Loading...
HomeMy WebLinkAbout73377_9347_30-cyl-mar06 2424 STUTZ DR.  SUITE 400  DALLAS, TX 75235  TEL [214] 350 5600  FAX [214] 350 0019 CONCRETE CYLINDER TEST REPORT Grapevine Building A 3642 Euless-Grapevine Road Grapevine, Texas REPORTED TO: ARCO/Murray 4925 Greenville Ave., Suite 915 Dallas, Texas 75206 ATTN: Mr. Chase Killingsworth REPORT NO. 30 REG PROJECT NO. 25298 SAMPLE DATE: 03-06-24 TECHNICIAN: N. Kobzeff PAGE: 1 of 2 Location of Sample Set Number Location Quantity Represented (c.y.) 1 Pier: N-5 10/10 Design Information Source of Concrete Mix Identification Specified Strength (psi) Sample Size Estrada R3050NAWE 3000 4x8 Test Results Set No. Cylinder ID Date Tested Age @ Test Total Load (lbs.) Fracture Type Compressive Strength (psi) Average Strength (psi) 1 1212 03-13-24 7 26040 4 2070 1212 04-03-24 28 35310 4 2810 1212 04-03-24 28 34220 3 2720 1212 04-03-24 28 35600 3 2830 2790 1212 05-01-24 56 42150 2 3360 Cylinder Data Set No. Cylinder ID Slump (inches) Time of Sample Air Temp. (°F) Concrete Temp. (°F) Air Entrainment (%) Unit Weight (lbs/ft3) Ticket Number 1 1212 6.25 10:56 AM 73 70 1.4 145.8 133 Fracture Type Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 Note: (1) Concrete was sampled in accordance with ASTM C-31 (2) Concrete cylinders were tested in accordance with ASTM C-39 REPORT NO. 30 REG PROJECT NO. 25298 SAMPLE DATE: 03-06-24 PAGE: 2 of 2 E-Mail Distribution: (2) ARCO/Murray/ Mr. Chase Killingsworth Mr. Brice Jones (1) Pritchard Associates/ Mr. Taylor Wildman (2) City of Grapevine/ Mr. Daniel Steinshouer Mr. Phillip Sedivy (2) DFW West Logistics One. LLC/ Mr. Bunker Curnes Mr. Tom Curnes Submitted by: REED ENGINEERING GROUP, LTD. Registration Number F-3114 Cary Tipps Project Manager, CMT CT/cn