Loading...
HomeMy WebLinkAbout25-000139``Last Revision Date Project No. Approved Checked Drawn REVISIONS DateNo. Item KEY PLAN SCHEDULE 13012 08.21.2024 Code Information Summary Square Footages: Lease Space = 1965 SF Jurisdictions: City of Grapevine building department Applicable information: Codes: 2021 IBC 2021 IPC 2021 IMC 2020 NEC 2021 IECC Regulations- TDLR- Texas Accessibility ST. Building Occupancy B Construction Type II- B Interior wall & ceiling finish requirement Class C Flame Spread 76-200 Smoke developed: 0-450 Occupant load calculation: 1. Waiting space & Office: 1393 SF( 1393/150= 9 O.C.C.) 2. Fixed Seating & Bed: 15 O.C.C. Total Actual Occupant Load = 24 O.C.C. Number of restroom required= 1 Number of restroom provide= 1 Unisex ADA restroom, 1 staff restroom Building egress- Number of exists required: 1 Number of exists provided: 2 Egress width required: 36" Egress width provided: 36" Max. travel distance= 62' GENERAL NOTES: 1. The general contractor shall verify all conditions and dimensions on the job site and report any discrepancies and/or unusual conditions to the architect prior to finalizing contract and commencement of construction. 2. Contractor shall provide public protection as necessary and required by the local city requirements. 3. While the drawings have been segmented into standard divisions generally reflecting the scope of work of different trades, work required of any trade may be shown anywhere in the drawings. Contractors is therefore cautioned to base contract on the entire integrated construction documents. No claim for an extra will be considered for failure to do so. 4. In the event of discrepancies between various drawings, report conditions to architect in timely manner to allow review and response. 5. Unless otherwise indicated on these drawings as being N.I.C or existing, all items, material etc. and installation of same are a part of the contract defined by these drawings. 6. Colors shall be provided by architect, unless otherwise noted, upon completion of approved color selection board. 7. Unless otherwise noted, exterior and interior exposed metal trim, treillage, railings, moldings, frames, casting, W.I. work etc. shall be painted. 8. General contractor to keep site clean at all times. 9. Gaps between different materials or at corners shall be sealed. 10. Roof penetrations for new mechanical equipment shall conform w/existing roofing manufacturers, warranty details, so as to maintain warranty coverage. VICINITY MAP G-001 Room NO. AREA WO O D  VINYL  EP O X Y  CO N C R E T E QU A R R Y  TI L E VI N Y L ST A I N L E S S  ST E E L  CO V E  ST R I P CE R A M I C  CO V E  TI L E QU A R R Y  CO V E D  TI L E EX I S T I N G  VI N Y L  BA S E GY P .  BO A R D CE R A M I C  TI L E ( 5 '  AF F )  WI T H  PA I N T  AB O V E FR P  UP  TO  CE I L I N G ST A I N L E S S  ST E L L  SH E E T  @ VE N T  HO O D  ON L Y FR P  UN D E R  CO U N T E R CE R A M I C  TI L E  TO  CE I L I N G FR P  (4 '  AF F )  @ BE H I N D  BE V E R A G E  CO O L E R S CE R A M I C  TI L E  AB O V E  CO U N T E R  TO  CE I L I N G AC T ( 2 ' x 2 ' ) ‐  VI N Y L  FA C E AC T ( 2 ' x 2 ' )   GY P  BO A R D  CE I L I N G  WI T H  OI L  BA S E D  EN A M E L  PA I N T AC T ( 2 ' x 4 ' ) ‐  VI N Y L  FA C E AC T ( 2 ' x 4 ' )   OP E N  TO  ST R U C T U R E .  PT D O CEILINGSBASE WALLSFLOOR  CE R A M I C  CO V E  TI L E Room Finish General Note: 1. 2. Provide schluter transition edge to floor for restroom per city of Grapevine requirement. 3. Provide vinyl clad hard gypsum ceiling product specified by USG, Gold Bond and Vinyl Rock. 4. All the epoxy paint wall are white color. Amoi Group, LLC 8750 N Central Expressway, STE 800 Dallas, Texas 75213 972. 908. 9558 ISSUE FOR PERMIT Restroom ceramic tile finish are 24"*24" white color on floor. UNRED 3 O TANG MASSAGE SPA 3105 Ira E. Wds Ave Suite 134, Grapevine, TX 76051 101 LOBBY X X X X X X X X X X X X X X X X Room Schedule 1. ANY AND ALL PAINTED SURFACES MUST BE ABOSULATELY, TOTALLY SMOOTH, WITH ABSOLUTELY NO SURFACE TEXTURING. THIS APPLIES TO ANY PAINTED GYPSUM BOARD CEILINGS IN THE RESTROOMS, AS WELL AS ANY PAINTED GYPSUM BOARD WAL IN ANY FOOD HANDLING, FOOD STORAGE, OR WARE WASHING AREAS. 