December 12, 2024
AVO 45244
Mr. Daniel Steinshouer
Chief Construction Inspector
City of Grapevine – Engineering Division
200 South Main St.
Grapevine, Texas 76051
RE: Project Swanson Site Plans
Dear Mr. Steinshouer:
As a follow up to the project walk through and completion of the punch list items, we have completed
the record drawing package for the above referenced project.
Based on the contractors’ information and my personal inspection of the project, they are in general
conformance of the design plans prepared under my direction and seal. Revisions or other changes to
the plans are listed as follows:
• Did not install the DDC for the public fire hydrant assembly per the direction of the inspector.
• Paving sections were adjusted to accommodate the temporary fire lane.
• One grate inlets were upsized to two grate inlets.
The record plan set in CAD and PDF formats have been provided for the City’s records.
With this letter, I hereby request that the final letter of acceptance be issued for this project.
Sincerely,
HALFF ASSOCIATES, INC.
Cody R. Hodge, P.E.
Land Development Team Leader