Loading...
HomeMy WebLinkAboutItem 09 - Rail Corridor Proposal MEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL 2 FROM: BRUNO RUMBELOW, CITY MANAGER �� MEETING DATE: NOVEMBER 15, 2016 SUBJECT: RAIL CORRIDOR PROPOSAL RECOMMENDATION: City Council to consider the attached proposal for the initial phase of the study of the Dallas Road Corridor, near the TexRail station area. BACKGROUND: As the City of Grapevine and its partners moved forward with the TexRail station design, Council determined as a part of the 2016 Strategic Plan, that a study of the Dallas Road corridor was needed as the potential for Dallas Road alterations/enhancements can have a significant effect on the ongoing rail station design. In addition, there is a need to determine a consistent set of design standards along the corridor as new development and redevelopment occur. Finally, it's important to design the streetscape so that it is appealing to pedestrians without impacting the circulation of vehicles. A design/planning/engineering team consisting of ArchiTexas, Gateway Planning, and Huitt-Zollars Engineering has prepared the attached proposal for the initial phase of the study. If City Council approves and wishes to proceed with work outlined in the presentation, staff will schedule an action item for consideration at the next meeting. Staff recommends approval. � ACR� � Dallas Road/Main Street Station Initiative Grapevine, Texas 11.8.16 Objective • Work with the City of Grapevine to establish a conceptual urban design plan for Dallas Road from Texan Trail to William D Tate Avenue that can accommodate the futl range of public mobility needs including vehicle circulation, pedestrian circulation and cycling that takes into consideration the appropriate projected future redevelopment potential of this corridor.The design should respond to the need to create an environment that encourages and attracts quality and appropriate development while creating a suitable urban space which is pedestrian friendly and memorable that connects the various future developments. • Create effective redevelopment context and plan at the intersection of South Main and Dallas Road to inform and enhance the proposed Tex-Rail and Grapevine Train Station development project. Process • Undertake work in phases,with initial work effort focusing on Dallas Road's design relationship to the station-area in order to ensure effective multimodal access with emphasis on walkability and context sensitive alignment between the new development and the roadway context. � Utilize traffic analysis to consider the most appropriate roadway design. • Undertake additional planning analysis of the project area to further refine the projected market and potential uses along the corridor and prescribe the most appropriate architectural response for the respective character zones and integrate into a form based code for the corridor. • Eventually reinvent Dallas Road from Texan Trail to William D Tate Avenue as a great unban environment that reflect the (see attached Roanoke example) www.Architexas.com �www.GatewayPlanning.com �www.Huitt-Zollars.com � ACR� �� Team • Craig Melde of Architexas, Scott Polikov of Gateway Planning and Tony Sosebee of Huitt- Zollars will lead the team to provide a multi-disciplined capacity so that the redesign of Dallas Road functions both for local destination redevelopment and regional traffic operations Scope/Budget/Timeline • The proposed attached scope and budget attached reflect an initial work effort to complement the TexRail station-area initiative • The timeline for completing this work will be approximately 60 to 90 days • After the initial phase, the City Council, Staff and the consultant team will determine next steps to analyze in detail the redesign and redevelopment opportunities for the remainder of the corridor www.Architexas.com �www.GatewayPlanning.com �www.Huitt-Zollars.com i A('R� �$ Task Total 1. Existing Conditions Assessment(Site visit+Base Map+Est. Mkt. Potential) I a. Analyze general existing development, roadway function,traffic projections b. Develop base map of existing conditions, ownership and constraints (assumes City to provide public infrastructure,topo, aerial mapping,traffic count data, property ownership information, as well as station-area design from TexRail) c. Assess market potential from existing data (half-day follow up Staff Session) $ 19,850 2. Prepare for and facilitate 1/2-day design workshop with consulting team and staff to develop sketch-level Dallas Road redesign concept including analysis of TOD station area context and high-level look at remainder of corridor from Texan Trail to William D Tate Ave/Ball Street $ 13,200 3.Prepare Refined Dallas Road sketch level concept with emphasis at Rail Station (Concept to be also delivered in CAD only at general rail station area) a. Identify Pedestrian Zones (public and private frontage interface), parking,cycling facility if feasible,general lane widths at Rail Station b. Determine whether major reconstruction or minor interventions make sense based on sketch level concept at Rail Station c. Refine very rough sketch-level complete street concept for remainder of corridor anticipating future additional planning to determine build-out planning,connectivity strategies,future anticipated major access and overlay strategies d.Assess transportation capacity of a reconfigured Dallas Road addressing vehicular traffic flows,traffic volumes,truck needs,and bicycles in a technical memorandum or short report for review by the City. $ 23,950 4. Prepare for and present sketch level Dallas Road concept and interface with Rail Station at City Council and Planning&Zoning Commission work session $ 12,625 5. Final Deliverables:Prepare and provide in PDF two(2) plan/section views along corridor+plan view of Intersection of Main and Dallas Road $ 9,850 Total Labor(not including ordinary out of pocket expenses or additional hourly) $ 79,475 www.Architexas.com �www.GatewayPlanning.com �www.Huitt-Zollars.com rR4(� k� � _ f�.-.: �, _ '� - ,� � - „ , ,_ -� ; ___ , : i-;� - , A 7 �` � � 1 �,_ i, _ ..,.�. n....�-......a..a...�.�.A+*�.. ,„i; _ � . 7 ,' _,:,'..(� �{� A`tai�]� �: . ' . ... ��.a..� ' :`_. `�. � J '} r . ,.3-='.. ' _,... .... --^.__. .. -.�-,v::__...... .�. . .... 4 5. �'. _ k " r{� � - r ly � �1 — �''i�s ��z� � �� e � ` � y��'�� '.f`�; "�r:� . iff���L ��. ���.. . � . ,�s r f,� ��`�. --.:� ' �:• _' . � � ' � " ..�;; ..��.,, , q . Oak Street Initiative— Before (2006) and After (2012j EXMBfT C�.REVISED OA1($TREET REGUTATlIG PLAI. DOWN�OWN ROMIONE .�..� :4h:' ..::. i .�� . � � � : . . � _. ,��� � _ ,.�. . ! ' �� .� a " . p�'_" + ��.'-/ x I _ _ �, F��C "P,.�j�in_�` :ftt � �_� r���.w � i��L*f't� ' ', • �S� � �'. l • -_ � ��,�-�'�� . 1 � ..._.... �a� �f_., <f ` `3"'t _.. �..r... j�..�`�. j e' a. �+ 9 +}'' n _ � ~"�r.Li^n'� a �: - . *p������;� � .., '`4���'� Ca ita/ �j '�-4� ����n9 p o f TP 1 ��i. Je +d j'�� ,".'ry + C�A S* �'�i � �` '- ¢� � co - t�" �r s.- ,�- : .._.._.. I i I I iJ t`��— a�o �-��`-= � no e , . oa www.Architexas.com �www.GatewayPlanning.com � www.Huitt-Zollars.com