2. RESTROOM FINISH SHALL COMPLY WITH IBC 2021. 102 110 MASSAGE ROOM 111 STAFF ROOM 112 113 RESTROOM TA N G M A S S A G E S P A 31 0 5 I r a E . W d s A v e S u i t e 1 3 4 , G r a p e v i n e , T X 7 6 0 5 1 ㈰㈴⼱㈯㈷ ㈰㈴⼱㈯㈷ Sheet Number Sheet Name G-001 KEY PLAN SCHEDULE I-100 INTERIOR LAYOUT PLAN I-200 RCP PLAN I-300 INTERIOR DETAILS I-400 ADA DETAILS M-100 HAVC FLOOR PLAN P-100 PLUMBING FLOOR PLAN E-100 ELECTRICAL POWER PLAN E-200 LIGHTING PLAN E-300 ELECTRICAL ONE LINE 01/14/2025 Last Revision Date Project No. Approved Checked Drawn REVISIONS DateNo. Item Amoi Group, LLC INTERIOR LAYOUT PLAN 13012 08.21.2024 8750 N Central Expressway, STE 800 Dallas, Texas 75213 972. 908. 9558 I-100 1' ISSUE FOR PERMIT UNRED 380 2024/09/18 INTERIOR LAYOUT CONTROL PLAN 1 1/4"= 1' LEGEND NEW WALL TYPE PARTITION GA. HGT GYM. BOARD TYPE INSULATION A2 U 465 20 B.O. DECK 5/8"  TYPE  "X"   GYP.  BD.  ON 4"  MTL. STUDS @ 16" O.C. ON BOTH SIDES BATT  INSULATION  (R19) A3 25 10' 5/8"  WR  GYP.  BD.  ON 6"  MTL. STUDS @ 24" O.C. ON BOTH SIDES BATT INSULATION (R13) @TOILET A4 EXISTING B.O. DECK 5/8"  TYPE  "X"   GYP.  BD.  ON EXISTING WALL ON ONE SIDE BATT INSULATION (R13) @TOILET A5 25 10' 5/8"  WR  GYP.  BD.  ON 3 5/8"  MTL. STUDS @ 24" O.C. ON ONE SIDE BATT INSULATION (R13) @TOILET A6 25 4'(V.I.F.) 5/8"  GYP.  BD.  ON 3 5/8"  MTL. STUDS @ 24" O.C. ON BOTH SIDES NO BATT  INSULATION A7 25 10' 5/8"  TYPE  "X"   GYP.  BD.  ON 6"  MTL. STUDS @ 24" O.C. ON BOTH SIDES BATT INSULATION (R13) @TOILET A8 18 B.O. DECK 5/8"  TYPE  "X"   GYP.  BD.  ON  3 5/8 MTL. STUDS @ 24" O.C. ON BOTH SIDES NO BATT  INSULATION A9 25 FURR DOWN 5/8"  TYPE  "X"   GYP.  BD.  ON  3 5/8 MTL. STUDS @ 24" O.C. ON ONE SIDE NO BATT  INSULATION A10 25 FURR DOWN 5/8"  TYPE  "X"   GYP.  BD.  ON  3 5/8 MTL. STUDS @ 24" O.C. ON BOTH SIDES NO BATT  INSULATION 1 2 3 1 2 3 1. All the hardware to be schlage lever handle hardware with 626 finish, provide silencers, hinges and latch sets for each door as required. 2. Provide closures( LCNA69- or approved Alum. equal)on toilet doors & exit doors. Note: 1. Provide membrane penetration fire stopping design number and details for both demising walls 2. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor. Door Hardware Schedule ㌮⁁汬⁩湴敲楯爠睡汬猠獨慷⁢攠瑹灥⁁㈠㘢⁧祰獵洠扯慲搠睡汬 W   113 53.11 sf SLIDE 3 3 䵁卓 剏位 76. MASSAGE ROOMRESTROOMLOBBYㄳ A2 䍏 ㄰ 13 ' - 9 " 8' - 0 " 8' - 0 " 13 ' - 3 " 10'-6" 0'-6" 9'-0" 10 ' - 0 " 6'-6" 10'-6" 19 ' - 0 " 14 ' - 0 " 22 ' - 3 " 22 ' - 9 " 10'-6" 7' - 6 " 40 ' - 0 " 14 ' - 0 " 7' - 6 " 7' - 6 " 7' - 6 " 7' - 6 " 0' - 6 " 14 ' - 0 " 4'-0" 26'-0" 4' - 0 " 䙒低吠䑅卋䙏佔 73 ' - 0 " 10 ' - 0 " 坁午䕒 0'-3" 1' - 0 " 䙒低吠䑏佒 80.75 sf 57 sf 196.3 sf 351.54 sf 144.55 sf 84.01 sf 84.01 sf 139.12 sf 78.76 sf 78.76 sf 78.76 sf 78.76 sf 78.76 sf 61 . 3 1 f t 60 . 2 7 f t 51 . 9 5 f t 51 . 1 8 f t 1 3 3 3 3 3 3 3 3 3 3 3 3 1 Hour Fire Rating Demising Wall Existing NEW COLUMNS FOR DECORATION 3 2 1 Hour Fire Rating Demising Wall Existing 䄲 䄲 䄲 䄸 䄸 䄸 䄸 䄸 䄸 䄸 䄸 䄸 䄸 䄸 䄸 䄸 䄸 䄸 䄸 䄸 䄸 䄸 TA N G M A S S A G E S P A 31 0 5 I r a E . W d s A v e S u i t e 1 3 4 , G r a p e v i n e , T X 7 6 0 5 1 ㈰㈴⼱㈯㈷ 12/27/2024 ㈰㈴⼱㈯㈷ A2 A2 A2 A2 A2 240.18 sf 01/14/2025 Last Revision Date Project No. Approved Checked Drawn REVISIONS DateNo. Item Amoi Group, LLC RCP PLAN 13012 08.21.2024 8750 N Central Expressway, STE 800 Dallas, Texas 75213 972. 908. 