Loading...
HomeMy WebLinkAboutCONCRETE PAVING - F241078-1493374,1493374,1493374,1493374,1493374 -11-17-2024Concrete Compression Test Report 5058 Brush Creek Rd Fort Worth, TX 76119 817-496-5600 UES Professional Solutions 44, LLC TBPELS #813 / TBPG #50341 FIELD DATA Placement Location:PAVING: FIRELANE Project Desc:121 COMMERCE CENTER ADDITION (LOT 1) OFF GENESIS WAY AND ENCHANTED WAY Our Report #:F241078-1493374-S1 GTIS ACQUISITIONS, LLC 787 SEVENTH AVENUE, 50TH FLOOR NEW YORK, NY 10019 KYLE ROBERSONATTN: Date Placed:11/12/2024 Time Placed:5:00 AM 3.75 3.7 52 86 Date Received:N/A Concrete Supplier:HOLCIM Submitted By:Everly, Keishawn Plant Number:952 Delivery Ticket No.:91652999 141.2 Batch Time:4:21:00 AM Tested For: Lab No.: Cure Type: Date Tested: Age (Days): Max Load: Area: Sq. In.PSI: Cap Spec: CYLINDER COMPRESSION TEST RESULTS (ASTM C-231) Avg. Length Avg. Width Avg Depth/ Diameter Cast By:UES Cured Specification:ASTM C-31 Mix ID:AEA Break Type: Sample Location:15'S 75'E OF NE CORNER PM:RONNIE YEOMAN Date Issued:12/11/2024 Specified Strength:4000 Result Specification 3-5 3-6 N/A N/A N/A Air Content: Ambient Temp (F): Concrete Temp (F): Unit Weight: Slump (ASTM C-143): Weather: Wind: Clear Initial Curing Method:Protected Area, Covered with Lid Final Curing Method:Moist Room Truck Number:N/A 857 11/19/2024 7 12198028.27 4310LABC-1231 12.00 N/A 6.001 858 12/10/2024 28 16867028.27 5970LABC-1231 12.00 N/A 6.001 859 12/10/2024 28 15935028.27 5640LABC-1231 12.00 N/A 6.003 860 HOLD HOLD 028.27 0LABC-1231 12.00 N/A 6.00 Average 28-day Compressive Strength is compliant with project specifications CC: 5800 Respectfully Submitted By:__________________________________________________________ of UES Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 604737 Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec This report is in general compliance with one or more of the following technical standards: ASTM C31, C39, C78, C109, C138, C143, C172, C173, C231, C193, C617, C780, C1064, C1019, and/or C1231 Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. This report shall not be reproduced except in full, without the prior written approval of UES. Page 1 of 5 Concrete Compression Test Report 5058 Brush Creek Rd Fort Worth, TX 76119 817-496-5600 UES Professional Solutions 44, LLC TBPELS #813 / TBPG #50341 FIELD DATA Placement Location:PAVING: FIRELANE Project Desc:121 COMMERCE CENTER ADDITION (LOT 1) OFF GENESIS WAY AND ENCHANTED WAY Our Report #:F241078-1493374-S2 GTIS ACQUISITIONS, LLC 787 SEVENTH AVENUE, 50TH FLOOR NEW YORK, NY 10019 KYLE ROBERSONATTN: Date Placed:11/12/2024 Time Placed:6:20 AM 3.75 3.8 50 77 Date Received:N/A Concrete Supplier:HOLCIM Submitted By:Everly, Keishawn Plant Number:952 Delivery Ticket No.:91653008 141.6 Batch Time:5:50:00 AM Tested For: Lab No.: Cure Type: Date Tested: Age (Days): Max Load: Area: Sq. In.PSI: Cap Spec: CYLINDER COMPRESSION TEST RESULTS (ASTM C-231) Avg. Length Avg. Width Avg Depth/ Diameter Cast By:UES Cured Specification:ASTM C-31 Mix ID:AEA Break Type: Sample Location:50'N OF NE CORNER PM:RONNIE YEOMAN Date Issued:12/11/2024 Specified Strength:4000 Result Air Content: Ambient Temp (F): Concrete Temp (F): Unit Weight: Slump (ASTM C-143): Weather: Wind: Clear Initial Curing Method:Protected Area, Covered with Lid Final Curing Method:Moist Room Truck Number:N/A 861 11/19/2024 7 12201028.27 4320LABC-1231 12.00 N/A 6.002 862 12/10/2024 28 16585028.27 5870LABC-1231 12.00 N/A 6.001 863 12/10/2024 28 16181028.27 5720LABC-1231 12.00 N/A 6.001 864 HOLD HOLD 028.27 0LABC-1231 12.00 N/A 6.00 Average 28-day Compressive Strength is compliant with project specifications CC: 5800 Respectfully Submitted By:__________________________________________________________ of UES Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 604738 Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec This report is in general compliance with one or more of the following technical standards: ASTM C31, C39, C78, C109, C138, C143, C172, C173, C231, C193, C617, C780, C1064, C1019, and/or C1231 Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. This report shall not be reproduced except in full, without the prior written approval of UES. Page 2 of 5 Concrete Compression