HomeMy WebLinkAbout73403_9357_167-cyl-sept06
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019
CONCRETE CYLINDER TEST REPORT
Grapevine Building A
3642 Euless-Grapevine Road
Grapevine, Texas
REPORTED TO: ARCO/Murray
4925 Greenville Ave., Suite 915
Dallas, Texas 75206
ATTN: Mr. Chase Killingsworth
REPORT NO. 167
REG PROJECT NO. 25298
SAMPLE DATE: 09-06-24
TECHNICIAN: E. Munoz
PAGE: 1 of 2
Location of Sample
Set Number Location Quantity Represented (c.y.)
1 Fire Lane: 45’N, 220’E from NE building corner 10/350
2 Fire Lane: 25’N, 180’E from NE building corner 110/350
3 Fire Lane: 5’S, 120’E from NE building corner 210/350
4 Fire Lane: 35’N, 30’E from NE building corner 320/350
Design Information
Source of Concrete Mix Identification Specified Strength (psi) Sample Size
Estrada Ready Mix R4060AEWR 4000 4x8
Test Results
Set
No.
Cylinder
ID
Date
Tested
Age @
Test
Total Load
(lbs.)
Fracture
Type
Compressive
Strength (psi)
Average
Strength (psi)
1 4328 09-03-24 7 52890 3 4210
4328 10-04-24 28
4328 10-04-24 28
4328 10-04-24 28
4328 Hold H
2 4329 09-03-24 7 39900 3 3180
4329 10-04-24 28
4329 10-04-24 28
4329 10-04-24 28
4329 Hold H
3 4330 09-03-24 7 49590 2 3950
4330 10-04-24 28
4330 10-04-24 28
4330 10-04-24 28
4330 Hold H
4 4331 09-03-24 7 52380 2 4170
4331 10-04-24 28
4331 10-04-24 28
4331 10-04-24 28
4331 Hold H
REPORT NO. 167
REG PROJECT NO. 25298
SAMPLE DATE: 09-06-24
PAGE: 2 of 2
Cylinder Data
Set
No.
Cylinder
ID
Slump
(inches)
Time of
Sample
Air
Temp.
(°F)
Concrete
Temp.
(°F)
Air
Entrainment
(%)
Unit
Weight
(lbs/ft3)
Ticket
Number
1 4328 5.0 4:10 AM 75 85 4.9 143.2 3250
2 4329 5.0 5:00 AM 75 85 4.8 142.8 3260
3 4330 5.0 6:10 AM 74 84 4.5 142.0 3270
4 4331 5.5 7:30 AM 74 85 4.8 144.4 3284
Fracture Type
Type 1 Type 2 Type 3 Type 4 Type 5 Type 6
Note: (1) Concrete was sampled in accordance with ASTM C-31
(2) Concrete cylinders were tested in accordance with ASTM C-39
E-Mail
Distribution: (2) ARCO/Murray/
Mr. Chase Killingsworth
Mr. Brice Jones
(2) Pritchard Associates/
Mr. Taylor Wildman
Mr. Azra Spahalic
(4) City of Grapevine/
Mr. Daniel Steinshouer
Mr. Phillip Sedivy
Mr. Israel Lozano/
Mrs. Kelly Taft
(2) DFW West Logistics One. LLC/
Mr. Bunker Curnes
Mr. Tom Curnes
Submitted by:
REED ENGINEERING GROUP, LTD.
Registration Number F-3114
Cary Tipps
Project Manager, CMT
CT/cn