HomeMy WebLinkAboutIA2005-0962 (2)1!)� rT B d S
JOB ADDRESS:
LOT:
APR 14 2005
1)11 (!E I•,� �`,r t
PERMIT #:�D'y(v
BUILDING PERMIT APPLICATION
PLEASE PRLYT
0C9 f ��I 0
BLOCK: I SUBDIVISION:
BUILDING CONTRACTOR (company name):
CURRENT MAILING ADDRESS:
CITY /STATE /ZIP:
PROPERTY OWNER: ,.`7Tr !' ""'
CURRENT MAILING ADDRESS:
�S� riv
A �.a 6,- r1� Ale C1
NUMBER: �rS1x X2
CITY /STATE/ZIP: PHONE NUMBER:
dr
PROJECT VALUE:
Cy O J
DESCRIPTION OF WORK TO BE DONE:
USE OF BUILDING OR STRUCTURE:
NAME OF BUSINESS.- x,SO Cr�/e
)FIRE SPRINKLERED? YES /I NO
Gr✓-�.
d�
** Total Square Footage under roof: �`� Square Footage of alteration/addition:
Qf�I hereby certify that plans have been reviewed and the building will be inspected by a certified energy code Inspector in accordance with
State Law. Plan review and inspection documentation shall be made available to the Building Department ( required for new bulldings,
alterations and additions)
D I hereby certify that, Dllaans a` en submitted U t4he Texas Department of Licensing and Regulation for Accessibility Review.
Control Number: 9 (Not required for I & 2 family dwellings)
"FOR DEMOLITIONS, ADDITIONS AND OR ALTERATION TO COMMERCIAL AND PUBLIC BUILDINGS
D ]hereby certify that an asbestos survey has been conducted for this structure In accordance with the regulatory requirements of the Texas
Department of Health.
I hereby certify that the foregoing is correct to the best of my knowledge and all work will be performed according to the documents approved by
the Building Department and In compliance with the City Of Grapevine Ordinance regulating construction. It is understood that the Issuance of
this permit does not grant or authorize any violation of any code or ordinance of the City Of Grapevine. I FURTHERMORE UNDERSTAND
THAT PLANS AND SPECIFICATIONS ARE NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY, AND THAT THE
DESIGN PROFESSIONAUOWNER IS RESPONSIBLE FOR OBTAINING SUCH APPROVAL FROM THE APPROPRIATE STATE AND
OR FEDERAL AGENCY(S).
PRINT NAME:. z SIGNATURE:
THE FOLLOWING IS TO E COMPLETED BY THE BUILD
G INSPECTION DEPARTME
Construction T e:
Permit Valuation: $ 0
Setbacks
App roval to Issue
Occu pancy Group:
Front:
Electrical
Division:
Building Width:
Left:
Plumbing
Zoning: L
Bwildin D the
Right:
Mechanical
Rear:
Plan Review Approval:
Date: S
Water Availability Rate:
Site Plan A roval:
Date:
Sewer Availability Rate:
ire D artment:
M Date: p
Building Permit Fee:
-Public Works D artment:
Date:
Plan Review Fee:
c5lealth Department:
Date:
Lot Drainage Fee:
pproved for Permit:
Date:
Total Fees:
Lot Drainage Submitted:
proved: Ah
yj Q 5
1 Total Amount Due:
P.O. BOX 45104, GRAPEVINE. TX 76099 (817) 410 -3165 w / I O :FORMIBUILDING .APP -1 17/02— Rev.11 /14!04
CITY OF GRAPEVINE
MECHANICAL ELECTRICAL PLUMBING��
PERMIT FEES
ms`-µ (PLEASE PRINT) - -- ❑PR 9 Q ` nn;
PERM1Tli
13LDG,PERIVIfT#
PERMIT FEES
DATE:
JOB ADDRESS'
DESCRIPTION OF WORK:
UI� 6► N o f �
.ice �'Nf,% C3 t%
PROPERTY OWNER.
