HomeMy WebLinkAboutItem 11 - Utility Rate Study ���I�'� � ..���_.-.! MEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL 2 FROM: BRUNO RUMBELOW, CITY MANAGER � MEETING DATE: JUNE 23, 2008 SUBJECT: UTILITY RATE STUDY CONTRACT RECOMMENDATION: City Council consider approving a contract with J. Stowe and Company in the amount of $53,000.00 to develop a Water and Wastewater Cost of Service and Rate Design Model, authorize the City Manager to execute said contract, and take any necessary action. FUNDING: Funds are currently programmed and available in the following accounts: Water Distribution Professional Services 200-44540-530-1 $17,500.00 Water Treatment Professional Services 200-44540-530-2 $ 8,000.00 Wastewater Collection Professional Services 200-44540-531-1 $17,500.00 Wastewater Treatment Professional Services 200-44540-531-2 $10,000.00 BACKGROUND: The last financial analysis on utility rates was conducted by Freese & Nichols in 2004. At the time, the study recommended an increase in utility rates for 2005. Utility rates were not changed and have remained the same since 1999. Two developments affected the fund balance and allowed rate adjustments to be postponed. A large capital investment (�$13 million) was anticipated to build a booster pump station. The booster pump station was required to provide treated water from the Trinity River Authority (TRA) at an adequate pressure as our flow needs increased to meet our growth. Recent studies have indicated that this investment was not needed. We also had an exceptionally dry (drought) year in 2006 that boosted our operating revenues. However, we are currently facing a significant capital investment arising out of utility relocations from the DFW Connector (Funnel) project. Although exact costs are not available yet, preliminary estimates place the relocation cost in the range of $15 million. Operational costs have also steadily increased over the past few years and continue to trend upward, e.g., power costs have doubled since 2006 and the cost of chemicals has increased more than 15% this year. June 18, 2008 (11:24AM) The Cost of Service and Utility Rate Design model wiil allow us to more accurately assess the impact of such developments on our financial condition. The Study will ° accurately determine the current cost of providing water and wastewater services to the residents of Grapevine and the model will allow us to predict if our current utility rates will be adequate to provide these services. In addition, the mode� will allow us to track and compare actual costs and revenues with projections. Typical rate studies predict costs and revenue for a three to five year horizon. A new rate study has to be done after this period. The model approach altows staff to make these projections on a continuous basis year after year by updating the model. As part of the proposal, the consultant wi�l provide training to Staff on using and updating the model. J. Stowe & Company has conducted numerous such studies and has the qualifications and expertise to conduct the study and prepare the model. Staff recommends approval. MS/rc 0:lagenda\06232008\agmemo.utility rate study.doc June 10,2008 (1:06PM) J . STOw E & Co. May 1, 2008 ��. i�ia U.S. Mail Mr. Ramana Chinnakotla Transportation and Utilities Manager City of Grapevine Municipal Service Center � 501 Shady Brook Grapevine, Texas 760�1 RE: City of Grapevine,Texas 2008 Water and Wastewater Cost of Service and Rate Design Model Dear Mr. Chinnakotla: J. Stowe & Co. is pleased to have this opportunity to propose our assistance to the City of Grapevine ("The City") to develop a Water and Wastewater Cost of Service and Rate Design Model. J. Stowe & Co. believes it is uniquely qualified to provide this assistance inasmuch as Mr. Stowe, firm founder and President, has in excess of thirty (30) years experience in conducting such studies and developing supportive models for the Texas Water and Wastewater industry. This includes assisting such cities as Arlington, Waco, Lewisville, North Richland Hills, Haltom City, Brenham, Terrell, and Paris,just to name a few. Mr. Stowe has also performed cost of service engagements for many of the largest wholesale providers in the state including, Tarrant Regional Water District, North Texas Municipal Water District, Sabine River Authority, Lower Colorado River Authority, and `'�"* Dallas Water Utilities. Mr. Stowe's professional Resume is attached for your review and consideration. This Letter of Transmittal provides our understanding of the Project and Scope of Services desired by the City of Grapevine. In addition, we have provided our cost proposal to successfully complete the project, as outlined on Attachment A, at a price NOT TO EXCEED $�3,000.00. After you have had the opportunity to review this letter should you, your staff, and/or Council have any questions or require additional information, please do not hesitate to contact me at 469.467.7799 or by email at jstowen�j sfoweeo.com � Again, thank you for this opportunity and we look forward to working with you on this important engagement. f, Very.truly yours, � �`� �'`� __._��^ j �, --� � � ` i ; ack E. Stowe, Jr. President and Founder J. Stowe & Co. .