was only good for the 24-hour period ending at 5:00 p.m. November
14. Market conditions are such that no provider will hold a price for longer than 24
hours. Staff felt it was in the best interest of the City to take advantage of the H-
GAC/TXU proposal and executed the offer sheet committing the City to a firm price of
$0.04397/kws for a 2 -year term.
MS/ms
o:\agenda\10-02-01\aggregation.agm
November 14, 2001 (11:37AM)
100 aced R IA308D 10 A110-01
OE9B1r5�01-Woij We91:80 100Z-trl-A0P1 peA1938N
November 14, 2001
Mr. Matt Singleton
Assistant Public 'Works Director
City of Grapevine
501 Shady Brook, Drive
Grapevine, TX 76051
RE: REVISED PROPOSAL o.F HGAC
Dcar Matt:
We have reviewed the revised pricing of HGAC. We recommcrzd you accept the revised
proposal based upon these key points.
-The pricing of the closest competitor, AES New Energy, is the same on the large
accounts but is likely to somewhat deteriorate if the small accounts are added in.
-The banding of HGAC is preferred and easier to manage.
-The payment terms of HGAC are 30 days while AES New Energy is requiring 15 days
payment.
-The HGAC aggregation should be able to identify and resolve electric service issues
sooner than any individual organization with its own supply contract.
Please do not hesitate to contact me if you have any questions.
Very Truly Yours,
MALCOLM PIRNM, INC.
John P. Nerison
Associate
4374001
c: Jerry Hodge
201 MCCUI k OUGH DRIVE SUITE 360 CHARLOTTE. NC 28262 704-547-8550 705-547-8S30 f=x http://v,%vw.pirnie.com
t/t 30` C1 0CSe/_t'stFO4'QI 110 aINdid W1031vW°WONA 90=01 10-bt-ADN
Cost Analysis*
*All values based on a two-year term contract.
(I ) Estimate 1.0 cent per kwh
(2) Used two part pricing (average price shown)
(3) City of Grapevine makes AES whole on consumption outside of band
(4) Quoted large and small accounts together
(5) Only applicable if Large and small accounts are included
(6) Excludes streetlights
City of Grapevine
November 2001
AES New Energy
1" ` � ����
First Choice Power
r�a,..
% Swing
10%
Unlimited
Acquisition Fee on
w
(3)
Actual Charges
g�
.,
i
None
Over Consumption
-
Over Consumption
, (3)
Actual Charges
None
Charge
Re -selling Fee on
l Ch(3)
Actual Charges
�5f
None
Under Consumptiona��
t�
'}.
Under Consumption
(s
Actual Charges )
�` ` �t
`x 1 tt
None
Credit
,K�t
Over Capacity Charge
gr) $0
�t r ati` i i l � �, y�
$0
�; N/A�r��
l
w n
N/A
Aggregation Fee
QJ '�
in
$12
Set Monthly Charge
$0
�� ;�N ��e ��i�1 � �%
i
{ t�
Transmission &mw
Distribution Charges
a� Pass Thru�k
Pass Thru
,
w�
y
�aQi �C bi 1.�.YY t51 e^'Ati �1
gj X11
�6)
Price All Accounts
diex Not Quotedti
. �€tit�i
50.0466 per kwh
Price Large Accounts
q {fa $0.04277 per kwh344tiper
�h
$0.0465 per kwh
Price Sinai] Accounts
'Not'V ikd Not Quoted
,, I` of Qitt�tid
$0.0469 per kwh
r
h�
1,
Price Street Lights
�;;t3tQtP�r: Not Quoted
Not Quoted
*All values based on a two-year term contract.
(I ) Estimate 1.0 cent per kwh
(2) Used two part pricing (average price shown)
(3) City of Grapevine makes AES whole on consumption outside of band
(4) Quoted large and small accounts together
(5) Only applicable if Large and small accounts are included
(6) Excludes streetlights
City of Grapevine
November 2001
41-111),
Contract/Plan 4: 1-SATYZ
Account Name: City of Grapevine
Plan Type: Flat
9TXU
Price Sheet — Flat Price TXU Energy Services
This Price Sheet is only valid in association with and shall remain subject to the Terms and Conditions for Supply of Electricity
("Terns") and Offer for Supply of Electricity referenced above and is contingent upon Customer's acceptance of the Offer prior to the
Offer Expiration Date. This Price Sheet is applicable to the Customer ESI number(s) identified on Exhibit A of the Terms.
