Loading...
HomeMy WebLinkAbout2-20-2025 - EOR Email Correspondence1 Sam Dobbins From:Sam Dobbins Sent:Thursday, February 20, 2025 11:20 AM To:Christopher Lalic Cc:Austin Shepherd; Jeremy Huffman; Jonathan Proffitt; Lance Flores; Ray McGrew Subject:FW: [EXTERNAL] RE: 121 Commerce Center - Threaded Rod Chris, Please see below in response to the 1” vs ¾” threaded rod condition noted in your report. In addition, the anchor bolt washers have been replaced with the correct sizes. This should clear up all open items needed for our final inspection. Thanks, SAM DOBBINS Senior Project Engineer CERRIS BUILDERS 5633 W Spring Creek Parkway, Suite 200 Plano, TX 75024 O: 469.808.7512 C: 940.531.8286 CERRISBUILDERS.COM Formerly MW Builders. To learn more, visit here. From: David Riddle <driddle@wrightengineers.com> Sent: Thursday, February 20, 2025 11:13 AM To: Sam Dobbins <sdobbins@cerris.com> Cc: Austin Shepherd <AShepherd@cerris.com>; Jeremy Huffman <jhuffman@cerris.com>; Jonathan Proffitt <jproffitt@cerris.com>; Lance Flores <lflores@cerris.com>; Ray McGrew <rmcgrew@cerris.com> Subject: [EXTERNAL] RE: 121 Commerce Center - Threaded Rod Sam, The connection is acceptable David Riddle , P.E., S.E. Director at Wright Engineers 8505 Freeport Parkway Suite 525, Irving, TX 75063 972.426.8600, x6012 driddle@wrightengineers.com Structural engineers licensed in all 50 states From: Sam Dobbins <sdobbins@cerris.com> Sent: Thursday, February 20, 2025 8:09 AM To: David Riddle <driddle@wrightengineers.com> Cc: Austin Shepherd <AShepherd@cerris.com>; Jeremy Huffman <jhuffman@cerris.com>; Jonathan Proffitt 2 <jproffitt@cerris.com>; Lance Flores <lflores@cerris.com>; Ray McGrew <rmcgrew@cerris.com> Subject: FW: 121 Commerce Center - Threaded Rod David, I wanted to bring this back to the top of your inbox now that you are back from PTO. We replaced the elecone washers, so this is the final item that we need to get cleared up for our final inspection. Thanks, SAM DOBBINS Senior Project Engineer CERRIS BUILDERS 5633 W Spring Creek Parkway, Suite 200 Plano, TX 75024 O: 469.808.7512 C: 940.531.8286 CERRISBUILDERS.COM Formerly MW Builders. To learn more, visit here. From: Sam Dobbins Sent: Thursday, February 13, 2025 4:18 PM To: driddle@wrightengineers.com Cc: Austin Shepherd <AShepherd@cerris.com>; Jeremy Huffman <jhuffman@cerris.com>; 'Jonathan Proffitt' <jproffitt@mwbuilders.com>; Lance Flores <lflores@cerris.com>; Ray McGrew <rmcgrew@cerris.com> Subject: 121 Commerce Center - Threaded Rod David, During the structural steel inspection, it was noted that a ¾” threaded rod was used instead of a 1” as noted in detail 206 on attached sheet S5.01. Due to the placement of the joist seat, the erector used a ¾” threaded rod to avoid blowing out the edge of the panel. Please advise if this is acceptable or if this will need to be replaced with a 1” threaded rod. Thanks, SAM DOBBINS Senior Project Engineer CERRIS BUILDERS 5633 W Spring Creek Parkway, Suite 200 Plano, TX 75024 O: 469.808.7512 C: 940.531.8286 CERRISBUILDERS.COM Formerly MW Builders. To learn more, visit here.