Loading...
HomeMy WebLinkAboutIA2005-0962 (2)1!)� rT B d S JOB ADDRESS: LOT: APR 14 2005 1)11 (!E I•,� �`,r t PERMIT #:�D'y(v BUILDING PERMIT APPLICATION PLEASE PRLYT 0C9 f ��I 0 BLOCK: I SUBDIVISION: BUILDING CONTRACTOR (company name): CURRENT MAILING ADDRESS: CITY /STATE /ZIP: PROPERTY OWNER: ,.`7Tr !' ""' CURRENT MAILING ADDRESS: �S� riv A �.a 6,- r1� Ale C1 NUMBER: �rS1x X2 CITY /STATE/ZIP: PHONE NUMBER: dr PROJECT VALUE: Cy O J DESCRIPTION OF WORK TO BE DONE: USE OF BUILDING OR STRUCTURE: NAME OF BUSINESS.- x,SO Cr�/e )FIRE SPRINKLERED? YES /I NO Gr✓-�. d� ** Total Square Footage under roof: �`� Square Footage of alteration/addition: Qf�I hereby certify that plans have been reviewed and the building will be inspected by a certified energy code Inspector in accordance with State Law. Plan review and inspection documentation shall be made available to the Building Department ( required for new bulldings, alterations and additions) D I hereby certify that, Dllaans a` en submitted U t4he Texas Department of Licensing and Regulation for Accessibility Review. Control Number: 9 (Not required for I & 2 family dwellings) "FOR DEMOLITIONS, ADDITIONS AND OR ALTERATION TO COMMERCIAL AND PUBLIC BUILDINGS D ]hereby certify that an asbestos survey has been conducted for this structure In accordance with the regulatory requirements of the Texas Department of Health. I hereby certify that the foregoing is correct to the best of my knowledge and all work will be performed according to the documents approved by the Building Department and In compliance with the City Of Grapevine Ordinance regulating construction. It is understood that the Issuance of this permit does not grant or authorize any violation of any code or ordinance of the City Of Grapevine. I FURTHERMORE UNDERSTAND THAT PLANS AND SPECIFICATIONS ARE NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY, AND THAT THE DESIGN PROFESSIONAUOWNER IS RESPONSIBLE FOR OBTAINING SUCH APPROVAL FROM THE APPROPRIATE STATE AND OR FEDERAL AGENCY(S). PRINT NAME:. z SIGNATURE: THE FOLLOWING IS TO E COMPLETED BY THE BUILD G INSPECTION DEPARTME Construction T e: Permit Valuation: $ 0 Setbacks App roval to Issue Occu pancy Group: Front: Electrical Division: Building Width: Left: Plumbing Zoning: L Bwildin D the Right: Mechanical Rear: Plan Review Approval: Date: S Water Availability Rate: Site Plan A roval: Date: Sewer Availability Rate: ire D artment: M Date: p Building Permit Fee: -Public Works D artment: Date: Plan Review Fee: c5lealth Department: Date: Lot Drainage Fee: pproved for Permit: Date: Total Fees: Lot Drainage Submitted: proved: Ah yj Q 5 1 Total Amount Due: P.O. BOX 45104, GRAPEVINE. TX 76099 (817) 410 -3165 w / I O :FORMIBUILDING .APP -1 17/02— Rev.11 /14!04 CITY OF GRAPEVINE MECHANICAL ELECTRICAL PLUMBING�� PERMIT FEES ms`-µ (PLEASE PRINT) - -- ❑PR 9 Q ` nn; PERM1Tli 13LDG,PERIVIfT# PERMIT FEES DATE: JOB ADDRESS' DESCRIPTION OF WORK: UI� 6► N o f � .ice �'Nf,% C3 t% PROPERTY OWNER. CONTRA ADDRESS: ADD ES� 1 - 749 CITYlSTATE2IP: C 1STATE2IP: 750- 1,199 PRONE NUMBER: PHO_N U B 1,200- 1,500 TYPE OF OCCUPANCY BUILDING AREA PERMIT FEES AMOUNT DUE (SO FT) EACH TRADE I. R -3 1 - 749 $ 33.25 SINGLE FAMILY, DUPLEX 750- 1,199 $ 49.88 TOWNHOUSE, 1,200- 1,500 $ 53.18 