Loading...
HomeMy WebLinkAboutDFW West Logistics_3rd Party Testing_Letter of Engineering Compliance_11.7.24FR [- n ES I I n ES GCOTECHMCAL AND IS F=j C) L-1 November 7. 2024 Project No. 25298 ARCO/Murray 4925 Greenville Ave., Suite 915 Dallas, Texas 75206 A.ITN: Mr. Chase Killingsworth Re: Final Letter Grapevine Building A 3642 Euless -Grapevine Road Grapevine, Texas Gentlemen: This letter is to confirm representatives of our firm Performed periodic field density tests on the building pad, observed the construction of the drilled piers., and sampled concrete for compressive strength testing. Reinforcing steel observation for the piers, floor slab, tilt wall panels and paving were also performed. periodic observations of the structural steel erection were also conducted. Based On our observations and test results, items observed and tested by our firm were constructed in general compliance with project plans and specifications. This letter is not a guarantee, nor warranty of the work product of the contractor. If you have any questions, do not hesitate to call. REED ENGINI.-,.ERING GROUP. LTD. Registration Number F-3114 'Ronald F. Reed, P.E. 2424 STUTZ DRIVE, SUITE 400 DALI,AS.TX 75235 t0214 3SO.5600 fax 21-1,350.0019 GEOTECHNiCAL ENGINEERING ENVIRONMENTAL CONSULTING CONSTRUCTION MATERIALS TESTING www-reed -engi n a e ring. c orn