9558 I-200 1' Provide 36” min in depth, and 30” min wide in front of the electrical equipment. The work space shall be clear and shall extend from the floor or platform to a height of 6’-6” or the height of the equipment, whichever is greater. NOTES: 1. ISSUE FOR PERMIT RCP PLAN 1 1/4"= 1' UNRED 380 2024/09/18 LEGEND- MECHANICAL SUPPLY AIR GRILL EXHAUST FAN RETURN AIR GRILL LEGEND- LIGHTING Reflected Ceiling Legend 2' x 2 ' SUSPENDED CEILING 2' x 4' SUSPENDED CEILING qty: 6 qty: 20 qty: 19 qty: 1 5w 120V 20w 120V 2'x2' LED FLAT LIGHT 10w 120V WALL SCONCE 60w 120V CHANDERLIER 13 ' - 9 " 8' - 0 " 8' - 0 " 13 ' - 3 " 10'-6" 0'-6" 9'-0" 10 ' - 0 " 6'-6" 10'-6" 19 ' - 0 " 14 ' - 0 " 22 ' - 3 " 22 ' - 9 " 10'-6" 7' - 6 " 40 ' - 0 " 14 ' - 0 " 7' - 6 " 7' - 6 " 7' - 6 " 7' - 6 " 0' - 6 " 14 ' - 0 " 4'-0" 26'-0" 4' - 0 " 䙒低吠䑅卋䙏佔 73 ' - 0 " 10 ' - 0 " 坁午䕒 0'-3" 1' - 0 " TA N G M A S S A G E S P A 31 0 5 I r a E . W d s A v e S u i t e 1 3 4 , G r a p e v i n e , T X 7 6 0 5 1 ㈰㈴⼱㈯㈷ 12/27/2024 ㈰㈴⼱㈯㈷ 2x2 SUSPENDED CEILING 10'-0" AFF 2x2 SUSPENDED CEILING 10'-0" AFF 2x2 SUSPENDED CEILING 10'-0" AFF 2x2 SUSPENDED CEILING 10'-0" AFF 2x2 SUSPENDED CEILING 10'-0" AFF 2x2 SUSPENDED CEILING 10'-0" AFF 2x2 SUSPENDED CEILING10'-0" AFF 2x2 SUSPENDED CEILING10'-0" AFF 2x4 SUSPENDED CEILING 10'-0" AFF 2x2 SUSPENDED CEILING 10'-0" AFF 2x4 SUSPENDED CEILING 10'-0" AFF 2x2 SUSPENDED CEILING9'-0" AFF 2x4 SUSPENDED CEILING 10'-0" AFF 2x2 SUSPENDED CEILING 10'-0" AFF ROUND LIGHT20w 120V qty: 3 01/14/2025 Last Revision Date Project No. Approved Checked Drawn REVISIONS DateNo. Item Amoi Group, LLC Interior Details 13012 04.20.2024 8750 N Central Expressway, STE 800 Dallas, Texas 75213 972. 908. 9558 I-300 ISSUE FOR PERMIT NRED M 380 2024/09/18 TA N G M A S S A G E S P A 31 0 5 I r a E . W d s A v e S u i t e 1 3 4 , G r a p e v i n e , T X 7 6 0 5 1 ㈰㈴⼱㈯㈷ 12/27/2024 ㈰㈴⼱㈯㈷ 01/14/2025 Last Revision Date Project No. Approved Checked Drawn REVISIONS DateNo. Item Amoi Group, LLC 13012 04.20.2024 8750 N Central Expressway, STE 800 Dallas, Texas 75213 972. 908. 9558 I-400 ADA details ISSUE FOR PERMIT UNRED M 380 2024/09/18 MAX MIN 16" MIN 7" MAX 9" TA N G M A S S A G E S P A 31 0 5 I r a E . W d s A v e S u i t e 1 3 4 , G r a p e v i n e , T X 7 6 0 5 1 ㈰㈴⼱㈯㈷ 12/27/2024 ㈰㈴⼱㈯㈷ 01/14/2025 Last Revision Date Project No. Approved Checked Drawn REVISIONS DateNo. Item Amoi Group, LLC 13012 09.19.2024 8750 N Central Expressway, STE 800 Dallas, Texas 75213 972. 908. 9558 2x2 LAY IN SUPPLY DIFFUSER GENERAL NOTES IN MECHANICAL: 1. ALL WORK SHALL CONFORM WITH THE MOST CURRENT EDITION OF MECHANICAL CODE AND LOCAL CODE. 2. ALL THE DUCTWORK SHALL BE CONFORM TO S.M.A.C.N.A STANDARDS. 3. SUPPLY AND RETURN AIR DUCTWORK TO BE OF RIGID SHEET METAL CONSTRUCTION WRAPPED WITH 1 1/2" THICK INSULATION EXCEPT FINAL CONNECTION INSULATED FLEXIBLE DUCT AT 5" MAX TO END. 4. FINAL CONNECTIONS TO ALL GRILLES,. REFISTERS AND DIFFUSERS TO BE A MAXIMUM 6" INSULATED CEILING PLAN AND LIGHTING PLAN. 5. THE LOCATION OF ALL CEILING DIFFUSERS, GRILLES AND REGISTERS SHALL BE COORDINATED WITH THE REFLECTED CIELING PLAN AND LIGHTING PLAN. 6. THERMOSTAT SHALL HAVE 5 DEG. F DEADBAND, SETBACK TO 55 DEG. F(HEAT) AND 85 DEG. (COOL): 7 DAYS CLOCK, 2 HOUR OCCUPANT OVERRIDE, I/O BACK UP. 7. PROVIDE MINIMUM R-8 INSULATION FOR SUPPLY AND RETURN AIR DUCTS. 8. ALL JOINTS, LONGITUDINAL AND TRANSVERSER SEAMS, AND CONNECTIONSIN DUCTWORK MUST BE SECURELY SEALED. 9.MECHANCIAL FASTENERS AND SEALS, MASTICS, OR GASKETS MUST BE USED WHEN CONNECTING DUCTS TO FANS AND OTHER AIR DISTRIBUTION EQUIPMENT. 10. CONTRACTOR SHALL PROVIDE THE OWNER A COPY OF OPERATION AND MAINTENANCE MANUAL ON ALL MECHANICAL EQUIPMENT. 11. EACH SUPPLY AIR DIFFUSER & RETURN GRILLES SHALL HAVE ADJUSTABLE DAMPER FOR ITS OWN AIR BALANCE. MECHANCIAL CONTRACTOR SHALL PROVIDE AIR BALANCE REPORT FOR EACH A/C SYSTEM. 12. PROVIDE SUPPORTS FOR EACH EXHAUST FAN WITH VIBRATION ISOLATORS TO STRUCTURE. 13. PROVIDE SMOKE DETECTORS IN SUPPLY & RETURN DUCTS OF EACH ROOF TOP A/C UNIT. 14. BALANCING DAMPERS TO BE INSTALLED IN ALL BRANCH TAKE OFFS. ALL DAMPERS TO HAVE LOCKING QUARANTS. MECHANICAL FLOOR PLAN 1 M-100 HVAC Floor PlanRAGR RETURN GRILL EXAUST FAN ISSUE FOR PERMIT 1/4"= 1' UNRED 38 2024/09/18 13 ' - 9 " 8' - 0 " 8' - 0 " 13 ' - 3 " 10'-6" 0'-6" 9'-0" 10 ' - 0 " 6'-6" 10'-6" 19 ' - 0 " 14 ' - 0 " 22 ' - 3 " 22 ' - 9 " 10'-6" 7' - 6 " 40 ' - 0 " 14 ' - 0 " 7' - 6 " 7' - 6 " 7' - 6 " 7' - 6 " 0' - 6 " 14 ' - 0 " 4'-0" 26'-0" 4' - 0 " 䙒低吠䑅卋䙏佔 73 ' - 0 " 10 ' - 0 " 坁午䕒 0'-3" 1' - 0 " GENERAL NOTES: ㄮ⁐剏噉䑅⁁⁄啃吠卍佋䔠䑅呅䍔佒⁉丠呈䔠剅呕剎⁆佒⁕义呓⁏噅删㈰〰⁃䙍 KEY NOTES: NOTES: PROVIDE FIRE DAMPER WHEN AC IS MORE THAN 2000 CFM PER CODE. PROVIDE EXHAUST SYSTEM CAPABLE OF EXHAUSTING 70 CUBIC FEET OF AIR PER MINUTES FOR EACH WATER CLOSET INSTALLED IN THE RESTROOM. THIS SYSTEM SHALL BE CONNECTED DIRECTLY TO THE OUTSIDE. 