Loading...
HomeMy WebLinkAboutDFW West Logistics_Civil Engineer_Letter of Engineering Compliance_12.12.24 2601 Meacham Blvd., Suite 600, Fort Worth, TX 76137 | halff.com December 12, 2024 AVO 45244 Mr. Daniel Steinshouer Chief Construction Inspector City of Grapevine – Engineering Division 200 South Main St. Grapevine, Texas 76051 RE: Project Swanson Site Plans Dear Mr. Steinshouer: As a follow up to the project walk through and completion of the punch list items, we have completed the record drawing package for the above referenced project. Based on the contractors’ information and my personal inspection of the project, they are in general conformance of the design plans prepared under my direction and seal. Revisions or other changes to the plans are listed as follows: • Did not install the DDC for the public fire hydrant assembly per the direction of the inspector. • Paving sections were adjusted to accommodate the temporary fire lane. • One grate inlets were upsized to two grate inlets. The record plan set in CAD and PDF formats have been provided for the City’s records. With this letter, I hereby request that the final letter of acceptance be issued for this project. Sincerely, HALFF ASSOCIATES, INC. Cody R. Hodge, P.E. Land Development Team Leader