Loading...
HomeMy WebLinkAbout650241_37801_3642 euless grapevine 29 cylinders 2424 STUTZ DR.  SUITE 400  DALLAS, TX 75235  TEL [214] 350 5600  FAX [214] 350 0019 CONCRETE CYLINDER TEST REPORT Grapevine Building A 3642 Euless-Grapevine Road Grapevine, Texas REPORTED TO: ARCO/Murray 4925 Greenville Ave., Suite 915 Dallas, Texas 75206 ATTN: Mr. Chase Killingsworth REPORT NO. 29 REG PROJECT NO. 25298 SAMPLE DATE: 03-05-24 TECHNICIAN: N. Kobzeff PAGE: 1 of 2 Location of Sample Set Number Location Quantity Represented (c.y.) 1 Pier: M-2 10/10 Design Information Source of Concrete Mix Identification Specified Strength (psi) Sample Size Estrada R3050NAWR 3000 4x8 Test Results Set No. Cylinder ID Date Tested Age @ Test Total Load (lbs.) Fracture Type Compressive Strength (psi) Average Strength (psi) 1 1181 03-12-24 7 24570 6 1960 1181 04-02-24 28 32840 4 2620 1181 04-02-24 28 31940 3 2540 1181 04-02-24 28 32990 5 2630 2600 () 1181 04-30-24 56 Cylinder Data Set No. Cylinder ID Slump (inches) Time of Sample Air Temp. (°F) Concrete Temp. (°F) Air Entrainment (%) Unit Weight (lbs/ft3) Ticket Number 1 1181 3.0 11:01 AM 79 70 2.1 147.6 127 Fracture Type Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 Note: (1) Concrete was sampled in accordance with ASTM C-31 (2) Concrete cylinders were tested in accordance with ASTM C-39 () Indicates test cylinders broke at 87 percent of the required 28 day design strength. The hold cylinder will be tested at 56 days. REPORT NO. 29 REG PROJECT NO. 25298 SAMPLE DATE: 03-05-24 PAGE: 2 of 2 E-Mail Distribution: (2) ARCO/Murray/ Mr. Chase Killingsworth Mr. Brice Jones (1) Pritchard Associates/ Mr. Taylor Wildman (2) City of Grapevine/ Mr. Daniel Steinshouer Mr. Phillip Sedivy (2) DFW West Logistics One. LLC/ Mr. Bunker Curnes/Mr. Tom Curnes Submitted by: REED ENGINEERING GROUP, LTD. Registration Number F-3114 Cary Tipps Project Manager, CMT CT/cn