NEW CONSTRUCTION & 1,501- 1,750 $ 78.48 ADDITIONS (PER UNIT) 1,751- 2,000 $ 83.13 2,001- 2,250 $ 89.78 TOTAL SQ. FOOT UNDER 2,251- 3,000 $ 98.43 ROOF 3,001- 3,504 $ 103.08 3,501- 4,000 $ 109.73 $ 4,001+ $ 120.37 EACH TRADE 11. A, E, I, R -1 1- 500 $ 37.00 HOTELS, APARTMENTS, 501 - 100,000 $ 17.50 +.035 PER DRINKING/DINING, 100,001 - 500,000 $ 3,500.00 +.03 SQUARE EDUCATIONAL, ASSEMBLY, 500,001 + $15,000.00 +.02 FOOT $ INSTITUTIONAL EACH TRADE III. B, F, H, M,S,U 1- 500 $ 37.00 OFFICE, RETAIL, WHOLESALE, 501- 50,000 $ 32.00+.01 PER GARAGES, FACTORIES, 50,001- 100,000 $ 182.00 +.007 SQUARE WORKSHOPS, SERVICE 100,001+ $ 582.00+ .003 FOOT $ STATIONS, WAREHOUSE CONTRACT EACH TRADE VALUATION OF IV. WORK ANY OCCUPANCY GROUP ALTERATIONS, FINISH -OUTS, 0- 500 $ 37.00 SHELL COMPLETIONS 501- 1,500 $ 45.00 1,501- 3,000 $ 57.00 3,001- 5,000 $ 72.00 CONTRACT VALUATION OF'WORK: 5.001- 50,000 $ V.00+.009 50,001- 100,000 $ 127.00+.007 PER $ Z OO' Q Z 100,001- 500,000 500,000+ $ 327.00+.005 DOLLAR $ 1, 327.00+ 003 VALUATION a , [ $_ ' % 7 y . . EACH TRADE V. MISCELLANEOUS IRRIGATION SYSTEMS $ 37.00 MOBILE HOME SERVICE $ 37.00 TEMPORARY POLE SERVICE $ 37.00 SWIMMING POOLS $ 37.00 SIGN ELECTRIC $ 37.00 $ CITY OF GRAPEV 62005...• `MECHANICAL_ ELECTRICAL PLUMBING MAY PERMIT FEES (PLEASE PRINT) PERMIT # BUILDING AREA BLDG. PERM AMOUNT DUE DATE: JOB ADDRESS: DESCRIPTION OF WORK: EACH TRADE I. R -3 PROPERTY OWNER: 1- 749 CONTRACTING COMPANY4 � jf SINGLE FAMILY, DUPLEX 750- 1,199 \ `ir✓C- L L- i li ADDRESS: TOWNHOUSE, 1,200- 1,500 ADDRESS: f C}NLi-,� NEW CONSTRUCTION & 1,501 - 1.750 --< < CITYISTATEIZIP: ADDITIONS (PER UNIT) 1,751- 2,000 CITYISTATEMP: ` PHONE NUMBER: 2,001- 2,250 PHONE NUMBER: L Z4_5 TYPE OF OCCUPANCY BUILDING AREA PERMIT FEES AMOUNT DUE ISO FT) EACH TRADE I. R -3 1- 749 $ 33.25 SINGLE FAMILY, DUPLEX 750- 1,199 $ 49.88 TOWNHOUSE, 1,200- 1,500 $ 63.18 NEW CONSTRUCTION & 1,501 - 1.750 $ 76.48 ADDITIONS (PER UNIT) 1,751- 2,000 $ 83.13 2,001- 2,250 $ 89.78 TOTAL SO. FOOT UNDER 2,251- 3,000 $ 96.43 ROOF 3,001- 3,500 $ 103.08 3,501- 4,000 $ 109.73 $ 4,001+ $ 120.37 EACH TRADE II. A. E, I, R -1 1- 500 $ 37.00 HOTELS, APARTMENTS, 501 - 100,000 $ 17.50 +.035 PER DRINKING/DINING, 100,001 -- 500,000 $ 3,500.00 +.03 SQUARE EDUCATIONAL, ASSEMBLY, 500,001 + $15,000.00 +.02 FOOT $ INSTITUTIONAL EACH TRADE III. S. F, H, M, S, U 1- 500 $ 37.00 OFFICE, RETAIL, WHOLESALE, 501- 50,000 $ 32.00+ .O1 PER GARAGES, FACTORIES, 50,001- 100,000 $ 182.00+ .007 SQUARE WORKSHOPS, SERVICE 100,001+ $ 582.00 +.003 FOOT $ STATIONS, WAREHOUSE CONTRACT EACH TRADE VALUATION OF IV. WORK ANY OCCUPANCY GROUP ALTERATIONS, FINISH -OUTS, 0- 500 $ 37.00 SHELL COMPLETIONS 501- 1,500 $ 45.00 1,501- 3,000 $ 57.00 3,001- 5,000 $ 72.00 CONTRACT VALUATION OF'WORK: 5,001- 50,000 $ 27.00+.009 50}001- 100,000 100 001- 500,000 $ 127.00+ .007 PER $ 327.00+ DOLLAR ?