Loading...
HomeMy WebLinkAboutItem 14 - Directional DrillingMEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: BRUNO RUMBELOW, CITY MANAGER MEETING DATE: JANUARY 21, 2025 SUBJECT: RENEWAL OF ANNUAL CONTRACT FOR DIRECTIONAL DRILLING SERVICES RECOMMENDATION: City Council to consider approval for the renewal of an annual contract for directional drilling services with Predur Underground Construction, Inc. for the Public Works Department. FUNDING SOURCE: Funds are available in the Utility Enterprise Fund and the Capital Projects General Facilities Fund for an annual estimated amount of $100,000. BACKGROUND: The purpose of this contract is to establish fixed annual pricing for directional drilling services which includes underground drilling services for water services, sanitary sewer services, conduit runs for fiber optic cabling, and street/parking lot lighting. The City of Grapevine solicited a "Request for Bid" in accordance with Local Government Code Chapter 252, Subchapter B, Section 252.021 (a) and Section 252.041 (a). The bid was advertised in the Fort Worth Star Telegram on November 20, 2023 and November 27, 2023. Six hundred ninety-one (691) vendors were electronically notified of the bid through the eBid system. Fifteen vendors viewed and downloaded the RFB and five bids were received. The bid was opened electronically and publicly on December 6, 2023 at 2 pm. The contract was for an initial one-year period, with two one-year renewal options available. If approved, this will be the first renewal option. Based on the evaluations of the Public Works Department and Purchasing it was determined an award be made to Predur Underground Construction, Inc. as the most responsible and responsive bid meeting specifications with the overall lowest bid. Staff recommends approval. KC/TM