1.ALL AIR CONDITIONING FLEX DUCTWORK SHALL REQUIRE 6 INCHES SOLID METAL SADDLES AND 1INCH SOLID METAL STRAPS TO SECURE DUCTWORK TO FRAMING. (COA POLICY) 2.FLEXIBLE AIR DUCT MATERIAL SHALL BE A MAXIMUM OF 10 FEET IN LENGTH. (IMC AMENDMENT SECTION 603.6.1.1) 01 200 cfm EXISTING 10 tons RTU 㠢 200 cfm 200 cfm 200 cfm 200 cfm 225 cfm 225 cfm 375 cfm 375 cfm 300 cfm 300 cfm 300 cfm 150 cfm 150 cfm 100 cfm 250 cfm 250 cfm 10" 12" 10"10" 㠢 㠢 14" 20" 20" 18" 14" 18" 14" T 䕘䡁啓吠䙁丠千䡅䑕䱅 啎䥔⁎伮 䕆ⴱⰲ EXISTING EF-2 375 cfm 225 cfm 225 cfm 375 cfm 400 cfm 200 cfm 200 cfm 200 cfm 200 cfm 200 cfm 900 cfm 500 cfm 50 cfm EXISTING EF-1 50 cfm PRIMARY A/C CONDENSATE LINES MUST ROUTE TO THE SANITARY SEWER SYSTEM. CONDENSATE DRAINS SHALL NOT DISCHARGE INTO A PLUMBING FIXTURE OTHER THAN A FLOOR SINK, FLOOR DRAIN, TRENCH DRAIN, MOP SINK, HUB DRAIN, STANDPIPE, UTILITY SINK OR LAUNDRY SINK. (IMC SECTION 314.1.1). SECONDARY CONDENSATE LINES MUST ROUTE TO A CONSPICUOUS POINT OF DISPOSAL DISCHARGING TO A PLACE APPROVED BY AHJ, OR SYSTEMS ALLOWED BY IMC SECTION 307.2.3 (COD POLICY) TO MOP SINK TO MOP SINK LEGEND- MECHANICAL SUPPLY AIR GRILL EXHAUST FAN RETURN AIR GRILL NO WORK IN EXISTING TOILET REUSE EXISTING RTU AND EF, REWORK ON DUCT WORK. CONTRACTOR SHALL SITE VERIFY ALL THE DUCTWORK FOR REUSE AND INTERCEPTION WITH NEW DUCTWORK. TA N G M A S S A G E S P A 31 0 5 I r a E . W d s A v e S u i t e 1 3 4 , G r a p e v i n e , T X 7 6 0 5 1 ㈰㈴⼱㈯㈷ 12/27/2024 ㈰㈴⼱㈯㈷ 24" gLast Revision Date Project No. Approved Checked Drawn REVISIONS DateNo. Item Amoi Group, LLC Plumbing Floor Plan 13012 09.19.2024 8750 N Central Expressway, STE 800 Dallas, Texas 75213 972. 908. 9558 KEY NOTES IN PLUMBING: PROVIDE WATER SUPPLY LINE FROM BUILDING METER FIEILD VERIFY. PROVIDE BACKFLOW PREVENTOR PER IPC. GENERAL NOTES IN PLUMBING: 1. ALL THE PLUMBING WORKS AND MATERIALS ARE TO CONFORM WITH PLUMBING CODE , LOCAL AND STATE CODES. 2. PLUMBING CONTRACTOR SHALL VERIFY AVAILABILITY WITH LOCATIONS, SIZES OF SEWER, WATER AND GAS. 3. PLUMBING CONTRACTOR SHALL MAKE ARRANGEMENT WITH THE UTILITY COMPANY FOR SERVICE AND CONNECTIONS, PAY FOR THE ALL PERMITS, CONNECTION FEES, INSPECTION FEES AND METER CHARGES. 4. SOIL AND WASTE PIPING SHALL SLOPE @ 2% MINIMUM. 5. ALL VENTS AND FLUES SHALL CLEAR OUTSIDE AIR INTAKES OR OPENING BY MINIMUM OF 10'. 6. PLUMBING CONTRACTOR SHALL MAKE AND COMPLETE ROUGH IN ALL FINAL CONNECTION TO EQUIPMENT PROVIDED BY OTHERS REQUIRING PLUMBING CONNECTIONS. 7. PLUMBING CONTRACTOR SHALL PROVIDE FIXTURES, FAUCETS, TRAPS, STOPS, GATE VALVES, GLOBE VALVES, GAS COCKS, WATER HAMMER ARRESTERS, CLEANOUTS, INDIRECT WASTE PIPING AND ALL NECESSARY TRIMS FOR A COMPLETE PLUMBING SYSTEM. 8.INSULATE ALL HOT AND COLDE WATER LINES ABOVE GRADE WITH 1" FIBERGLASS PIPE INSULATION WITH VAPOR BARRIER. 9. PROVIDE GAS SUPPLY LINE FROM GAS METER. 10. VERIFYALL FINAL CONNECTIONS TO EQUIPMENT WITH EQUIPMENT SUPPLIER. VERIFY ROUGH-IN REQUIREMENTS WITH SAME. 11. MATERIAL SHALL BE AS FOLLOW: A: WATER PIPING TO BE PEX OR "K" COPPER BELOW GRADE, TYPE "L" COPPER ABOVE GRADE. B: WASTE PIPING TO BE CAST IRON OR PVC IF ACCEPTED BY CITY. C: VENTS TO BE CAST IRON OR PVC IF ACCEPTED BY CITY. D:GAS PIPING TO BE SCHEDULE 40, BLACK STEEL PIPE. PROVIDE GAS SHUT OFF VALVE TO EACH EQUIPMENT. E: CONDENSATE DRAIN PIPING TO BE COPPER, PROVIDE INSULATION FOR PIPING INSIDE BUILDING. 12. ALL INDIRECT WASTES EXCEEDING 24" IN LENGTH SHALL BE TRAPPED. 13. PROVIDE CLEANOUTS REQUIRED, AND AT THE BASE OF ALL STACKS. 14. ROUTE DRAIN LINES FROM HOT WATER HEATERS TO NEARBY FLOOR SINK. 15. HANDICAP PLUMBING FIXTURES SHALL BE INSULATED IN ACCORDANCE WITH THE ADA REQUIREMENTS & LOCAL STATE BARRIER FREE REQUIREMENT. 