�3 ! ` " 500,000+ .005 $ 1,327.00+ .003 VALUATION $ EACH TRADE V. MISCELLANEOUS IRRIGATION SYSTEMS $ 37.00 MOBILE HOME SERVICE $ 37.00 TEMPORARY POLE SERVICE $ 37.00 SWIMMING POOLS $ 37.00 SIGN ELECTRIC $ 37.00 $ L CITY OF GRAPEVINE MECHANICAL ELECTRICAL PLUMBING PERMIT FEES _ (PLEASE PRINTI APR 2 6 2005 PERMIT BLDG. PERMIT # PERMIT FEES DATE: r (SO FT) JOB ADDRESS. I. R -3 / $ 33.25 DESCRIPTION OF WORK,r- 750– 1,199 $ 49.88 TOWNHOUSE, �f-n $ 63.18 NEW CONSTRUCTION & 1,501- 1,750 PROPERTY OWNER CONTFACTJN COMPAN 1,751- 2,000 S 8313 2,D01 - 2,250 $ 89.78 ADDRESS: TOTAL SO FOOT UNDER ADDRESS' S 96.43 ROOF 3,001- 3,500 $ 103.08 CITY/STATE/ZIP $ 109.73 CITYISTATErzi ., 4,001 + S 120.37 /i7.c s V i r / 7 PHONE NUMBER. II. A, E, I, R -1 PHONE NUMBER 1- 500 %,2 d- ,fQ HOTELS, APARTMENTS, TYPE OF OCCUPANCY BUILDING AREA PERMIT FEES AMOUNT DUE (SO FT) EACH TRADE I. R -3 1- 749 $ 33.25 SINGLE FAMILY, DUPLEX 750– 1,199 $ 49.88 TOWNHOUSE, 1,200 - 1,500 $ 63.18 NEW CONSTRUCTION & 1,501- 1,750 $ 76.48 ADD71ONS (PER UNIT) 1,751- 2,000 S 8313 2,D01 - 2,250 $ 89.78 TOTAL SO FOOT UNDER 2,251- 3,000 S 96.43 ROOF 3,001- 3,500 $ 103.08 3,501- 4.000 $ 109.73 $ 4,001 + S 120.37 EACH TRADE_ II. A, E, I, R -1 1- 500 $ 37.00 HOTELS, APARTMENTS, 501 — 100,000 $ 17.50 +.035 PER DRINKINGIDIN(NG, 100,001 – 500,000 $ 3,500.00 +.03 SQUARE EDUCATIONAL, ASSEMBLY, 500,001+ $15,000.00 +.02 FOOT $ INSTITUTIONAL EACH TRADE III. B, F. H, M, S, U 1 - 500 S 37.00 OFFICE, RETAIL, WHOLESALE, 501- 50,000 $ 32.00+ .01 PER GARAGES, FACTORIES, 50,001- 100,000 $ 182.00+ 007 SQUARE WORKSHOPS, SERVICE 100,001+ $ 582.00+.003 FOOT $ STATIONS, WAREHOUSE CONTRACT EACH TRADE VALUATION OF IV. WORK ANY OCCUPANCY GROUP ALTERATIONS, FINISH -OUTS, 0- 300 S 37.00 SHELL COMPLETIONS 501- 1,500 S 45.00 1,501- 3,000 $ 57.00 3,001- 5,000 $ 72.00 CONTRACT VALUATION OF WORK: 5,001- 50.000 5 27.00+ .009 50,001- 100,000 $ 127.00+.007 PER 100,001 - 500, DOD S 327.00+ .005 DOLLAR y' $� 500,000+ $ 1,327.00+ .003 VALUATION $ O4 • EACH TRADE V. MISCELLANEOUS IRRIGATION SYSTEMS $ 37.00 MOBILE HOME SERVICE $ 37.00 TEMPORARY POLE SERVICE $ 37.00 SWIMMING POOLS $ 37.00 SIGN ELECTRIC $ 37.00 $ Mechanical Compliance Certificate 2003 IECC COMcheck -EZ So$ware Version 3.0 Release la Data filename: Untitled.cck Section 1: Project Information Project Name: ASSOCIATED GLOBAL 1200 MINTERS CHAPEL RD., SUITE 500 GRAPEVINE, TEXAS Designer /Contractor. METRO MECHANICAL, INC. 504 S, BRYAN- BELTLINE, SUITE 102 MESQUITE, TEXAS 75149 Document Author. GARRY W. HAWES Section 2: General Information Building Location (for weather data): Grapevine, Texas CIimate Zone: 5b Heating Degree Days (base 65 degrees F): 2683 Cooling Degree Days (base 65 degrees F): 2328 Project Type: New Construction Section 3: Mechanical Systems List Permit Number Checked By/Date Quantity 5y5imJ=e & Description n 1 HVAC System 1: Heating: Central Furnace, Gas / Cooling: Rooftop Package Unit, Capacity <65 kBtu/h, Air - Cooled Condenser/ Single Zone 1 HVAC System 2: Heating: Central Furnace, Gas / Cooling: Rooftop Package Unit, Capacity > =65 - <90 kBtu/h, Air - Cooled Condenser / Single Zone 1 HVAC System 3: Heating: Central Furnace, Gas/ Cooling: Rooftop Package Unit, Capacity > =90 - <135 kBtu/h, Air - Cooled Condenser/ Single Zone Section 4: Requirements Checklist Bldg. Dept, Use J Requirements Specific To: HVAC System I [ ] J 1. Newly purchased heating equipment meets the heating efficiency requirements [ ] j 2. Equipment minimum efficiency: Rooftop Package Unit; 9.7 SEER J Requirements Specific To: HVAC System 2 [ ] 1. Newly purchased heating equipment meets the heating efficiency requirements ] I 2. Equipment minimum efficiency: Rooffop Package Unit: 10.1 EER I Requirements Spedfic To: HVAC System 3 ] I 1. Newly purchased heating equipment meets the heating efficiency requirements ] I 2. Equipment minimum efficiency: Rooffop Package Unit: 10.1 EER I • Generic Requirements: Must be met by all systems to which the requirement is applicable ] I 1. Load calculations per 1997 ASHRAE Fundamentals ] f 2. Plant equipment and system capacity no greater than needed to meet loads j - Exception: Standby equipment automatically offwhen primary system is operating - Exception: Multiple units controlled to sequence operation as a function of load ] I 3. Minimum one temperature control device per system ] I 4. Minimum one humidity control device per installed humidification/dehumidi5cation system ] J 5. Thermostatic controls has 5 deg. F deadband - Exception: Thermostats requiring manual changeover between heating and cooling ] I 6. Automatic Controls: Setback to 55 deg. F (heat) and 85 deg. F (cool); 7-day clock, 2 -hour occupant override, 10 -hour backup j - Exception: Continuously operating zones j - Exception: 2 kW demand or less, submit calculations ] I 7. Automatic shut- off'dampers on exhaust systems and supply systems with airflow X3,000 cfm ] I 8. Outside -air source for ventilation; system capable of reducing OSA to required minimum ] I 9. R -5 supply and return air duct insulation in unconditioned spaces R -8 supply and return air duct insulation outside the building J R -8 insulation between ducts and the building exterior when ducts are part of building assembly - Exception: Ducts located within equipment - Exception: Ducts with interior and exterior temperature difrenee not exceeding 15 deg. F. J 10. Ducts sealed - longitudinal seams on rigid ducts; transverse seams on all ducts; UL 181A or 181E tapes and mastics J - Exception: Continuously welded and locking -type longitudinal joints and seams on ducts operating at static pressures less than 2 inches w.g. pressure classification J 11. Mechanical fasteners and sealants used to connect ducts and air distribution equipment J 12. Operation and maintenance manual provided to building owner I 13. Balancing devices provided in accordance with IMC 603.15 I 14. Stair and elevator shall vents are equipped with motorized dampers Section S: Compliance Statement The proposed mechanical design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2003 IECC requirements in COMcheck -EZ Version 3.0 Release la and to comply with the mandatory requirements in the Requirements Checklist. Principal gechanical Designer -Name gn Date Mechanical Requirements Description 2003 IECC COMeheck - -EZ Sofware Version 3.0 Release la Data filename: Untitled.cck The following list provides more detailed description ofthe requirements in Section 4 ofthe Mechanical Compliance Certificate. Requirements Specific To: HVAC System 1 1. The specified heating equipment is covered by Federal minimum efficiency requirements. New equipment of this type can be assumed to meet or exceed ASHRAE 90.1 Code requirements for equipment efficiency. 