CONTRA
ADDRESS:
ADD ES�
1 - 749
CITYlSTATE2IP:
C 1STATE2IP:
750- 1,199
PRONE NUMBER:
PHO_N U B
1,200- 1,500
TYPE OF OCCUPANCY
BUILDING AREA
PERMIT FEES
AMOUNT DUE
(SO FT)
EACH TRADE
I. R -3
1 - 749
$ 33.25
SINGLE FAMILY, DUPLEX
750- 1,199
$ 49.88
TOWNHOUSE,
1,200- 1,500
$ 53.18
NEW CONSTRUCTION &
1,501- 1,750
$ 78.48
ADDITIONS (PER UNIT)
1,751- 2,000
$ 83.13
2,001- 2,250
$ 89.78
TOTAL SQ. FOOT UNDER
2,251- 3,000
$ 98.43
ROOF
3,001- 3,504
$ 103.08
3,501- 4,000
$ 109.73
$
4,001+
$ 120.37
EACH TRADE
11. A, E, I, R -1
1- 500
$ 37.00
HOTELS, APARTMENTS,
501 - 100,000
$ 17.50 +.035 PER
DRINKING/DINING,
100,001 - 500,000
$ 3,500.00 +.03 SQUARE
EDUCATIONAL, ASSEMBLY,
500,001 +
$15,000.00 +.02 FOOT
$
INSTITUTIONAL
EACH TRADE
III. B, F, H, M,S,U
1- 500
$ 37.00
OFFICE, RETAIL, WHOLESALE,
501- 50,000
$ 32.00+.01 PER
GARAGES, FACTORIES,
50,001- 100,000
$ 182.00 +.007 SQUARE
WORKSHOPS, SERVICE
100,001+
$ 582.00+ .003 FOOT
$
STATIONS, WAREHOUSE
CONTRACT
EACH TRADE
VALUATION OF
IV.
WORK
ANY OCCUPANCY GROUP
ALTERATIONS, FINISH -OUTS,
0- 500
$ 37.00
SHELL COMPLETIONS
501- 1,500
$ 45.00
1,501- 3,000
$ 57.00
3,001- 5,000
$ 72.00
CONTRACT VALUATION OF'WORK:
5.001- 50,000
$ V.00+.009
50,001- 100,000
$ 127.00+.007 PER
$ Z OO' Q
Z
100,001- 500,000
500,000+
$ 327.00+.005 DOLLAR
$ 1, 327.00+ 003 VALUATION
a , [
$_ ' % 7 y
.
.
EACH TRADE
V. MISCELLANEOUS
IRRIGATION SYSTEMS
$ 37.00
MOBILE HOME SERVICE
$ 37.00
TEMPORARY POLE SERVICE
$ 37.00
SWIMMING POOLS
$ 37.00
SIGN ELECTRIC
$ 37.00
$
CITY OF GRAPEV
62005...• `MECHANICAL_ ELECTRICAL PLUMBING
MAY PERMIT FEES
(PLEASE PRINT)
PERMIT #
BUILDING AREA
BLDG. PERM
AMOUNT DUE
DATE:
JOB ADDRESS:
DESCRIPTION OF WORK:
EACH TRADE
I. R -3
PROPERTY OWNER:
1- 749
CONTRACTING COMPANY4 � jf
SINGLE FAMILY, DUPLEX
750- 1,199
\ `ir✓C- L L- i li
ADDRESS:
TOWNHOUSE,
1,200- 1,500
ADDRESS: f
C}NLi-,�
NEW CONSTRUCTION &
1,501 - 1.750
--< <
CITYISTATEIZIP:
ADDITIONS (PER UNIT)
1,751- 2,000
CITYISTATEMP: `
PHONE NUMBER:
2,001- 2,250
PHONE NUMBER: L Z4_5
TYPE OF OCCUPANCY
BUILDING AREA
PERMIT FEES
AMOUNT DUE
ISO FT)
EACH TRADE
I. R -3
1- 749
$ 33.25
SINGLE FAMILY, DUPLEX
750- 1,199
$ 49.88
TOWNHOUSE,
1,200- 1,500
$ 63.18
NEW CONSTRUCTION &
1,501 - 1.750
$ 76.48
ADDITIONS (PER UNIT)
1,751- 2,000
$ 83.13
2,001- 2,250
$ 89.78
TOTAL SO. FOOT UNDER
2,251- 3,000
$ 96.43
ROOF
3,001- 3,500
$ 103.08
3,501- 4,000
$ 109.73
$
4,001+
$ 120.37
EACH TRADE
II. A. E, I, R -1
1- 500
$ 37.00
HOTELS, APARTMENTS,
501 - 100,000
$ 17.50 +.035 PER
DRINKING/DINING,
100,001 -- 500,000
$ 3,500.00 +.03 SQUARE
EDUCATIONAL, ASSEMBLY,
500,001 +
$15,000.00 +.02 FOOT
$
INSTITUTIONAL
EACH TRADE
III. S. F, H, M, S, U
1- 500
$ 37.00
OFFICE, RETAIL, WHOLESALE,
501- 50,000
$ 32.00+ .O1 PER
GARAGES, FACTORIES,
50,001- 100,000
$ 182.00+ .007 SQUARE
WORKSHOPS, SERVICE
100,001+
$ 582.00 +.003 FOOT
$
STATIONS, WAREHOUSE
CONTRACT
EACH TRADE
VALUATION OF
IV.