16. PROVIDE 1" WATER SUPPLY LINE FROM BUILDING WATER. PROVIDEWATER BACKFLOW PREVENTER PER CITY. 17. ALL CONDENSER LINES AND GAS LINES SHALL BE PROPERLY SUPPORTED ON ROOF TOPS BY APPROVED SUPPORTS (WOOD BLOCKS FOR SUPPORTS ARE NOT ALLOWED.) (COA POLICY) P-100 PLUMBING 1 ISSUE FOR PERMIT SEWER PLAN 1 1 1/4"= 1' UNRED 2024/09/ 13 ' - 9 " 8' - 0 " 8' - 0 " 13 ' - 3 " 10'-6" 0'-6" 9'-0" 10 ' - 0 " 6'-6" 10'-6" 19 ' - 0 " 14 ' - 0 " 22 ' - 3 " 22 ' - 9 " 10'-6" 7' - 6 " 40 ' - 0 " 14 ' - 0 " 7' - 6 " 7' - 6 " 7' - 6 " 7' - 6 " 0' - 6 " 14 ' - 0 " 4'-0" 26'-0" 4' - 0 " 䙒低吠䑅卋䙏佔 73 ' - 0 " 10 ' - 0 " 坁午䕒 0'-3" 1' - 0 " 13 ' - 9 " 8' - 0 " 8' - 0 " 13 ' - 3 " 10'-6" 0'-6" 9'-0" 10 ' - 0 " 6'-6" 10'-6" 19 ' - 0 " 14 ' - 0 " 22 ' - 3 " 22 ' - 9 " 10'-6" 7' - 6 " 40 ' - 0 " 14 ' - 0 " 7' - 6 " 7' - 6 " 7' - 6 " 7' - 6 " 0' - 6 " 14 ' - 0 " 4'-0" 26'-0" 4' - 0 " 䙒低吠䑅卋䙏佔 73 ' - 0 " 10 ' - 0 " 坁午䕒 0'-3" 1' - 0 " ALL THE FLOOR DRAIN REQUIRE TRAP PRIMERS GENERAL NOTES: CONTRACTOR SHALL SITE VERIFY EXISTING PLUMBING CONNECTIONS. CW CW CW CW CW CW CW CW CW CW CW CW ㄯ㈢ HW HW HW HW HW HW HW HW HW HW HW HW EXTEND ALL THE ROOF VENT ABOVE THE PARAPET WALL PER HOA RE4UIREMENT PLUMBING RISER DIAGRAM PLUMBING PLAN 1 1/4"= 1' 圮䠮 CW CW CW CW CW CW HW HW HW HW HW HWCW CW TIE TO EXISTING WATER SUPPL< EXISTING WATER SUPPL< PIPE HW HW HW HW HW HW CW CW CW CW CW CW NEW WATER SUPPL< PIPE 1/2" 3/4"3/4" 1/2" 1/2" 久圠䍏䵍䕒䍉䅌⁇剁䑅 EXISTING SHOWER SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS EXISTING SANITER< PIPE SSSSSSSSSSSSSS 3" 3" 2" 3"VT VT VT VTVT EXISTING 4" S.S. HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW 呩攠瑯⁥硩獴楮朠㈢ 2" CW 2" VENT 2" 呯楬整猠砲 2" VENT 3" 䙬潯爠䑲慩渠砳 2" WCO 噥湴⁴漠副潦 1/2" HW HW HW HW HW 1/2" 1/2" 3" VENT ShoZer 2" VENT 2" Washer 2" VENT 2" 䵯戠卩湫 2" VENT 2" 1/2" HW HW HW HW HW 1/2" 3/4" HW HW HW HW HW 3/4" 1/2" HW HW HW HW HW 1/2" NU. FIXTURE (F.U.) FACTOR # SUB TOTAL REMARK 1 Lavatory 1.5 2 3 2 Mop Sinks 3 1 3 3 Toilets 1 2 2 4 Shower 1 1 1 5 Washer 1 1 1 NU. FIXTURE (F.U.) FACTOR # SUB TOTAL REMARK 1 Lavortory 1.5 2 3 2 Mop Sinks 3 1 3 3 Shower 1.5 1 1.5 4 Washer 2 1 2 NU. FIXTURE (F.U.) FACTOR # SUB TOTAL REMARK 1 Lavortory 1.5 2 3 2 Floor Drain 2 3 6 3 Toilets 3 2 6 4 Shower 2 1 2 5 Washer 2 1 2 6 Mob Sink 2 1 2 GC SHALL VERIFY EXISTING 1.5" HW PROVIDED TOTAL GPM 20 COLD WATER FIXTURE UNIT (F.U.) 10 12 TOTAL F.U. GPM GC SHALL VERIFY EXISTING 2" CW PROVIDED TOTAL F.U. 15 DRAINAGE FIXTURE UNIT (F.U.) WATER HEATER CALCULATION TOTAL F.U. 9.5 WATER HEATER GPM 11.5 GC SHALL VERIFY EXISTING 4" SEWER LINE PROVIDED 䕘䥓呉乇 午佗䕒 SS NO WORK IN EXISTING TOILET Contractor shall site verify the existing water heater for reuse, replace with new commercial grade water heater if the existing one is in a bad condition or not commercial grade. GASGASGASGASGAS GA S GC SHALL SITE VERIFY EXISTING GAS PIPE SIZE, LOCATION AND CONDITION FOR REUSE, TIE TO EXISTING MAIN GAS PIPE TA N G M A S S A G E S P A 31 0 5 I r a E . W d s A v e S u i t e 1 3 4 , G r a p e v i n e , T X 7 6 0 5 1 ㈰㈴⼱㈯㈷ 12/27/2024 ㈰㈴⼱㈯㈷ Last Revision Date Project No. Approved Checked Drawn REVISIONS DateNo. Item Amoi Group, LLC 13012 04.20.2024 8750 N Central Expressway, STE 800 Dallas, Texas 75213 972. 908. 9558 OCCUPANT SENSOR CONTROL SHALL BE INSTALLED TO TURN OFF RECEPTACLES WITHIN 20 MINUTES OF ALL OCCUPANTS LEAVING A SPACE PER 2021 IECC SECTION C405.11.1.- 2.2 GENERAL NOTES IN POWER: ALL OUTLETS AT KITCHEN, RESTROOM AND ANY WET AREA SHALL BE GFCI. THERE MUST BE ABSOLUTELY NO EXPOSED ELECTRICAL CONDUIT ANYWHERE WITHIN THE ESTABLISHMENT. ALL ELECTRICAL CONDUIT AND SERVICE MUST BE INSTALLED TO BE CONCEALED WITHIN THE FINISH WALLS, AND PENTRATE ONLY AT THE POINT OF CONNECTION TO THE EQUIPMENT THAT IT SERVES. ALL THE ABOVE CONDITIONS APPLY TO ADN INCLUDE ALL POS LINES, FIRE ALARM, AND FIRE EXTINGUSHIER CONDUIT INSTALLTION. GENERAL NOTES IN LIGHTING: FLEXIBLE CORDS FOR THE CONNECTION OF APPLIANCES SHOULD COMPLY WITH LOCAL CODES. RECESSED LIGHTING AND HANGING