HomeMy WebLinkAboutItem 04 - Concrete Construction Services ���� � MEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: BRUNO RUMBELOW, CITY MANAGER �� MEETING DATE: JUNE 3, 2008 SUBJECT: RENEWAL OF BID 204-2004, ANNUAL CONTRACT TO PROVIDE CONCRETE CONSTRUCTION SERVICES RECOMMENDATION: City Council to consider award of annual contract renewals to Manning Concrete (primary) and Cole Construction (secondary) for Concrete (flat work) Construction Services. Purchases will be limited to the annual budgeted amount for this commodity. FUNDING SOURCE: Funds are available in account 174-43301-090-000 Street Maintenance/Capital Replacement/Transportation Infrastructure Maintenance. BACKGROUND: Bids were taken in accordance with Local Government Code Chapter 252, Subchapter B, Section 252.021 (a) and Section 252.041 (a). The bid was advertised in the Fort Worth Star-Te/egram on September 16, 2004 and September 23, 2004. Ttiis bid was first approved by Council on October 19, 2004 and was issued to establish fixed annual pricing for concrete construction services to be purchased on an as-needed basis by city departments. This contract established fixed square foot unit pricing for concrete flat work and handicap ramps in various thicknesses and linear foot unit pricing for retaining walls of various heights. The initial contract was for a one-year period with an option to renew the contract for four additional one-year periods. If renewed, this would be the third renewal period. Eight vendors responded to this bid. All vendors with the exception of Ed A. Wilson Company, met the requirements and specifications requested in the bid. Ed A. Wilson Company should not be considered for an award because they require a $1,500 minimum order. Since some of the work involved may fall under $1,500, the minimum amount required would penalize the City for smaller jobs. The lowest overall unit pricing was submitted by Manning Concrete. Manning has performed these services satisfactorily in prior years. The second low bid was from Green Scaping and the third low bid (that met the specifications and requirements of the bid) was from Cole Construction Company. Green Scaping declined to renew as secondary supplier. Manning Concrete has agreed to renew the contract with a 10% increase in price. Cole Construction has agreed to renew the contract with a 19% increase in price. Both vendors cited rising costs in metal prices and fuel for the increase in price. These are the first increases in pricing during the three year duration of this contract. Staff recommends renewal of the contract to Manning Concrete as primary vendor and Cole Construction as secondary vendor for �' concrete construction services. GR � Concrete Flat Work Renewal ,. q J�. f -. Y , : }; 'i � T }. � i � � � � ; , � ,r �� , � h anning ._.� ,.. 1 : E. ti C> � } � V Cole M � - `' Construction Construction j 2007 2008 2007 2008 Description Price Price Price Price : : :; ; x ,.. � <•- ,..,+� , . _3. . ,, -_ �:�� a z�t ri.r,�,� '�%. �S' t a�.-,, a?.t< �a ..g .��v..x,`;. � ` � i � � ,'� . '�� , �}.s� . .. .i .�. `� .... � 9, z? .,. .�. ....,..�.: � Price er occurrence of 4"thick fla� � � � � p t work-to perform all concrete work/No 1 removai/disposal/For project of 1-500SF $5.25 $6.30 $4.00 $4.40 Price per occurrence of 6"thick flat work-to perform ali concrete work/No 2 removal/disposal/For project of 1-500SF $5.80 $6.96 $6.35 $6.99 Price per occurrence of 8"thick flat work-to perform all concrete work/No 3 removal/disposal/For project of 1-500SF $7.10 $8.52 $6.50 $7.15 Price per occurrence of 4"thick flat work-to perform all concrete work/No 4 removal/disposal/For project of 500SF plus $5.00 $6.00 $3.95 $4.35 Price per occurrence of 6"thick flat work-to perform ali concrete work/No 5 removal/disposal/For pro�ect of 500SF plus $5.50 $6.60 $6.15 $6.77 Price per occurrence