WORK
ANY OCCUPANCY GROUP
ALTERATIONS, FINISH -OUTS,
0- 500
$ 37.00
SHELL COMPLETIONS
501- 1,500
$ 45.00
1,501- 3,000
$ 57.00
3,001- 5,000
$ 72.00
CONTRACT VALUATION OF'WORK:
5,001- 50,000
$ 27.00+.009
50}001- 100,000
100 001- 500,000
$ 127.00+ .007 PER
$ 327.00+ DOLLAR
?�3 ! `
"
500,000+
.005
$ 1,327.00+ .003 VALUATION
$
EACH TRADE
V. MISCELLANEOUS
IRRIGATION SYSTEMS
$ 37.00
MOBILE HOME SERVICE
$ 37.00
TEMPORARY POLE SERVICE
$ 37.00
SWIMMING POOLS
$ 37.00
SIGN ELECTRIC
$ 37.00
$
L
CITY OF GRAPEVINE
MECHANICAL ELECTRICAL PLUMBING
PERMIT FEES _
(PLEASE PRINTI APR 2 6 2005
PERMIT
BLDG. PERMIT #
PERMIT FEES
DATE:
r
(SO FT)
JOB ADDRESS.
I. R -3
/
$ 33.25
DESCRIPTION OF WORK,r-
750– 1,199
$ 49.88
TOWNHOUSE,
�f-n
$ 63.18
NEW CONSTRUCTION &
1,501- 1,750
PROPERTY OWNER
CONTFACTJN COMPAN
1,751- 2,000
S 8313
2,D01 - 2,250
$ 89.78
ADDRESS:
TOTAL SO FOOT UNDER
ADDRESS'
S 96.43
ROOF
3,001- 3,500
$ 103.08
CITY/STATE/ZIP
$ 109.73
CITYISTATErzi .,
4,001 +
S 120.37
/i7.c s V i
r
/
7
PHONE NUMBER.
II. A, E, I, R -1
PHONE NUMBER
1- 500
%,2 d-
,fQ
HOTELS, APARTMENTS,
TYPE OF OCCUPANCY
BUILDING AREA
PERMIT FEES
AMOUNT DUE
(SO FT)
EACH TRADE
I. R -3
1- 749
$ 33.25
SINGLE FAMILY, DUPLEX
750– 1,199
$ 49.88
TOWNHOUSE,
1,200 - 1,500
$ 63.18
NEW CONSTRUCTION &
1,501- 1,750
$ 76.48
ADD71ONS (PER UNIT)
1,751- 2,000
S 8313
2,D01 - 2,250
$ 89.78
TOTAL SO FOOT UNDER
2,251- 3,000
S 96.43
ROOF
3,001- 3,500
$ 103.08
3,501- 4.000
$ 109.73
$
4,001 +
S 120.37
EACH TRADE_
II. A, E, I, R -1
1- 500
$ 37.00
HOTELS, APARTMENTS,
501 — 100,000
$ 17.50 +.035 PER
DRINKINGIDIN(NG,
100,001 – 500,000
$ 3,500.00 +.03 SQUARE
EDUCATIONAL, ASSEMBLY,
500,001+
$15,000.00 +.02 FOOT
$
INSTITUTIONAL
EACH TRADE
III. B, F. H, M, S, U
1 - 500
S 37.00
OFFICE, RETAIL, WHOLESALE,
501- 50,000
$ 32.00+ .01 PER
GARAGES, FACTORIES,
50,001- 100,000
$ 182.00+ 007 SQUARE
WORKSHOPS, SERVICE
100,001+
$ 582.00+.003 FOOT
$
STATIONS, WAREHOUSE
CONTRACT
EACH TRADE
VALUATION OF
IV.