PENDANT LIGHTING OVER THE FRONT FOOD SERVICE AREA MUST BE ORDERED WITH FULL COVERAGE LENSES INTEGRAL TO EACH FIXTURE. PROVIDE LIGHTING CONTROL OCCUPANCY SENSOR INCORPORATE A MANUAL CONTROL TO ALLOW OCCUPANTS TO TURN LIGHTS OFF 50% POWER BY BI-LEVEL SWITCHES AND THE OTHER 50% MANUALLY BY OCCUPANTS AUTOMATIC ON TO 100% IS ONLY PERMITTED FOR CORRIDOR, LOBBIES AND OTHER EGRESS FEATURES AUTOMATICALLY TURN OFF ALL LIGHTS WITHIN 30 MINS OF ALL OCCUPANTS LEAVING THE SPACE. E-100 LEGEND- POWER GROUND FAULT CIRCUIT INTERRUPTER DUPLEX RECEPTACLE, SINGLE PHASE 110V QUDRAPLEX RECEPTACLE, SINGLE PHASE 110V RECEPTACLE, SINGLE PHASE 240V SINGLE POLE TOGGLE SWITCH JUNCTION BOX DISCONNECT SWITCH ELECTRICAL BOARD FLOOR DRAINAGE FLOOR SINK DATA/ TELEPHONE OUTLET ELECTRICAL POWER PLAN INTERIOR POWER FLOOR PLAN ROOF POWER FLOOR PLAN 1 2 ISSUE FOR PERMIT 1/4"= 1' 1/4"= 1' UNRED M 380 2024/09/18 19 ' - 0 " 14 ' - 0 " 22 ' - 3 " 22 ' - 9 " 40 ' - 0 " 14 ' - 0 " 14 ' - 0 " 26'-0" 4' - 0 " 73 ' - 0 " 13 ' - 9 " 8' - 0 " 8' - 0 " 13 ' - 3 " 10'-6" 0'-6" 9'-0" 10 ' - 0 " 6'-6" 10'-6" 19 ' - 0 " 14 ' - 0 " 22 ' - 3 " 22 ' - 9 " 10'-6" 7' - 6 " 40 ' - 0 " 14 ' - 0 " 7' - 6 " 7' - 6 " 7' - 6 " 7' - 6 " 0' - 6 " 14 ' - 0 " 4'-0" 26'-0" 4' - 0 " 䙒低吠䑅卋䙏佔 73 ' - 0 " 10 ' - 0 " 坁午䕒 0'-3" 1' - 0 " GENERAL NOTES: Exam rooms, X-ray rooms, Treatment rooms, Operating rooms, Therapy areas, and Patient Care spaces will require Redundant Grounding Methods for wiring Per NEC Article 517.13(A) (B). NO WORK ON ROOF EXISTING PANEL "A" TO REUSE GFCI GF C I GF C I FOR MASSAGE SOFA FOR MASSAGE SOFA FOR MASSAGE SOFA FOR MASSAGE SOFA FOR WASHER FOR DRYEREXISTING PANEL "B" TO REUSE ROUND LIGHT LEGEND- LIGHTING 20w 120V 5w 120V 20w 120V 2'x4' LED FLAT LIGHT FOR LOGO 䄭〱 䄭〱 䄭〱 䄭〳 䄭〳 䄭〵 䄭〵 䄭〵 䄭〸 䄭〸 䄭㄰ 䄭㄰ 䄭ㄲ 䄭ㄴ 䄭ㄴ 䄭ㄶ 䄭ㄶ 䄭ㄶ 䄭ㄸ 䄭ㄸ 䄭ㄸ 䄭㈰ 䄭㈴ 䄭㈵ 䄭〲 䄭〲 䄭〲䄭〴 䄭〴 䄭〶 䄭〵 䄭〷 䄭〹 䄭ㄱ NO WORK IN EXISTING TOILET 䄭ㄲ 䄭ㄴ 䄭ㄲ 䄭㄰ 䄭㄰ 䄭〸 䄭ㄲ 䄭〸 䄭〸 䄭ㄸ 䄭ㄶ 䄭㈰ 䄭㈰ 䄭㈲ 䄭㈲ 䄭㈰ 䄭㈲ 䄭㈴ 䄭㈴ 䄭㈲ 䄭〳䄭〳 䄭㈴ 䄭ㄴ 䄭ㄴ 䄭〵 GFCI 䄭〳 TA N G M A S S A G E S P A 31 0 5 I r a E . W d s A v e S u i t e 1 3 4 , G r a p e v i n e , T X 7 6 0 5 1 ㈰㈴⼱㈯㈷ 12/27/2024 ㈰㈴⼱㈯㈷ 䄭〲 䄭〲 䄭〵 Last Revision Date Project No. Approved Checked Drawn REVISIONS DateNo. Item Amoi Group, LLC 13012 04.20.2024 8750 N Central Expressway, STE 800 Dallas, Texas 75213 972. 908. 9558 E-200 ISSUE FOR PERMIT LI LIGHTING PLAN 1 1 CLIGHTING PLAN 1/4"= 1' UNRED 380 2024/09/18 LEGEND- LIGHTING qty: 6 qty: 20 qty: 19 qty: 1 5w 120V 20w 120V 2'x2' LED FLAT LIGHT 10w 120V WALL SCONCE 60w 120V CHANDERLIER ROUND LIGHT20w 120V 13 ' - 9 " 8' - 0 " 8' - 0 " 13 ' - 3 " 10'-6" 0'-6" 9'-0" 10 ' - 0 " 6'-6" 10'-6" 19 ' - 0 " 14 ' - 0 " 22 ' - 3 " 22 ' - 9 " 10'-6" 7' - 6 " 40 ' - 0 " 14 ' - 0 " 7' - 6 " 7' - 6 " 7' - 6 " 7' - 6 " 0' - 6 " 14 ' - 0 " 4'-0" 26'-0" 4' - 0 " 䙒低吠䑅卋䙏佔 73 ' - 0 " 10 ' - 0 " 坁午䕒 0'-3" 1' - 0 " 䄭㈷ NO WORK IN EXISTING TOILET ㄮ⁃低呒䅃呏删午䅌䰠卉呅⁖䕒䥆夠呈䔠䕘䥓呉乇⁌䥇䡔匠䱏䍁呉低⁁乄⁃低䑉呉低⁆佒 GENERAL NOTES: 䄭㌱ 䄭㈹ 䄭㌱ 䄭㈹ 䄭㌱ 䄭㌱ 䄭㈹ 䄭㈹ 䄭㌱ 䄭㌱ 䄭㌵ 䄭㌵ 䄭㌷ TA N G M A S S A G E S P A 31 0 5 I r a E . W d s A v e S u i t e 1 3 4 , G r a p e v i n e , T X 7 6 0 5 1 ㈰㈴⼱㈯㈷ 12/27/2024 ㈰㈴⼱㈯㈷ 䄭㈷ 䄭㈷ qty: 3 Last Revision Date Project No. Approved Checked Drawn REVISIONS DateNo. Item Amoi Group, LLC 13012 09.19.2024 8750 N Central Expressway, STE 800 Dallas, Texas 75213 972. 908. 9558 E-300 Electrical ELECTRICAL PANEL BOARD ISSUE FOR PERMIT 3#600KCMIL & 1#500KCMIL-G (10) -4"(10) -4"4#600KCMIL & 1#500KCMIL-G 4000A 3#500KCMIL & 1#500KCMIL-G (8) -4"(8) -4"4#500KCMIL & 1#600KCMIL-G 3200A 3#600KCMIL & 1#4/0G (4) -4"(4) -4"4#600KCMIL & 1#4/0G 1600A 3#600KCMIL & 1#3/0G (3) -4"(3) -4"4#600KCMIL & 1#3/0G 1200A 2000A4#600KCMIL & 1#250KCMIL-G (5) -4"(5) -4"3#600KCMIL & 1#250KCMIL-G 2500A4#600KCMIL & 1#350KCMIL-G (6) -4"(6) -4" 3000A4#500KCMIL & 1#500KCMIL-G (8) -4"(8) -4" 3#600KCMIL & 1#350KCMIL-G 3#500KCMIL & 1#2/0G (3) -4"(3) -4"4#500KCMIL & 1#2/0G 1000A 3#350KCMIL & 1#2/0G (3) -3"(3) -3"4#350KCMIL & 1#2/0G 900A 3#600KCMIL & 1#1/0G (2) -4"(2) -4"4#600KCMIL & 1#1/0G 800A 600A4#350KCMIL & 1#1G (2) -3"(2) -3"3#350KCMIL & 1#1G 700A4#500KCMIL & 1#1/0G (2) -4"(2) -4"3#500KCMIL & 1#1/0G 3#500KCMIL & 1#3G 4"4"4#500KCMIL & 1#3G 350A 3#350KCMIL & 1#4G 3"3"4#350KCMIL & 1#4G 300A 3#250KCMIL & 1#4G 3"3"4#250KCMIL & 1#4G 250A 400A4#600KCMIL & 1#3G 4"4"3#600KCMIL & 1#3G 450A4#4/0 & 1#2G (2) -3"(2) -3"3#4/0 & 1#2G 500A4#250KCMIL & 1#2G (2) -3"(2) -3"3#250KCMIL & 1#2G 3#4/0 & 1#4G 3"3" 4#4/0 & 1#4G 225A 3#3/0 & 1#6G 2"2"4#3/0 & 1#6G 200A 3#2/0 & 1#6G 2"2"4#2/0 & 1#6G 175A 3#4 & 1#10G 1"1 1/4"4#4 & 1#10G 60A 70A4#4 & 1#8G 1 1/4"1"3#4 & 1#8G 80A4#3 & 1#8G 1 1/4"1 1/4"3#3 & 1#8G 90A4#2 & 1#8G 1 1/2"1 1/4"3#2 & 1#8G 100A4#1 & 1#8G 2"2"3#1 & 1#8G 110A4#1 & 1#6G 2"2"3#1 & 1#6G 125A4#1 & 1#6G 2"2"3#1 & 1#6G 150A4#1/0 & 1#6G 2"2"3#1/0 & 1#6G 3#6 & 1#10G 1"1"4#6 & 1#10G 50A 3#6 & 1#10G 1"1"4#6 & 1#10G 45A 3#8 & 1#10G 3/4"3/4"4#8 & 1#10G 40A 3#8 & 1#10G 3/4"3/4"4#8 & 1#10G 35A 3#10 & 1#10G 3/4"4#10 & 1#10G 30A 3#10 & 1#10G 3/4"4#10 & 1#10G 25A 3#12 & 1#12G 4#12 & 1#12G 20A 15A THREE PHASE OVERHEAD CIRCUIT SCHEDULE (COPPER) 3/4" 3/4" 3/4" 3/4" 3/4" 3#600KCMIL & 1#500KCMIL-G 4#600KCMIL & 2#350KCMIL-G 5000A 1 2 2/5 3 3/5 4 4/5 5 6 7 8 9 10 11 12 15 17 20 22 25 30 35 40 45 50 60 70 80 90 100 120 160 200 250 300 320 400 500 CONDUCTORS IN EACH CONDUIT 3-PHASE, 4-WIRE & GROUND CONDUIT SIZE CIRCUIT OR OVERCURRENT RATING 3-POLE CONDUIT SIZE CONDUCTORS IN EACH CONDUIT 3-PHASE, 3-WIRE & GROUND CIRCUIT SYMBOL 3#12 & 1#12G 4#12 & 1#12G3/4" (12) -4"3#600KCMIL & 2#350KCMIL-G (12) -4" UNRED M 380 2024/09/18 T HOMERUN T T WIRING. WIR EQUIRED F LOOR OTHERWISE One line BRANCH CIRCUIT BRANCH CIRCUIT CONDUITS AS RE WEATHERPROOF ABOVE FINISH FL COPPER ALUMINUM UNLESS NOTED NO NOTE: CONTRACTOR SHALL CONFIRM CIRCUIT BREAKER SIZE & PHASE OF ALL THE EQUIPMENT WITH MANUFACTURER'S SPEC PRIOR TO INSTALLATION. AUTHORITY HAVING JURISDIC LIGHTED EXIT SIGN EMERGENCY LIGHTING FIRE EXTINGUISHER NO CHANGE ON UPSTREAM ELECTRICAL DISTRIBUTION 200A, 3 PH ㈰㠯ㄲざ BRANCH CIRCUIT BRANCH CIRCUIT CONDUITS AS RE WEATHERPROOF ABOVE FINISH FL COPPER ALUMINUM UNLESS NOTED UNO M 200A, 3 PH ㈰㠯ㄲざ LTS REC MECH MISC AMP POL AMP POL LTS REC MECH MISC 1 250 20 1 A 20 1 540 EXISTING HOOD SYSTEM 2 3 540 20 1 B 20 1 540 EXISTING ICE CREAM DIPPER 4 5 540 20 1 C 20 1 540 EXISTING HOSTESS 6 7 360 20 1 A 20 1 540 EXISTING RECP 8 9 540 20 1 B 20 1 540 EXISTING SANDWICH PREP RECP 10 11 540 20 1 C 20 1 540 EXISTING SANDWICH PREP RECP 12 13 280 20 1 A 20 1 540 EXISTING SHAKE BLENDER 14 15 540 20 1 B 20 1 540 EXISTING SHAKE BLENDER 16 17 540 20 1 C 20 1 540 EXISTING BEER DISPENSER 18 19 280 20 1 A 20 1 540 EXISTING COOLER VAULT 20 21 540 20 1 B 20 1 540 EXISTING COOLER VAULT CU 22 23 400 20 1 C 20 1 200 NEW LIGHTS IN LOBBY 24 25 540 20 1 A 20 1 180 NEW FLOOR RECP.26 27 400 20 1 B 20 1 540 EXISTING BEER DISPENSER 28 29 300 20 1 C 20 1 540 EXISTING BACK BAR COOLER 30 31 500 20 1 A 20 1 540 EXISTING GLASS WASHER 32 33 380 20 1 B 20 1 540 EXISTING BEER DISPENSER 34 35 780 20 1 C 20 1 540 EXISTING PIZZA PREP REFRIG 36 37 95 20 1 A 20 1 540 EXISTING ICE CREAM DIPPER 38 39 95 20 1 B 20 1 540 EXISTING HOT WELL 40 41 800 20 1 C 20 1 200 NEW UTILITIES AROUND RESTROOM 42 0.0 8.4 0.0 0.0 0.0 10.1 0.0 0.2 SUBTOTAL CONNECTED KVA TOTAL 0.0 18.5 0.0 0.2 18.7 LTS REC MECH MISC SUBTOT SPARE 0.0 18.5 0.0 0.2 18.7 NEW RECP NEW RECP EXISTING RECP NEW RECP FOR FRIDGE EXISTING RECP EXISTING RECP NEW RECP FOR FRIDGE NEW RECP FOR REACH IN FRIDGE EXISTING RECP NEW RECP FOR WATER BOILER TOTAL PHASE C LOAD 3.9 5 TOTAL PHASE A LOAD 2.3 3 TOTAL PHASE B LOAD 3.0 4 TOTAL CONNECTED LOAD TOTAL CONNECTED AMPACITY17.8 49 SUBTOTAL CONNECTED KVA LOAD SUMMARY & FEEDER CALCULATION EXISTING RECP NEW RECP FOR REACH IN FRIDGE EXISTING FOR WALK IN FREEZER NEW RECP FOR RICE WAMER NEW RECP FOR RICE WAMER NEW RECP FOR FOOD PREP TABLE REUSE RECP FOR REACH-IN REFRIG. NEW RECO FOR GLASS FRIDGE CKT NO. DESCRIPTION LOAD (VA) CIRCUIT BREAKER FOR IRON WOK RANGE EXISTING RECP EXISTING RECP POLES: 42 WIRE: 4 LOAD (VA) INTERRUPTING RATING: 22 K LOCATION: FILL IN LOCATION GROUND BUS: YES DESCRIPTION CKT NO CIRCUIT