2. The specified heating and/or cooling equipment is covered by ASHRAE 90.1 Code and must meet the following minimum efficiency: Rooftop Package Unit: 9.7 SEER Requirements Specific To: HVAC System 2 I. The specified heating equipment is covered by Federal minimum efficiency requirements. New equipment ofthis type can be assumed to meet or exceed ASHRAE 90.1 Code requirements for equipment efficiency. 2. The specified heating and /or cooling equipment is covered by ASHRAE 90.1 Code and must meet the fallowing minimum efficiency: Rooftop Package Unit: 10.1 EER Requirements Specific To: HVAC System 3 1. The specified heating equipment is covered by Federal minimum efficiency requirements. New equipment of this type can be assumed to meet or exceed ASHRAE 90.1 Code requirements for equipment efficiency. 2. The specified heating and/or cooling equipment is covered by ASHRAE 90.1 Code and must meet the fallowing minimum efficiency: Roofop Package Unit: 10.1 EER Generic Requirements: Must be met by all systems to which the requirement is applicable 1. Design heating and cooling loads for the building must be determined using procedures equivalent to those in Chapters 27 and 28 of the ASHRAE Handbook of Fundamentals or an approved equivalent calculation procedure. 2. All equipment and systems must be sized to be no greater than needed to meet calculated loads. A single piece of equipment providing both heating and cooling trust satisfy this provision far one function with the capacity for the other function as small as possible, within available equipment options. - Exception: The equipment and/or system capacity may be greater than calculated loads for standby purposes. Standby equipment must be automatically controlled to be of when the primary equipment and/or system is operating. - Exception: Multiple units of the same equipment type whose combined capacities exceed the calculated load are allowed if they are provided with controls to sequence operation of the units as the load increases or decreases. 3. Each heating or cooling system serving a single zone must have its own temperature control device. 4. Each humidification system must have its own humidity control device. 5. Thermostats controlling both heating and cooling must be capable of maintaining a 5 degree F deadband (a range of temperature where no heating or cooling is provided). -Exception: Deadband capability is not required if the thermostat does not have automatic changeover capability between heating and cooling. 6. The system or zone control must be a programmable thermostat or other automatic control meeting the fallowing criteria:a) capable of setting back temperature to 55 degree F during heating and setting up to 85 degree F during eoolingb) capable of automatically setting back or shutting down systems during unoccupied hours using 7 different day schedulese) have an accessible 2 -hour occupant overrided) have a battery back -up capable of maintaining programmed settings fur at least 10 hours without power. - Exception: A setback or shutoff control is not required on thermostats that control systems serving areas that operate continuously. - Exception: A setback or shutoffcontrol is not required on systems with total energy demand of kW (6,826 Btu/h) or less. 7. Outdoor -air supply systems with design airflow rates X3,000 cfirn ofoutdoor air and all exhaust systems must have dampers that are automatically closed while the equipment is not operating. 