HomeMy WebLinkAbout652243_38269_118-cyl-june07
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019
CONCRETE CYLINDER TEST REPORT
Grapevine Building A
3642 Euless-Grapevine Road
Grapevine, Texas
REPORTED TO: ARCO/Murray
4925 Greenville Ave., Suite 915
Dallas, Texas 75206
ATTN: Mr. Chase Killingsworth
REPORT NO. 118
REG PROJECT NO. 25298
SAMPLE DATE: 06-07-24
TECHNICIAN: A. Gonzalez
PAGE: 1 of 2
Location of Sample
Set Number Location Quantity Represented (c.y.)
1 Fire Lane: 50’N, 120’W from SW building corner 20/360
2 Fire Lane: 360’N, 125’W from SW building corner 150/360
3 Fire Lane: 710’N, 115’W from SW building corner 210/360
4 Fire Lane: 800’N, 50’E from SW building corner 310/360
Design Information
Source of Concrete Mix Identification Specified Strength (psi) Sample Size
Estrada Ready Mix R4060AEWR 4000 4x8
Test Results
Set
No.
Cylinder
ID
Date
Tested
Age @
Test
Total Load
(lbs.)
Fracture
Type
Compressive
Strength (psi)
Average
Strength (psi)
1 2590 06-14-24 7 40430 1 3220
2590 07-05-24 28
2590 07-05-24 28
2590 07-05-24 28
2590 Hold H
2 2591 06-14-24 7 42730 4 3400
2591 07-05-24 28
2591 07-05-24 28
2591 07-05-24 28
2591 Hold H
3 2592 06-14-24 7 36890 3 2940
2592 07-05-24 28
2592 07-05-24 28
2592 07-05-24 28
2592 Hold H
4 2593 06-14-24 7 30540 2 2430
2593 07-05-24 28
2593 07-05-24 28
2593 07-05-24 28
2593 Hold H
REPORT NO. 118
REG PROJECT NO. 25298
SAMPLE DATE: 06-07-24
PAGE: 2 of 2
Cylinder Data
Set
No.
Cylinder
ID
Slump
(inches)
Time of
Sample
Air
Temp.
(°F)
Concrete
Temp.
(°F)
Air
Entrainment
(%)
Unit
Weight
(lbs/ft3)
Ticket
Number
1 2590 6.0 7:10 AM 73 81 3.1 148.7 1119
2 2591 5.0 8:30 AM 74 84 3.0 149.1 1132
3 2592 5.0 10:00 AM 76 87 3.2 147.5 N/A
4 2593 7.0 12:40 PM 78 90 2.9 149.5 N/A
Fracture Type
Type 1 Type 2 Type 3 Type 4 Type 5 Type 6
Note: (1) Concrete was sampled in accordance with ASTM C-31
(2) Concrete cylinders were tested in accordance with ASTM C-39
E-Mail
Distribution: (2) ARCO/Murray/
Mr. Chase Killingsworth
Mr. Brice Jones
(2) Pritchard Associates/
Mr. Taylor Wildman
Mr. Azra Spahalic
(4) City of Grapevine/
Mr. Daniel Steinshouer
Mr. Phillip Sedivy
Mr. Israel Lozano/
Mrs. Kelly Taft
(2) DFW West Logistics One. LLC/
Mr. Bunker Curnes
Mr. Tom Curnes
Submitted by:
REED ENGINEERING GROUP, LTD.
Registration Number F-3114
Cary Tipps
Project Manager, CMT
CT/cn