WORK
ANY OCCUPANCY GROUP
ALTERATIONS, FINISH -OUTS,
0- 300
S 37.00
SHELL COMPLETIONS
501- 1,500
S 45.00
1,501- 3,000
$ 57.00
3,001- 5,000
$ 72.00
CONTRACT VALUATION OF WORK:
5,001- 50.000
5 27.00+ .009
50,001- 100,000
$ 127.00+.007 PER
100,001 - 500, DOD
S 327.00+ .005 DOLLAR
y'
$�
500,000+
$ 1,327.00+ .003 VALUATION
$ O4 •
EACH TRADE
V. MISCELLANEOUS
IRRIGATION SYSTEMS
$ 37.00
MOBILE HOME SERVICE
$ 37.00
TEMPORARY POLE SERVICE
$ 37.00
SWIMMING POOLS
$ 37.00
SIGN ELECTRIC
$ 37.00
$
Mechanical Compliance Certificate
2003 IECC
COMcheck -EZ So$ware Version 3.0 Release la
Data filename: Untitled.cck
Section 1: Project Information
Project Name: ASSOCIATED GLOBAL
1200 MINTERS CHAPEL RD., SUITE 500
GRAPEVINE, TEXAS
Designer /Contractor. METRO MECHANICAL, INC.
504 S, BRYAN- BELTLINE, SUITE 102
MESQUITE, TEXAS 75149
Document Author. GARRY W. HAWES
Section 2: General Information
Building Location (for weather data):
Grapevine, Texas
CIimate Zone:
5b
Heating Degree Days (base 65 degrees F):
2683
Cooling Degree Days (base 65 degrees F):
2328
Project Type:
New Construction
Section 3: Mechanical Systems List
Permit Number
Checked By/Date
Quantity 5y5imJ=e & Description
n
1 HVAC System 1: Heating: Central Furnace, Gas / Cooling: Rooftop Package Unit, Capacity <65 kBtu/h,
Air - Cooled Condenser/ Single Zone
1 HVAC System 2: Heating: Central Furnace, Gas / Cooling: Rooftop Package Unit, Capacity > =65 - <90
kBtu/h, Air - Cooled Condenser / Single Zone
1 HVAC System 3: Heating: Central Furnace, Gas/ Cooling: Rooftop Package Unit, Capacity > =90 - <135
kBtu/h, Air - Cooled Condenser/ Single Zone
Section 4: Requirements Checklist
Bldg.