of 8"thick fiat work-to perform all concrete work/No 6 removai/disposal/For project of 500SF plus $6.50 $7.80 $6.35 $6.99 Price per occurrence of 4"thick flat work-to perform all concrete 7 work/Including removal/disposal/For project of 1-500SF $6.25 $7.50 $6.25 $6.88 Price per occurrence of 6"thick flat work-to perform all concrete 8 work/Including removal/disposal/For project of 1-500SF $7.85 $9.42 $8.50 $9.35 Price per occurrence of 8"thick flat work-to perform all concrete �, 9 work/Including removal/disposal/For pro'ect of 1-500SF $8.75 $10.50 $8.50 $9. Price per occurrence of 4"thick flat work-to perform all concrete 10 work/Includin removal/disposal/For project of 500SF plus $6.00 $7.20 $5.50 $6.05 Price per occurrence of 6"thick flat work-to perform all concrete 11 work/Including removal/disposal/For project of 500SF plus $7.50 $9.00 $8.25 $9.08 Price per occurrence of 8"thick flat work-to perform all concrete 12 work/Including removal/disposal/For project of 500SF plus $8.50 $10.20 $8.25 $9.08 Price per occurrence of 4"thick handicap ramps-to perform all concrete 13 work/Including removal/disposal/For project of 1-500SF $8.50 $10.63 $4.00 $4.40 Price per occurrence of 4"thick handicap ramps-to perform all concrete 14 work/Including removal/disposal/For project of 500SF plus $8.50 $10.63 $3.95 $4.35 Price per occurrence of 6"thick vertical retaining wall-to perform all 15 concrete work/For project of 1-2' High wall $47.00 $58.75 $23.00 $25.30 Price per occurrence of 6"thick vertical retaining wall-to perform all 16 concrete work/For project of 2-3' High wall $58.00 $72.50 $42.00 $46.20 Price per occurrence of 6"thick vertical retaining wall-to perform all 17 concrete work/For project of 4 plus' High wall $90.00 $112.50 $76.00 $83.60 Price per occurrence of 1' thick vertical retaining wall-to perform all 18 concrete work/For project of 1-2' High wall $62.00 $77.50 $29.00 $31.90 Price per occurrence of 1' thick vertical retaining wall-to perform all 19 concrete work/For project of 2-3' High wall $75.00 $93.75 $57.00 $62.70 Price per occurrence of 1' thick vertical retaining wall-to perform all 20 concrete work/For project of 4 plus' High wall $126.00 $157.50 $96.00 $105.60 $555.d0 >; �$689.75 '-;$409;50 ,:.:�.$450:49 19.0% 10. ��. _. � •u . . 04/29/2008 12:59 8173795258 PAGE 02/64 Ca1e C�r�stzMu.c�xon Inc. � April 28, 2008 Gary Rascher Purchasing Coordinator 549 Shady Brook Drive, Room #108 Grapevine, Texas 7&Q51 �te: City of Grapevine Contr$ct-204-Z008 Concret� Flat Wark Dear Gary: We would like to renew aur contract with the City af Grapevine. Due to the recent increase in fuel and m�terial, we have had ta increase our prices. P(ease see attached for aur price adjustmenfs. We appreciate the opportunity to provide this proposal. Please call sh�uld you have any qu�stions. Sincerely, �awc�rCe'�cui� �� Donnie Hunt Operations Manager Z0315 .F1.lta V�sta Road, I�eller, TX 7G248 8I7-431-9636 817-379-5258 FA,� Manning Concrete Sawing � P.O. BOX 123566 Forth Worth, TX 76121 Manning Concrete Sawing will renew contract with the city of Grapevine. Manning Concrete would like this opportunity to ask for 10% increase in the bid tabulation due to the increase in the cost of doing business. Fuel, insurance, steel, and concrete has increased in the past years. Manning Concrete is very pleased to do work in the City Of Grapevine. Thank you. Henry Manning /�/-�.�-�,�.