��. t560 J.Place,Suite 379 515 Congress Avenue,Suite 1515 Plano,TX 75074 Austin,TX 78701 469.467.7799 512.472.0719 Scope of Services and Price Proposal Project Understanding Based upon the requested Scope of Services and conversations with the City, it is our understanding that tlie City desires a qualified consultant to perform a water and wastewater retail cost of service and rate design study and provide a computerized rate model for City Staff use. Specifically, the City is interested in the selected consultant to address the following issues: ■ Evaluation of the current rate structure to determine its appropriateness in recovering the City's revenue requirement while also encouraging water conservation. ■ Comparison of the rates, usa�e, and consumption of surrounding cities to that of the City of Grapevine and identification of rate-making best management practices and recommended rate structures. As part of the requested Scope of Services, the City is specifically seeking a consultant who can develop a Microsoft Excel based utility rate model which is tailored to the City's cost, revenue, and contract structure. Features of the rate model will include, but not be limited to: ■ Ability to forecast a five-year revenue requirement; ■ Functionality and ability to perform and determine the impact of"what-if' scenarios through the input and alteration of City-identified key variables; • Functionality and ability to conduct sensitivity analysis to see the impact of a change in key variables and include such analysis in management reports; ■ Ability to compare actual financial and operational performance to model projections; ■ Ability to produce useful manabement reports at both a summary and detailed reporting level; ■ Inclusion of built-in instructions for each model worksheet or form. In developing the model, the Consultant is expected to provide an electronic users manual which fully explains the methodology of the model along with key inputs, outputs, data entry, and reporting features. The consultant shall also provide a training session to key City staff inembers on the operation and function of the rate model. Based on our understandin� of the City's goals and objectives for this project, we have developed the following Work Plan. Scope of Services and Price Proposal ,�.�. Work Plan To perform the requested study, J. Stowe &Co. proposes the following Work Plan. Task 1 —Initiation of Data Request Upon notification of award, the Project Team will develop an initial data request that we will need to adequately begin the review and evaluation of the City's water and wastewater expenses, rates, and financial position. This data will include, but is not limited to, operating, financial, management, policy, and ordinance data. We will issue the initial data request approximately two to three days after receiving notice to proceed on the project. A brief sample of the types of data we would expect to request in our initial Request for Information(RFI)will include, but will not be limited to: • Prior rate studies by outside consultants • Audited annual financial reports • Budget vs. actual line item revenues and expenses ■ Rate Ordinances ■ Current water and/or wastewater contracts ■ Bond covenants and payment schedules for all outstanding water and wastewater bonds ■ Historical water consumption by customer class ■ Historical wastewater billing volumes by customer class • Any projections made by City staff as to future water/wastewater volume demands ■ Wastewater treatment plant volumes and loading data(BOD, TSS,NH3) ■ Water Treatment Plant volumes ■ Purchased water volumes • Purchased wastewater treatment volumes As stated, this list represents a preliminary sample of the types of information which will be required to complete this study. Additional RFIs will be developed as the initial analysis of the data received is completed. Task 2—Data and Information Assessment Once the City has submitted the requested data, we will review it and be prepared to discuss the supplied information during the project kick-off ineeting. Data received by the Project Team will be sampled and tested for accuracy. We will conduct informal interviews with City staff during our review of the historical data to ensure that the Project Team understands the information provided. With regard to the required billing data, we will work closely with the City's billing personnel to extract the appropriate information from the billing system database in the most cost-effective manner. This volumetric information is critical to the development of rates by customer class, and every effort will be undertaken to ensure its accuracy and relevance. Task 3—Project Kick-off Meeting After receiving the information requested, we will work with the City to schedule a kick-off ineeting. The primary reason for the kick-off ineeting is to allow the key Project Team consultants and participants from the City to be introduced and lay the general framework for how the study will be ri��`' conducted. This meeting will allow for the finalization of the proposed wark approach, as well as discuss and clarify the information analyzed in Task 2. 2 Scope of Services and Price Proposai :�E'C'l1/l�, U�JfE'CIItiC',S: ■ Introduce J. Stowe&Co. team to City staff ■ Outline roles, duties,and responsibilities of Project Team members ■ Match Project Team members with appropriate City designee(s) ■ Establish lines of communication ■ Document the City's expectations ■ Finalize the project approach to meet the City's expectations • Discuss the status of outstanding data requests It is our experience that the project kick-off ineeting is critical in achieving successful results in any project. These meetings not only assist J. Stowe & Co. in accurate(y assessing procedures, processes, politics, and policies, but also provide an opportunity to attain"buy-in"and input from City personnel. Task 4—Determination of Test-Year Revenue Requirements A test-year is a common term in rate studies that refers to adjusted fiscal year costs that will be used as a basis for setting rates. Revenue requirements are