Loading...
HomeMy WebLinkAbout72866_9108_84-den-apr18 2424 STUTZ DR.  SUITE 400  DALLAS, TX 75235  TEL [214] 350 5600  FAX [214] 350 0019 REPORT OF FIELD DENSITY TESTS Grapevine Building A 3642 Euless-Grapevine Road Grapevine, Texas REPORTED TO: ARCO/Murray 4925 Greenville Ave., Suite 915 Dallas, Texas 75206 ATTN: Mr. Chase Killingsworth REPORT NO. 84 REPORT DATE: 04-23-24 REG PROJECT NO. 25298 TECHNICIAN: P. Butler PAGE: 1 of 1 Proctor No. ASTM Standard Description Optimum Moisture, % Maximum Density, PCF 1 D-698 Brown & reddish brown sandy clay 18.2 105.8 2 D-698 Reddish brown clay w/gray clay & sand 19.4 103.8 Test No. Date Location Depth Below Final S. G. (feet) Pocket Pen (tsf) Field Density (pcf) Field Moisture (%) Proctor ID Compaction Level (%) 1369 04-18-24 Sanitary Line A: STA 13+50 3.0 2.75 102.4 21.0 1 96.8 1370 Sanitary Line A: STA 13+51 2.0 3.5 103.5 19.6 1 97.9 1371 Sanitary Line A: STA 13+52 1.0 3.75 103.7 19.2 1 98.1 1372 Sanitary Line A: STA 13+53 0.0 3.0 102.6 20.1 1 97.0 1373 Sanitary Line A: STA 15+00 19.0 2.75 102.2 22.3 1 96.6 1374 Sanitary Line A: STA 15+01 18.0 2.5 99.4 23.2 2 95.8 1375 Sanitary Line A: STA 15+02 17.0 3.0 100.7 20.6 2 97.1 1376 Sanitary Line A: STA 15+03 16.0 3.75 101.7 21.1 2 98.0 1377 Sanitary Line A: STA 15+04 15.0 2.75 100.1 22.0 2 96.5 1378 Sanitary Line A: STA 15+05 14.0 2.5 101.6 22.6 1 96.1 1379 Sanitary Line A: STA 15+06 13.0 2.5 101.0 23.1 1 95.5 1380 Sanitary Line A: STA 15+07 12.0 3.25 103.2 19.8 1 97.6 Comments: Where tested, materials were in compliance with project specifications. E-Mail Distribution: (2) ARCO/Murray/ Mr. Chase Killingsworth Mr. Brice Jones (1) Pritchard Associates/ Mr. Taylor Wildman (4) City of Grapevine/ Mr. Daniel Steinshouer Mr. Phillip Sedivy Mr. Israel Lozano/ Mrs. Kelly Taft (2) DFW West Logistics One. LLC/ Mr. Bunker Curnes Mr. Tom Curnes Submitted by: REED ENGINEERING GROUP, LTD. Registration Number F-3114 Bill Woolwine Sr. Manager, CMT BW/mg