Dept,
Use
J Requirements Specific To: HVAC System I
[ ] J 1. Newly purchased heating equipment meets the heating efficiency requirements
[ ] j 2. Equipment minimum efficiency:
Rooftop Package Unit; 9.7 SEER
J
Requirements Specific To: HVAC System 2
[ ] 1. Newly purchased heating equipment meets the heating efficiency requirements
] I 2. Equipment minimum efficiency:
Rooffop Package Unit: 10.1 EER
I
Requirements Spedfic To: HVAC System 3
] I 1. Newly purchased heating equipment meets the heating efficiency requirements
] I 2. Equipment minimum efficiency:
Rooffop Package Unit: 10.1 EER
I •
Generic Requirements: Must be met by all systems to which the requirement is applicable
] I 1. Load calculations per 1997 ASHRAE Fundamentals
] f 2. Plant equipment and system capacity no greater than needed to meet loads
j - Exception: Standby equipment automatically offwhen primary system is operating
- Exception: Multiple units controlled to sequence operation as a function of load
] I 3. Minimum one temperature control device per system
] I 4. Minimum one humidity control device per installed humidification/dehumidi5cation system
] J 5. Thermostatic controls has 5 deg. F deadband
- Exception: Thermostats requiring manual changeover between heating and cooling
] I 6. Automatic Controls: Setback to 55 deg. F (heat) and 85 deg. F (cool); 7-day clock,
2 -hour occupant override, 10 -hour backup
j - Exception: Continuously operating zones
j - Exception: 2 kW demand or less, submit calculations
] I 7. Automatic shut- off'dampers on exhaust systems and supply systems with airflow X3,000 cfm
] I 8. Outside -air source for ventilation; system capable of reducing OSA to required minimum
] I 9. R -5 supply and return air duct insulation in unconditioned spaces
R -8 supply and return air duct insulation outside the building
J R -8 insulation between ducts and the building exterior when ducts are part of building assembly
- Exception: Ducts located within equipment
- Exception: Ducts with interior and exterior temperature difrenee not exceeding 15 deg. F.
J 10. Ducts sealed - longitudinal seams on rigid ducts; transverse seams on all ducts;
UL 181A or 181E tapes and mastics
J - Exception: Continuously welded and locking -type longitudinal joints and seams on ducts
operating at static pressures less than 2 inches w.g. pressure classification
J 11. Mechanical fasteners and sealants used to connect ducts and air distribution equipment
J 12. Operation and maintenance manual provided to building owner
I 13. Balancing devices provided in accordance with IMC 603.15
I 14. Stair and elevator shall vents are equipped with motorized dampers
Section S: Compliance Statement
The proposed mechanical design represented in this document is consistent with the building plans, specifications and
other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet
the 2003 IECC requirements in COMcheck -EZ Version 3.0 Release la and to comply with the mandatory requirements in
the Requirements Checklist.
Principal gechanical Designer -Name gn Date
Mechanical Requirements Description
2003 IECC
COMeheck - -EZ Sofware Version 3.0 Release la
Data filename: Untitled.cck
The following list provides more detailed description ofthe requirements in Section 4 ofthe Mechanical Compliance
Certificate.
Requirements Specific To: HVAC System 1
1. The specified heating equipment is covered by Federal minimum efficiency requirements. New equipment of this type
can be assumed to meet or exceed ASHRAE 90.1 Code requirements for equipment efficiency.
2. The specified heating and/or cooling equipment is covered by ASHRAE 90.1 Code and must meet the following
minimum efficiency: Rooftop Package Unit: 9.7 SEER
Requirements Specific To: HVAC System 2
I. The specified heating equipment is covered by Federal minimum efficiency requirements. New equipment ofthis type
can be assumed to meet or exceed ASHRAE 90.1 Code requirements for equipment efficiency.
2. The specified heating and /or cooling equipment is covered by ASHRAE 90.1 Code and must meet the fallowing
minimum efficiency: Rooftop Package Unit: 10.1 EER
Requirements Specific To: HVAC System 3
1. The specified heating equipment is covered by Federal minimum efficiency requirements. New equipment of this type
can be assumed to meet or exceed ASHRAE 90.1 Code requirements for equipment efficiency.
2. The specified heating and/or cooling equipment is covered by ASHRAE 90.1 Code and must meet the fallowing
minimum efficiency: Roofop Package Unit: 10.1 EER
Generic Requirements: Must be met by all systems to which the requirement is applicable
1. Design heating and cooling loads for the building must be determined using procedures equivalent to those in
Chapters 27 and 28 of the ASHRAE Handbook of Fundamentals or an approved equivalent calculation procedure.
2. All equipment and systems must be sized to be no greater than needed to meet calculated loads. A single piece of
equipment providing both heating and cooling trust satisfy this provision far one function with the capacity for the
other function as small as possible, within available equipment options.
- Exception: The equipment and/or system capacity may be greater than calculated loads for standby purposes.