typically determined using one of two generally accepted methodologies: cash basis or utility basis. Project Team members will utilize the cash basis to develop the City's revenue requirement, and the enclosed price proposal is based upon this assumption. However, should the City desire revenue requirements developed upon the utility basis, this will be provided at a mutually agreed upon price. Once developed, the members of the Project Team will conduct an on-site meeting with City Staff to review and finalize the water and wastewater revenue requirements. Task 5—Determination of Realizable Revenue at Current Rates The results of this task will provide the data to properly evaluate the cost of service, the magnitude of overall increases, if any, and the probability of redistribution of revenue responsibility between customer classes. This task will also provide a"check"of the data provided by the City. Task 6—Functionatization of Revenue Requirements Functionalization of revenue requirements is the homogenous grouping of expense and capital related costs by the service function provided. The Project Team will determine those costs that are specific to the water and wastewater systems, as well as common costs incurred by both systems (e.g., administration). Task 7—Classification of Revenue Requirements Water Reve�zue Requirentents J. Stowe & Co. recommends that clients conduct a revenue classification using a methodology that is in compliance with American Water Works Association (AWWA) standards. Therefore, with the approval of the City, J. Stowe & Co. will utilize the base-extra capacity methodology. This base-extra capacity method typically separates costs of service into three primary cost components: (1) base costs; (2)eYtra- capacity costs; (3) customer costs. These three components are defined within the American Water Works Association "M1"manual as follows: ■ Base Costs—costs that tend to vary with the total quantity of water used plus those operation and maintenance expenses and capital costs associated with service to customers imder average load canditions 3 Scope of Services and Price Proposal • Extra-Capacity Costs — costs associated with meeting rate of use requirements in excess of average and include operation and maintenance expense and capital costs for system capacity beyond that required for average rate of use. ■ Customer Costs — those costs associated with serving customers, irrespective of the amount or rate of water use. In applying the base-extra capacity method, it is imperative that the demand factors that form the basis of the base costs and extra-capacity costs be appropriately identified. This identification requires a thorough understanding of the influencing conditions controlling the design of a system. Members of J. Sto�ve & Co.'s team have utilized base-extra capacity methodology in the majority of water cost of service and rate design studies conducted to-date. We will thoroughly analyze the demand factors in this task in order to properly al(ocate costs utilizing the base-extra capacity methodology. Wastewater Revent�e Requirements The Project Team proposes, under the supposition that the City has an eYisting wastewater monitoring and surcharge program, that the volume/strength (i.e., TSS, BOD, and NH3) cost classification methodology be employed for cost allocations for the City's wastewater service for the wastewater treatment plant. Additionally,the Project Team will recognize strength loading requirements included in the City's wastewater treatment contract with TRA. Other ancillary costs associated with monitoring wastewater collection and transmission costs will be classified as volume related. Wastewater treatment and related operation-and-maintenance costs plus capital costs are segregated as to vo(ume and strength as endorsed by the Water Environment Federation (WEF). As in the water cost determination, a thorough understanding and determination of the costs incurred, due to plant loading, must be made for the appropriate wastewater costs to be assigned to the respective customer classes. . Task 8—Allocation of Revenue Requirements One of the most important considerations in the setting of fair and equitable rates for utility service is the establishment of the appropriate grouping of customers (i.e., customer classes for cost distribution after costs are classified). Generally, a customer class should only include those customers who: (a) are in a similar location in relation to the utility; (b) use the same or similar service from the utility; and (c) receive similar service from the utility and place similar demands upon the utility. The Project Team will analyze the usage patterns of the presently defined customer classes in the above context and evaluate whether a new classification of customers should be recommended. To the extent that new classes are warranted,the Project Team will assist in determining the specifications for the new customer classes. Project Team members will meet with City Staff to discuss our findings regarding the City's current and/or proposed grouping of customers as well as the customer class cost allocations. Task 9—Development of Retail Rate Design In the formulation of a rate and fee design plan, a clear and distinct understanding of the City's overall goals and objectives should serve as the foundation for the development of options since rate and fee design enables the utility to meet its service pricing objectives. Pricing objectives could include, but would not be limited to, cost of service recovery, revenue stability, water conservation, and economic growth. Members of the Project Team will conduct an on-site meeting with City Staff to discuss and determine the rate design alternatives that will meet the City's pricing goals and objectives. At this meeting, the Project Team will also discuss best management practices that have been identified with regards to rate design. The not-to-exceed price provided in this proposal incorporates a maximum of one water rate structures and one wastewater rate stnictures to be developed. Additional rate structure alternatives desired by the . City�vill be provided on a mutually agreed upon price. 