HomeMy WebLinkAboutItem 09 - Strength Training EquipmentMEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: BRUNO RUMBELOW, CITY MANAGER
MEETING DATE: MARCH 4, 2025
SUBJECT: PURCHASE OF SEVEN HIGH -DEMAND STRENGTH EQUIPMENT
PIECES FOR THE REC OF GRAPEVINE
RECOMMENDATION: City Council to consider approval for the purchase of seven pieces of
strength equipment for The REC of Grapevine from Comm -Fit for the
Parks and Recreation Department.
FUNDING SOURCE: Funds are available in the Capital Equipment Purchase Fund for an
amount not to exceed $40,000.
BACKGROUND: As part of the Phase 2 final report from the Performance and Utilization
Analysis conducted by Barker Rinker Seacat Architecture, a light
renovation of The REC of Grapevine was identified as a priority to
enhance member experience and optimize space utilization. One of the
short-term recommendations from this analysis is to address the high
demand for the most popular strength training equipment in the fitness
room.
To alleviate congestion and improve accessibility, this proposal includes
the purchase of seven of the most frequently used strength machines.
These machines will be duplicated in Studio B, which will remain available
for group fitness classes but will also be open for general exercise use
during peak fitness room hours. This strategic addition will expand
capacity, enhance user experience, and allow for better distribution of
fitness patrons throughout the facility.
LIGHT RENOVATION - STUDIO B TEMPORARY FITNESS
EVALUATE FITNESS STUDIO B RELATED TO THE FOLLOWING:
• Architectural finishes appropriate for use with fitness equipment
• Structural floor loading capacity
• Mechanical Heating, Ventilation and Air Conditioning
WIbA . FRN�SEO
,,a EQUIPMENT STRENGTH EQUIPMENT NEEDS FOR STUDIO B:
p; —t RISIRIBUTION IN
STORAGE ALCOVE
to Horizontal leg curl
Leg extension
TOC ',� Knee raise -abdominal crunch
s Low back
Seated row
'"'o" I ( Pec fly/rear Belt
tiY—ROPOSEL
MNI:SS!VF • Smith machine
t
�• �EIW1�4'6 Itt �-�INES5
r - t IS'H�BU'IUN
YINv_ AT SIRE OF
-INESS S—UOIO9
gvnal„ Estimated $40,000
�-- - t- - -
KEY PLAN ��