Loading...
HomeMy WebLinkAbout652243_38269_118-cyl-june07 2424 STUTZ DR.  SUITE 400  DALLAS, TX 75235  TEL [214] 350 5600  FAX [214] 350 0019 CONCRETE CYLINDER TEST REPORT Grapevine Building A 3642 Euless-Grapevine Road Grapevine, Texas REPORTED TO: ARCO/Murray 4925 Greenville Ave., Suite 915 Dallas, Texas 75206 ATTN: Mr. Chase Killingsworth REPORT NO. 118 REG PROJECT NO. 25298 SAMPLE DATE: 06-07-24 TECHNICIAN: A. Gonzalez PAGE: 1 of 2 Location of Sample Set Number Location Quantity Represented (c.y.) 1 Fire Lane: 50’N, 120’W from SW building corner 20/360 2 Fire Lane: 360’N, 125’W from SW building corner 150/360 3 Fire Lane: 710’N, 115’W from SW building corner 210/360 4 Fire Lane: 800’N, 50’E from SW building corner 310/360 Design Information Source of Concrete Mix Identification Specified Strength (psi) Sample Size Estrada Ready Mix R4060AEWR 4000 4x8 Test Results Set No. Cylinder ID Date Tested Age @ Test Total Load (lbs.) Fracture Type Compressive Strength (psi) Average Strength (psi) 1 2590 06-14-24 7 40430 1 3220 2590 07-05-24 28 2590 07-05-24 28 2590 07-05-24 28 2590 Hold H 2 2591 06-14-24 7 42730 4 3400 2591 07-05-24 28 2591 07-05-24 28 2591 07-05-24 28 2591 Hold H 3 2592 06-14-24 7 36890 3 2940 2592 07-05-24 28 2592 07-05-24 28 2592 07-05-24 28 2592 Hold H 4 2593 06-14-24 7 30540 2 2430 2593 07-05-24 28 2593 07-05-24 28 2593 07-05-24 28 2593 Hold H REPORT NO. 118 REG PROJECT NO. 25298 SAMPLE DATE: 06-07-24 PAGE: 2 of 2 Cylinder Data Set No. Cylinder ID Slump (inches) Time of Sample Air Temp. (°F) Concrete Temp. (°F) Air Entrainment (%) Unit Weight (lbs/ft3) Ticket Number 1 2590 6.0 7:10 AM 73 81 3.1 148.7 1119 2 2591 5.0 8:30 AM 74 84 3.0 149.1 1132 3 2592 5.0 10:00 AM 76 87 3.2 147.5 N/A 4 2593 7.0 12:40 PM 78 90 2.9 149.5 N/A Fracture Type Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 Note: (1) Concrete was sampled in accordance with ASTM C-31 (2) Concrete cylinders were tested in accordance with ASTM C-39 E-Mail Distribution: (2) ARCO/Murray/ Mr. Chase Killingsworth Mr. Brice Jones (2) Pritchard Associates/ Mr. Taylor Wildman Mr. Azra Spahalic (4) City of Grapevine/ Mr. Daniel Steinshouer Mr. Phillip Sedivy Mr. Israel Lozano/ Mrs. Kelly Taft (2) DFW West Logistics One. LLC/ Mr. Bunker Curnes Mr. Tom Curnes Submitted by: REED ENGINEERING GROUP, LTD. Registration Number F-3114 Cary Tipps Project Manager, CMT CT/cn