�- l'l'%'%�y����'� `t � BID TABULATION INVITATION TO BID 204-2004 ANNUAL CONTRACT FOR CONCRETE SERVICES C N N O o�j y N . ` � y VENDORS......................................................... ` Cj � Y a o � � � H c c � � a � V c `o u°r m y o m ` n m � rn y c . U � � y � � C7 ` � y n o Eo aa � � m wo ¢ L `' U Q U -» U � �U W � W scri tion Unit 'Unit Price Unit Price Unit Price Unit Pnce Unit Price Unit Price Unit Price Unit Price Price per occurance of 4"thick flat work-to perform all 1 concrete work/No removat/disposal/For project of 1- 500SF SF $5.25 $5.75 $4.50 $5.08 $4.00 $4.18 $6.00 $6.97 Price per occurance of 6"thick flat work-to pe�form all 2 concrete work/No removai/disposal/For project of 1- 500SF SF $5.80 $7.00 $5.50 $5.68 $6.35 $5.15 $7.50 $7.40 Price per occurance of 8"thick flat work-to perform all 3 concrete work/No removal/disposal/For project of 1- 500SF SF $7.10 $8.50 $6.90 $6.48 $6.50 $6.30 $9.00 $7.83 Price per occurance of 4"thick flat work-to perform all 4 concrete work/No removai/disposal/For project of 500SF lus SF $5.00 $5.25 $4.20 $4.88 $3.95 $4.05 $5.25 $4.17 Price per occurance of 6"thick flat work-to perform ali 5 concrete work/No removal/disposal/For project of 500SF lus SF $5.50 $6.50 $5.20 $5.48 $6.15 $4.99 $6.00 $4.65 Price per occurance of 8"thick flat work-to perform all 6 concrete work/No removal/disposal/For project of 500SF lus SF $6.50 $8.00 $6.70 $6.28 $6.35 $6.10 $7.50 $5.14 Price per occurance of 4"thick flat work-to perform all 7 concrete work/Including removal/disposal/For project of 1- 500SF SF $6.25 $7.00 $5.20 $6.58 $6.25 $4.40 $7.50 $7.29 Price per occurance of 6"thick flat work-to pertorm all 8 concrete work/Including removal/disposal/For project of 1- 500SF SF $7.85 $8.50 $6.30 $7.48 $8.50 $5.70 $9.00 $7.72 Price per occurance of 8"thick flat work-to perform all 9 concrete workllncluding removal/disposal/For project of 1- 500SF SF $8.75 $10.50 $7.90 $8.98 $8.50 $7.10 $11.00 $8.15 Price per occurance of 4"thick flat work-to perform all 10 concrete work/Including removal/disposai/For project of FnOSF lus SF $6.00 $6.50 $4.90 $6.18 $5.50 $4.30 $6.50 $4.31 �per occurance of 6"thick flat work-to perform all 1,, ;,.,crete work/Including removaUdisposal/For project of 500SF lus SF $7.50 $7.50 $6.00 $7.38 $8.25 $5.55 $7.25 $4.79 Price per occurance of 8"thick flat work-to perform all 12 concrete work/Including removalldisposal/For project of 500SF lus SF $8.50 $9.50 $7.70 $8.68 $8.25 $6.90 $9.00 $5.28 Price per occurance of 4"thick handicap ramps-to 13 perform all concrete work/Including removal/disposai/For ro'ect of 1-500SF SF $8.50 $9.50 $15.00 $5.13 $4.00 $12.80 $10.00 $7.50 Price per occurance of 4"thick handicap ramps-to 14 perform all concrete work/Including removal/disposal/For ro'ect of SOOSF lus SF $8.50 $8.50 $15.00 $5.08 $3.95 $11.50 $5.00 $4.52 15 Price per occurance of 6"thick vertical retaining wail-to erform all concrete work//For ro'ect of 1-2'Hi h wall LF $47.00 $55.00 $60.00 $35.60 $23.00 $69.00 $25.00 $77.08 16 Price per occurance of 6"thick vertical retaining wall-to erfortn all concrete work//For ro'ect of 2-3'Hi h wall LF $58.00 $80.00 $80.00 $59.40 $42.00 $80.00 $55.00 $95.77 17 Price per occurance of 6"thick vertical retaining wall-to ertorm all concrete work//For ro'ect of 4 lus'Hi h wail LF $90.00 $105.00 $105.00 $107.20 $76.00 $98.00 $75.00 $114.46 �$ Price per occurance of 1'thick vertical retaining wall-to erform all concrete work//For ro'ect of 1-2'Hi h wall LF $62.00 $72.00 $85.00 $37.60 $29.00 $82.00 $40.00 $89.47 �9 Price per occurance of 1'thick vertical retaining wall-to erform all concrete work//For ro'ect of 2-3'Hi h wall LF $75.00 $98.00 $115.00 $62.40 $57.00 $105.00 $100.00 $110.86 20 Price per occurance of 1'thick verticai retaining wall-to erform ail concrete work//For ro'ect of 4 lus'Hi h wall LF $126.00 $122.00 $130.00 $115.60 $96.00 $120.00 $125.00 $134.06 Unit Price Totals.................................................. $555.00 $640.50 $676.00 $507.17 $409.50 $643.02 $529.50 $707.42 . m � m� r°. m r? m � � � � T�cn T �cnG � ��-:r:,„.-..�- .�.. � .�.. < -. NUTES............................................................. 3 m � � n�i � O Q (�p �C O (�p �C d � � r o 3 � r o m � a m c. v o-m c, o � od • � o �' � � rTt �, r � aTW d Q �1N pj Ui N O " � N O "' N O