Monthly Prices shall equal the sum of (i) the Monthly Standing Charge set forth below; plus (ii) the applicable per kWh charges set
forth below for the electricity; plus (iii) all costs and expenses of any nature whatsoever that are charged by the Transmission and
Distribution Service Provider ("TDSP") for the transmission and/or distribution of the electricity, as well as any other charges of the
TDSP that are attributable to the Customer Account numbers, including, without limitation, charges for reactive power; plus (iv) all
other tariffs, rates, riders, fees, and charges, charged by the TDSP or another party, that are mandated, levied, assessed, allowed, or
approved by the Texas Public Utility Commission and all other governmental or regulatory authorities, on or with respect to the
acquisition, sale, delivery, and purchase of the electricity; plus (v) all federal, state, and local taxes, of any nature whatsoever, imposed
by all governmental and regulatory authorities, on or with respect to the acquisition, sale, delivery, and purchase of the electricity,
including Seller's Texas Gross Receipts Tax on the sale of electricity to Buyer; plus (vi) the Over Capacity Charge set forth below, if
applicable: plus (vii) an aggregation fee of $0.00045 per kWh actually consumed by Buyer collected by Seller on behalf of and paid to
HGAC Energy Purchasing Corporation.
Charge
Amount
Month1v Standing Charge per
$5.00
rvice point
ll kWh
$0.04397 per kWh
$0.0170574 per kWh for delivery, excluding reactive
TDSP Delivery Charges
power, based upon current estimate;* Monthly price will
be based upon actual charges.
Tariffs, rates. riders. fees, and
charges other than those included
To be determined, varies by service point
in TDSP delivery charges above
All applicable taxes
To be determined, varies by jurisdiction
Over Capacity Charge
$0.00 per kW
The costs and expenses charged by the TDSP for delivery services may fluctuate during the Agreement Term, as will other applicable
taxes. tariffs, riders, fees, and charges.
* For reference purposes only. This is the current estimate of the average TDSP standard delivery costs, excluding charges for reactive
power, special metering, or other miscellaneous TDSP charges.
Form NameNersion: PRICE SHEET FLAT PRICE 110701
Page 1
Transaction Confirmation #: 1-8ATYZ
BUYER: City of Grapevine
SELLER: TXU Energy Services Company
208'W DALLAS RD STE
100
1601 Bryan, 7"' Floor
Grapevine, TX 76051
Dallas, Texas 75201
Phone:
Phone:
Fax:
Fax:
L AGREEMENT TERM
The Primary Term for each Premise, identified in Exhibit A, shall commence upon
the date of the first reading of the meter(s) on each respective Premise by the TDSP
after 01/0112002, or as soon thereafter as practicable, and shall end for each Premise
upon the date of the first reading of the respective Premise meter(s) by the TDSP after
12/31/2003.
II. PAYMENT TERMS
Net 30 Days
III. DEPOSIT AMOUNT
No initial deposit required.
IV. BILL PRESENTMENT
CI Paper
METHOD
V. PAYME:' 7METHOD
Check
VL STANDARD SERVICES
Toll free number (800) 725-7920) for 24 hour emergency outage and customer
service, available 7:00 a.m. to 7:00 p.m. on non -nal business days; Assigned customer
service representative, billing analyst, and assigned professional account manager.
I"II. CUSTOM SERVICES
Not Applicable
VIII. SPECIAL PROVISIONS
Not Applicable
IX. COST PER KWH
See attached Price Sheet
X. MONTHL Y CONTRACT
25% per month for excess usage and
USAGE TOLERANCES
25 %per month for under usage
(see section IV, Calculation and Payment of Charges in the Base Contract for Supply
of Electricity)
XI. TER,'tIS AND CONDITIONS
THE TERMS AND CONDITIONS FOR THE SUPPLY OF
ELECTRICITY ("TERMS") SEPARATELY EXECUTED BY
BUYER AND SELLER, ARE PART OF THE AGREEMENT TO
WHICH THIS OFFER FOR THE SUPPLY OF ELECTRICITY
APPLIES. BUYER ACKNOWLEDGES THAT IT HAS RECEIVED
THE TERMS, AND IN THE EVENT THAT BUYER HAS NOT
PREVIOUSLY EXECUTED THE TERMS, BY SIGNING THIS
OFFER BUYER AGREES TO BE BOUND BY THE TERMS AS
PROVIDED BY SELLER.
Buyer Signature:
Seller Signature:
Name (Please print):
Name (Please print):
Position:
Position:
Date:
Date:
Form Mme; Ver,ion- OFFER SHEET 110701
Page I