Standby equipment must be automatically controlled to be of when the primary equipment and/or system is operating.
- Exception: Multiple units of the same equipment type whose combined capacities exceed the calculated load are
allowed if they are provided with controls to sequence operation of the units as the load increases or decreases.
3. Each heating or cooling system serving a single zone must have its own temperature control device.
4. Each humidification system must have its own humidity control device.
5. Thermostats controlling both heating and cooling must be capable of maintaining a 5 degree F deadband (a range of
temperature where no heating or cooling is provided).
-Exception: Deadband capability is not required if the thermostat does not have automatic changeover capability
between heating and cooling.
6. The system or zone control must be a programmable thermostat or other automatic control meeting the fallowing
criteria:a) capable of setting back temperature to 55 degree F during heating and setting up to 85 degree F during
eoolingb) capable of automatically setting back or shutting down systems during unoccupied hours using 7 different
day schedulese) have an accessible 2 -hour occupant overrided) have a battery back -up capable of maintaining
programmed settings fur at least 10 hours without power.
- Exception: A setback or shutoff control is not required on thermostats that control systems serving areas that operate
continuously.
- Exception: A setback or shutoffcontrol is not required on systems with total energy demand of kW (6,826 Btu/h)
or less.
7. Outdoor -air supply systems with design airflow rates X3,000 cfirn ofoutdoor air and all exhaust systems must have
dampers that are automatically closed while the equipment is not operating.
8. The system must supply outside ventilation air as required by Chapter 4 of the International Mechanical Code. If the
ventilation system is designed to supply outdoor -air quantities exceeding minimum required levels, the system must
be capable of reducing outdoor -air tow to the minimum required levels.
9. Air ducts must be insulated to the fallowing levels:a) Supply and return air ducts for conditioned air located in
unconditioned spaces (spaces neither heated nor cooled) must be insulated with a minimum ofR -5. Unconditioned
spaces include attics, crawl spaces, unheated basements, and unheated garages.b) Supply and return air ducts and
plenums must be insulated to a minimum of R-8 when located outside the building.c) When ducts are located within
exterior components (e.g., ffoors or roofs), minimum R -8 insulation is required only between the duct and the
building exterior.
- Exception: Duct insulation is not required on duds located within equipment.
- Exception: Dud insulation is not required when the design temperature difference between the interior and exterior of
the duct or plenum does not exceed 15 degree F.
10. All joints, longitudinal and transverse seams, and connections in ductwork must be securely sealed using weldments;
mechanical fasteners with seals, gaskets, or mastics; mesh and mastic sealing systems; or tapes. Tapes and mastics
must be listed and labeled in accordance with UL 181A or UL 181B.
- Exception: Continuously welded and locking -type longitudinal joints and seams on ducts operating at static
pressures less than 2 inches w.g. pressure classification.
11. Mechanical fasteners and seals, mastics, or gaskets must be used when connecting duds to fans and other air
distribution equipment, including multiple -zone terminal units.
12. Operation and maintenance documentation must be provided to the owner that includes at least the fntlowing
information:a) equipment capacity (input and output) and required maintenance actionsb) equipment operation and
maintenance manualsc) HVAC system control maintenance and calibration information, including wiring diagrams,
schematics, and control sequence descriptions; desired or field - determined set points must be permanently recorded on
control drawings, at control devices, or, far digital control systems, in programming commentsd) complete narrative
of how each system is intended to operate.
13. Each supply air outlet or difluser and each zone terminal device (such as VAV or mixing box) must have its own
balancing device. Acceptable balancing devices include adjustable dampers located within the ductwork, terminal
devices, and supply air ditlusers.
14. Stair and elevator shag vents must be equipped with motorized dampers capable ofbeing automatically closed during
normal building operation and interlocked to open as required by fire and smoke detection systems. All gravity
outdoor air supply and exhaust hoods, vents, and ventilators must be equipped with motorized dampers that will
automatically shut when the spaces served are not in use.
Exceptions:
- Gravity (non - motorized) dampers are acceptable in buildings less than three stories in height above grade.
- Ventilation systems serving unconditioned spaces.