8. The system must supply outside ventilation air as required by Chapter 4 of the International Mechanical Code. If the ventilation system is designed to supply outdoor -air quantities exceeding minimum required levels, the system must be capable of reducing outdoor -air tow to the minimum required levels. 9. Air ducts must be insulated to the fallowing levels:a) Supply and return air ducts for conditioned air located in unconditioned spaces (spaces neither heated nor cooled) must be insulated with a minimum ofR -5. Unconditioned spaces include attics, crawl spaces, unheated basements, and unheated garages.b) Supply and return air ducts and plenums must be insulated to a minimum of R-8 when located outside the building.c) When ducts are located within exterior components (e.g., ffoors or roofs), minimum R -8 insulation is required only between the duct and the building exterior. - Exception: Duct insulation is not required on duds located within equipment. - Exception: Dud insulation is not required when the design temperature difference between the interior and exterior of the duct or plenum does not exceed 15 degree F. 10. All joints, longitudinal and transverse seams, and connections in ductwork must be securely sealed using weldments; mechanical fasteners with seals, gaskets, or mastics; mesh and mastic sealing systems; or tapes. Tapes and mastics must be listed and labeled in accordance with UL 181A or UL 181B. - Exception: Continuously welded and locking -type longitudinal joints and seams on ducts operating at static pressures less than 2 inches w.g. pressure classification. 11. Mechanical fasteners and seals, mastics, or gaskets must be used when connecting duds to fans and other air distribution equipment, including multiple -zone terminal units. 12. Operation and maintenance documentation must be provided to the owner that includes at least the fntlowing information:a) equipment capacity (input and output) and required maintenance actionsb) equipment operation and maintenance manualsc) HVAC system control maintenance and calibration information, including wiring diagrams, schematics, and control sequence descriptions; desired or field - determined set points must be permanently recorded on control drawings, at control devices, or, far digital control systems, in programming commentsd) complete narrative of how each system is intended to operate. 13. Each supply air outlet or difluser and each zone terminal device (such as VAV or mixing box) must have its own balancing device. Acceptable balancing devices include adjustable dampers located within the ductwork, terminal devices, and supply air ditlusers. 14. Stair and elevator shag vents must be equipped with motorized dampers capable ofbeing automatically closed during normal building operation and interlocked to open as required by fire and smoke detection systems. All gravity outdoor air supply and exhaust hoods, vents, and ventilators must be equipped with motorized dampers that will automatically shut when the spaces served are not in use. Exceptions: - Gravity (non - motorized) dampers are acceptable in buildings less than three stories in height above grade. - Ventilation systems serving unconditioned spaces.