HomeMy WebLinkAbout72818_9079_76-rsteel-apr05 field test report 3642 euless grapvine
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Grapevine Building A
3642 Euless-Grapevine Road
Grapevine, Texas
REPORTED TO: ARCO/Murray
4925 Greenville Ave., Suite 915
Dallas, Texas 75206
ATTN: Mr. Chase Killingsworth
REPORT NO. 76
REPORT DATE: 04-12-24
REG PROJECT NO. 25298
DATE OBSERVED: 04-05-24
TECHNICIAN: J. Espinoza
PAGE: 1 of 1
Items Observed: Slab Lines A to H from 3 to 5
Reference Plans or Notes Used: Sheet S1.00
x There were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
E-Mail
Distribution: (2) ARCO/Murray/
Mr. Chase Killingsworth
Mr. Brice Jones
(1) Pritchard Associates/
Mr. Taylor Wildman
(4) City of Grapevine/
Mr. Daniel Steinshouer
Mr. Phillip Sedivy
Mr. Israel Lozano/
Mrs. Kelly Taft
(2) DFW West Logistics One. LLC/
Mr. Bunker Curnes
Mr. Tom Curnes
Submitted by:
REED ENGINEERING GROUP, LTD.
Registration Number F-3114
Ronald F. Reed, P.E.
BW/mg