Loading...
HomeMy WebLinkAboutItem 09 - Main Street Fire Sprinkler Project .�; �k,..;1�� � __�..._.__�...._....a.s�.==--_- ' MEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: BRUNO RUMBELOW, CITY MANAGER ��' MEETING DATE: JULY 15, 2008 SUBJECT: MAIN STREET FIRE SPRINKLER PROJECT CHANGE ORDER # 1 RECOMMENDATION: City Council consider approving Change Order #1 & Final to the Main Street Fire Sprinkler Project in an amount of $110,632.40, authorize City Staff to execute said change order, and take any necessary action. FUNDING SOURCE: Funds are currently available in the Project Fund Balance account 200-48930-534-8- 000004WA. BACKGROUND: The Main Street Fire Sprinkler System Project began construction on the evening of February 10, 2008 and, with few exceptions, has been a six night per week project since that first evening. With the project being a retrofit project of extremely old buildings with virtually no plans of the existing structures, the initial scope of the needed improvements prepared by the City's consultant, Reed Fire Protection Engineering, was an educated estimate of the coverage needs. As the project has progressed from block to block, the contractor has been able to closely inspect the detail of each building's roof structure and interior layout, discovering additional spaces and crawl space levels that need to be protected with this project. The net result has been an additional 140 sprinkler heads throughout the project representing a 7% increase in the total number of heads to 2,110 and an additional 83 dry pendant heads at three locations. These dry pendant heads are freeze proof and were installed in spaces that are unheated. ($58,756) The change order also includes cost for additional design by the contractor due to the added complexity of the needed systems in each block as well as user change outs and site changes during the project that have required re-design of certain spaces. ($9,920) R:IAGENDA\07-15-08\Main St FP CO#1.doc The owner at 338 Main Street requested changes to his space which will be added to his �- private cost for the project. ($7,622) The City staff initiated changes at two locations to make the system less obtrusive in areas where the ceilings were very low. ($ 5,980) Finally, the change order includes the cost to paint the pipes in those locations where the system was exposed to the patrons to improve the look of the finished product. The black pipe, as large as 4" in diameter, is basically a black steel pipe with industry specifications printed periodically on the sides. Additionally, the storage and installation of the pipe results in the pipe being scraped and scuffed. Finally, all of the pipe couplings come from the factory painted bright orange. We have gotten a price from a painting company to paint all of the pipes exposed to the public to provide a much better blending with the background ceilings and exposed truss work. ($28,354.40) As you recall, the bid for the construction of the project by Firetrol was significantly below the original estimate for the public improvements, yielding a total savings in contract construction costs of $455,632.76. This change order adds $110,632.40 to the original bid of $1,087.993.00 for a revised total contract cost of $1,198,625.40. This cost will be distributed between the property owners and the City in the original ratio of 36.57% Private and 63.43% City. Staff feels the changes were justified to insure a successful project and feels that the x painting should be undertaken to close out the project with an aesthetically pleasing final product. The cost including the change order is less than the original engineer's estimate and most of the building owners will realize a reduced cost based on the original estimate. Staff recommends approval. R:IAGENDA107-15-081Main St FP CO#1.doc CITY OF GRAPEVINE CONTRACT MODIFICATION AGREEMENT PROJECT: Main Street Fire Sprinkler System Project �,, OWNER: City of Grapevine ENGINEER: Reed Fire Protection Engineering CONTRACTOR: Firetrol Protection Systems DATE: July 15, 2008 CHANGE ORDER: 1 - UNIT 'GONTRACT 'QUANTITY ` ADJUSTEd " GOST ?' ITEM DESCRIPTION UNIT PRICE QUANT[TY CHANGE QUANTlTI` ' ADJUSTMENT - ADD ITEMS Additional Sprinkler Heads EA $250.00 1,970 140 2110 $35,000.00 Special Dry Heads LS $23,756.00 0 1 1 $23,756.00 Miscellaneous Additional Design Due to User& LS $9,920.00 0 1 1 $9,920.00 Site Change Outs Painting of Exposed Pipes LS $28,354.40 0 1 1 $28,354.40 Owner Requested Additions 338 Main St LS $7,622.00 0 1 1 $7,622.00 City Initiated Changes LS $5,980.00 0 1 1 $5,980.00 Subtotal Miscellanous $51,876.40 DELETE ITEMS y}4`�`' Original Contract Amount $1,087,993.00 Previous Change Orders $0.00 Change Order#1 &Final $110,632.40 Adjusted Contract Amount �1,198,625.40 The compensation agreed upon in this Change Order is for all costs the CONTRACTOR has incurred or may incur as a result of or relating to the changes in the scope of work whether said cost are known, unknown,foreseen or unforeseen at this time, including without limitation,any cost for dealy, extended overhead, ripple or impact cost,or any other effect on changed or unchanged work as a result of this Change Order. The compensation is for fully complete and in-place construction. The actual quantities of items installed or constructed have been measured and the quantities herein are adjusted accordingly. City of Grapevine Firetrol Protection Services By: BY� Mathew A. Singleton Date Date Director of Public Works Print Name �.