November 7. 2024
Project No. 25298
ARCO/Murray
4925 Greenville Ave., Suite 915
Dallas, Texas 75206
A.ITN: Mr. Chase Killingsworth
Re: Final Letter
Grapevine Building A
3642 Euless -Grapevine Road
Grapevine, Texas
Gentlemen:
This letter is to confirm representatives of our firm Performed periodic field
density tests on the building pad, observed the construction of the drilled piers.,
and sampled concrete for compressive strength testing. Reinforcing steel
observation for the piers, floor slab, tilt wall panels and paving were also
performed.
periodic observations of the structural steel erection were also conducted.
Based On our observations and test results, items observed and tested by our
firm were constructed in general compliance with project plans and
specifications.
This letter is not a guarantee, nor warranty of the work product of the
contractor.
If you have any questions, do not hesitate to call.
REED ENGINI.-,.ERING GROUP. LTD.
Registration Number F-3114
'Ronald F. Reed, P.E.