BREAKER MOUNTING: SURFACE PHASE: 3 MAIN: MCB PANELBOARD NO: B ENGINEER: SECTION: 1 OF 1 VOLTAGE: 208/120 BUS: 200A LTS REC MECH MISC AMP POL AMP POL LTS REC MECH MISC 1 720 20 1 A 20 1 900 FRONT DESK RECP 2 3 720 20 1 B 20 1 540 FOOT MASSAGE CONV. RECP 4 5 300 20 1 C 20 1 60 LOGO 6 7 300 20 1 A 20 1 900 MASSAGE ROOM RECP-1 8 9 300 20 1 B 20 1 720 MASSAGE ROOM RECP-2 10 11 300 20 1 C 20 1 720 MASSAGE ROOM RECP-3 12 13 800 A 20 1 900 MASSAGE ROOM RECP-4 14 15 800 B 20 1 720 MASSAGE ROOM RECP-5 16 17 800 C 20 1 720 MASSAGE ROOM RECP-6 18 19 1000 20 1 A 20 1 720 MASSAGE ROOM RECP-7 20 21 1300 20 1 B 20 1 720 MASSAGE ROOM RECP-8 22 23 1300 20 1 C 20 1 720 MASSAGE ROOM RECP-9 24 25 2000 20 1 A 20 1 720 HALL WAY RECP 26 27 140 20 1 B SPACE 28 29 300 20 1 C SPACE 30 31 340 20 1 A SPACE 32 33 50 20 1 B 20 1 100 EF-1 (V.I.F.)34 35 240 20 1 C 20 1 100 EF-2 (V.I.F.)36 37 40 20 1 A 3100 38 39 B 3100 40 41 C 3100 42 0.0 11.8 0.0 0.0 0.0 9.1 9.5 0.0 SUBTOTAL CONNECTED KVA TOTAL 0.0 20.8 9.5 0.0 30.3 LTS REC MECH MISC SUBTOT SPARE 0.0 20.8 9.5 0.0 30.3 TOTAL PHASE C LOAD 3.2 4 OFFICE RECP OFFICE RECP MASSAGE SOFA MASSAGE SOFA MASSAGE SOFA TOTAL PHASE A LOAD 5.2 6 TOTAL PHASE B LOAD 3.3 4 MAIN: MCB PANELBOARD NO: A ENGINEER: SECTION: 1 OF 1 VOLTAGE: 208/120 BUS: 200A MOUNTING: SURFACE PHASE: 3 INTERRUPTING RATING: 22 K LOCATION: FILL IN LOCATION GROUND BUS: YES CKT NO CIRCUIT BREAKER LOAD (VA) DESCRIPTION POLES: 42 WIRE: 4 EXISTING RTU (V.I.F.)40 3 CKT NO. DESCRIPTION LOAD (VA) CIRCUIT BREAKER WASHER WATER HEATER DRYER CHANDERLIER SPACE SPACE LOBBY LIGHT MASSAGE ROOM LIGHT LOAD SUMMARY & FEEDER CALCULATION TOTAL CONNECTED LOAD TOTAL CONNECTED AMPACITY SUBTOTAL CONNECTED KVA MASSAGE SOFA EXISTING AIR COMPRESSOR(V.I.F.)20 3 28.8 80 STAFF & MASSAGE ROOM LIGHT EXISTING TOILET LIGHT HALL WAY LIGHT TA N G M A S S A G E S P A 31 0 5 I r a E . W d s A v e S u i t e 1 3 4 , G r a p e v i n e , T X 7 6 0 5 1 ㈰㈴⼱㈯㈷ 12/27/2024 ㈰㈴⼱㈯㈷ COMcheck Software Version COMcheckWeb Interior Lighting Compliance Certificate Project Title: 2021 IECC Project Type:Alteration Construction Site:Owner/Agent:Designer/Contractor: Project Information Energy Code: Project Title: Data filename: 01/02/25Report date: 61 ofPage Allowed Interior Lighting Power A Area Category B Floor Area (ft2) C Allowed Watts / ft2 D Allowed Watts 1-Massage Room (Healthcare Facility:Physical Therapy)846 0.91 770 2-Common Space Types:Office - Enclosed 196 0.74 145 3-Common Space Types:Lobby - General 352 0.84 296 4-Common Space Types:Corridor/Transition <8 ft wide 240 0.71 170 5-Common Space Types:Restrooms 138 0.63 87 1468Total Allowed Watts = Proposed Interior Lighting Power E (C X D) D Fixture Watt. A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B Lamps/ Fixture C # of Fixture Massage Room (Healthcare Facility: Physical Therapy, 846 sq.ft.) LED: 2x2 LED FLAT LIGHT: LED Panel 19W:1 9 20 180 LED: WALL SCONCE: LED A Lamp 11W:1 9 10 90 Common Space Types: Office - Enclosed (196 sq.ft.) LED: 2x2 LED FLAT LIGHT: LED Panel 19W:2 1 20 20 Common Space Types: Lobby - General (352 sq.ft.) LED: CHANDERLIER: Other:1 1 60 60 LED: 2x2 LED FLAT LIGHT: LED Panel 19W:2 1 20 20 LED: WALL SCONCE: LED A Lamp 11W:3 1 10 10 LED: ROUND DOWN LIGHT: LED A Lamp 25W:3 1 20 20 Common Space Types: Corridor/Transition <8 ft wide (240 sq.ft.) LED: 2x2 LED FLAT LIGHT: LED Panel 19W:4 1 20 20 LED: WALL SCONCE: LED A Lamp 11W:7 1 10 10 Common Space Types: Restrooms (138 sq.ft.) LED: 2x2 LED FLAT LIGHT: LED Panel 19W:1 2 20 40 470Total Proposed Watts = Chris Jia Amoi group 8750 N Central Expressway STE 800 ALLEN, Texas 75013 9729089558 chengjia@utexas.edu 3105 Ira E. Wds Ave Suite 134 Grapevine, TX 76051 Jiandong Lin Tang Tai Health LLC 1229 Free stone ct Fort Worth, TX 76179 linjiandong29@gmail.com 3 9 Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 2021 IECC requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Interior Lighting PASSES Project Title: Data filename: 01/02/25Report date: 62 ofPage Chris Jia P.E 12/27/2024