4 Scope of Services and Price Proposaf Task 10—Determination of Realizable Revenue at Proposed Rates This task is one of critical significance as it confirms that the rates established are sufficient to meet the City's goals and objectives. The Project Team will analyze and compare the revenues forecasted to be generated, by customer class, to the forecasted revenue requirement to determine the adequacy and accuracy of the projections. Task 11 —Rate Comparison Review The Project Team will compare the City's current and proposed water and wastewater rates to water and wastewater rates of similar municipal utilities. In addition, to the extent that information is able to be obtained,J. Stowe& Co. will also provide consumption and customer data for the comparable municipal utilities. Task 12—Draft Report Preparation and Presentation The Project Team will develop a draft report summarizing findings and recommendations of the water and wastewater rate study. J. Stowe & Co. is committed to ensuring that the City thoroughly understands the recommendations in the draft report and will be available to discuss findings, answer questions, and receive input. The Project Team will present the findings to City staff and ensure that these individuals have enough time to address their concerns andlor questions. Task 13—Final Report Preparation and Presentation Upon receipt of City Staff recommendations and comments, the Project Team will make appropriate changes and provide the City with the final report. After completion of the final report, if requested, the Project Team will make a presentation to the City Council. Task 14—Finalization of Model and Training Session The development of the rate model will occur throughout the course of the project. Once the project has been finalized, the Project Team will work to form this model into a"user-friendly" program for use by City Staff. The model, developed in Microsoft Excel, will allow for "what-if' scenarios including, but not limited to, changes in operating and capital costs, customer and volume growth or decline, debt service structure, source costs, inflation, capital project financing, and funding sources. The model will allow the user to assess the impact various scenarios will have on an existing typical monthly bill. The model will generate financial statistics such as debt coverage ratios and average dollar and percentage change for each customer class. The model wili also be developed so as to allow the user to compare actual performance to the projections produced by the model. Inputs and assumptions in the model will be clearly marked and defined and instructions will be included for each model worksheet or form. 5 Scope of SeNices and Price Proposal ���:, Deliverables Upon completion of this study we will provide the City with the following: ■ Draft Report Presented within 90-120 days of notification of award, given the timely receipt of the required financial and operational data, one electronic copy of a draft report will be provided for the City's review and comment that summarizes the Project Team's findings and recommendations. ■ Final Report Twelve(12) bound copies and one electronic copy will be provided to the City within two weeks after delivery of the draft report, given the timely receipt of the Ciry's comments. Additionally, if requested, the Project Team will make one formal presentation of the Final Report to the City Council. ■ Meetings Our proposed project budget reflects a total of four (4) on-site meetings and/or presentations, which is inclusive of one City Council presentation and the Electronic Rate Model Training Session. Additional on-site meetings will be provided at time and expense. ■ Electronic Rate Model and Training Session(4 hours on-site) Price Proposal Based upon our understanding of the scope of services requested by the City, for this engagement and the enclosed work plan,J. Stowe&Co. proposes a not-to-exceed project budget of$53,000, inclusive of �► all labor and expense charges. This price will remain in effect for ninety (90) days from the date of this proposal. ��;� 6 Q c a� � L U (II -' Q � O O O O O O O O O O O O O �A tC) O � � d� O O O O O � O O Cfl CO � N f� O t� CO (O QO N � c`') CO �' N � � O � t!) O � O � f� � N N N u) CO � � CO N N N M � tf) tn Q. O a` a� U L a � � � � � � � � � �' � a� c� c�'a a�i '� .� � � � � � ~ � � � � � � o � � -� L � �- .� � (II N � � •V � C � � C `� C c C O C Q � o O �� � � � O O .N U a. a. � � C co (a ,� U - -� @ N O V N � .� � � � C C � � � � � C � C C O � � a Q � j > � •� � �� > � � C � a T� .V � � � � � � N N a � �C "'"' � U � a � � � N N•� � � "O '� N � d j y � � � � � N� S] 3 cCU � � X > � Q ��- N � � � � N .� O O � W w � "-' — N N = � > �. � (9 O �� � � � � > 7 � � � N N � � � �' (0 � f- � O � � � �' � QQO O � t�0 Q � p p Q O � O � � � N � U � � � � ,O O N � � C O (0 � � � Y N O � V � � � � � � � � � V � C p Y � c C U O � C � Q Q.� O O � V � E .� `�= � O EUR � N a �. (0 (6 .� � � C � V j N � �- (0 tiS � tII =� (a � N N � � � N � t6 � ,C � � � ❑ � � 0 tl U Q � � Q.' � L.L LL 0 1- Y � c- N C'*) �' U� Cp f� 00 � O � N M �' Hr r T C- r