Loading...
HomeMy WebLinkAbout73358_9337_136-cyl-july30 2424 STUTZ DR.  SUITE 400  DALLAS, TX 75235  TEL [214] 350 5600  FAX [214] 350 0019 CONCRETE CYLINDER TEST REPORT Grapevine Building A 3642 Euless-Grapevine Road Grapevine, Texas REPORTED TO: ARCO/Murray 4925 Greenville Ave., Suite 915 Dallas, Texas 75206 ATTN: Mr. Chase Killingsworth REPORT NO. 136 REG PROJECT NO. 25298 SAMPLE DATE: 07-30-24 TECHNICIAN: P. Mendoza PAGE: 1 of 2 Location of Sample Set Number Location Quantity Represented (c.y.) 1 Paving: 50’S, 80’W from NW building corner 20/30 2 Paving: 30’N, 20’E from NW building corner 140/300 3 Paving: 20’N, 100’E from NW building corner 240/300 Design Information Source of Concrete Mix Identification Specified Strength (psi) Sample Size Estrada R4060AEWR 4000 4x8 Test Results Set No. Cylinder ID Date Tested Age @ Test Total Load (lbs.) Fracture Type Compressive Strength (psi) Average Strength (psi) 1 3600 08-06-24 7 70870 2 5640 3600 08-27-24 28 83700 5 6660 3600 08-27-24 28 84970 3 6760 3600 08-27-24 28 78470 3 6250 6560 3600 Hold H 2 3601 08-06-24 7 60360 2 4800 3601 08-27-24 28 77460 3 6160 3601 08-27-24 28 75270 3 5990 3601 08-27-24 28 76430 2 6080 6080 3601 Hold H 3 3602 08-06-24 7 58800 4 4680 3602 08-27-24 28 70010 2 5570 3602 08-27-24 28 73130 3 5820 3602 08-27-24 28 77490 3 6170 5850 3602 Hold H Cylinder Data Set No. Cylinder ID Slump (inches) Time of Sample Air Temp. (°F) Concrete Temp. (°F) Air Entrainment (%) Unit Weight (lbs/ft3) Ticket Number 1 3600 3.5 4:30 AM 73 90 4.5 147.5 2111 2 3601 5.0 7:10 AM 84 93 4.0 147.5 1273 3 3602 5.0 8:15 AM 88 95 4.5 147.3 2133 REPORT NO. 136 REG PROJECT NO. 25298 SAMPLE DATE: 07-30-24 PAGE: 2 of 2 Fracture Type Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 Note: (1) Concrete was sampled in accordance with ASTM C-31 (2) Concrete cylinders were tested in accordance with ASTM C-39 E-Mail Distribution: (2) ARCO/Murray/ Mr. Chase Killingsworth Mr. Brice Jones (2) Pritchard Associates/ Mr. Taylor Wildman Mr. Azra Spahalic (4) City of Grapevine/ Mr. Daniel Steinshouer Mr. Phillip Sedivy Mr. Israel Lozano/ Mrs. Kelly Taft (2) DFW West Logistics One. LLC/ Mr. Bunker Curnes Mr. Tom Curnes Submitted by: REED ENGINEERING GROUP, LTD. Registration Number F-3114 Cary Tipps Project Manager, CMT CT/cn