Test Report 5058 Brush Creek Rd Fort Worth, TX 76119 817-496-5600 UES Professional Solutions 44, LLC TBPELS #813 / TBPG #50341 FIELD DATA Placement Location:PAVING: FIRELANE Project Desc:121 COMMERCE CENTER ADDITION (LOT 1) OFF GENESIS WAY AND ENCHANTED WAY Our Report #:F241078-1493374-S3 GTIS ACQUISITIONS, LLC 787 SEVENTH AVENUE, 50TH FLOOR NEW YORK, NY 10019 KYLE ROBERSONATTN: Date Placed:11/12/2024 Time Placed:8:00 AM 4.5 4.2 50 70 Date Received:N/A Concrete Supplier:HOLCIM Submitted By:Everly, Keishawn Plant Number:952 Delivery Ticket No.:91653020 140 Batch Time:7:29:00 AM Tested For: Lab No.: Cure Type: Date Tested: Age (Days): Max Load: Area: Sq. In.PSI: Cap Spec: CYLINDER COMPRESSION TEST RESULTS (ASTM C-231) Avg. Length Avg. Width Avg Depth/ Diameter Cast By:UES Cured Specification:ASTM C-31 Mix ID:AEA Break Type: Sample Location:45'N 60' W FROM THE NE CORNER PM:RONNIE YEOMAN Date Issued:12/11/2024 Specified Strength:4000 Result Specification 3-5 3-6 N/A N/A N/A Air Content: Ambient Temp (F): Concrete Temp (F): Unit Weight: Slump (ASTM C-143): Weather: Wind: Clear Initial Curing Method:Protected Area, Covered with Lid Final Curing Method:Moist Room Truck Number:N/A 866 11/19/2024 7 10355028.27 3660LABC-1231 12.00 N/A 6.003 867 12/10/2024 28 13636028.27 4820LABC-1231 12.00 N/A 6.001 868 12/10/2024 28 13719028.27 4850LABC-1231 12.00 N/A 6.001 869 HOLD HOLD 028.27 0LABC-1231 12.00 N/A 6.00 Average 28-day Compressive Strength is compliant with project specifications CC: 4840 Respectfully Submitted By:__________________________________________________________ of UES Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 604739 Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec This report is in general compliance with one or more of the following technical standards: ASTM C31, C39, C78, C109, C138, C143, C172, C173, C231, C193, C617, C780, C1064, C1019, and/or C1231 Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. This report shall not be reproduced except in full, without the prior written approval of UES. Page 3 of 5 Concrete Compression Test Report 5058 Brush Creek Rd Fort Worth, TX 76119 817-496-5600 UES Professional Solutions 44, LLC TBPELS #813 / TBPG #50341 FIELD DATA Placement Location:PAVING: FIRELANE Project Desc:121 COMMERCE CENTER ADDITION (LOT 1) OFF GENESIS WAY AND ENCHANTED WAY Our Report #:F241078-1493374-S4 GTIS ACQUISITIONS, LLC 787 SEVENTH AVENUE, 50TH FLOOR NEW YORK, NY 10019 KYLE ROBERSONATTN: Date Placed:11/12/2024 Time Placed:10:00 AM 4 4 66 75 Date Received:N/A Concrete Supplier:HOLCIM Submitted By:Everly, Keishawn Plant Number:952 Delivery Ticket No.:91653036 142.4 Batch Time:9:21:00 AM Tested For: Lab No.: Cure Type: Date Tested: Age (Days): Max Load: Area: Sq. In.PSI: Cap Spec: CYLINDER COMPRESSION TEST RESULTS (ASTM C-231) Avg. Length Avg. Width Avg Depth/ Diameter Cast By:UES Cured Specification:ASTM C-31 Mix ID:AEA Break Type: Sample Location:40'N FROM THE NW CORNER PM:RONNIE YEOMAN Date Issued:12/11/2024 Specified Strength:4000 Result Specification 3-5 3-6 N/A N/A N/A Air Content: Ambient Temp (F): Concrete Temp (F): Unit Weight: Slump (ASTM C-143): Weather: Wind: Clear Initial Curing Method:Protected Area, Covered with Lid Final Curing Method:Moist Room Truck Number:N/A 871 11/19/2024 7 12403028.27 4390LABC-1231 12.00 N/A 6.002 872 12/10/2024 28 14579028.27 5160LABC-1231 12.00 N/A 6.001 873 12/10/2024 28 15377028.27 5440LABC-1231 12.00 N/A 6.002 874 HOLD HOLD 028.27 0LABC-1231 12.00 N/A 6.00 Average 28-day Compressive Strength is compliant with project specifications CC: 5300 Respectfully Submitted By:__________________________________________________________ of UES Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 604740 Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec This report is in general compliance with one or more of the following technical standards: ASTM C31, C39, C78, C109, C138, C143, C172, C173, C231, C193, C617, C780, C1064, C1019, and/or C1231 Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. This report shall not be reproduced except in full, without the prior written approval of UES. Page 4 of 5 Concrete Compression Test Report 5058 Brush Creek Rd Fort Worth, TX 76119 817-496-5600 UES Professional Solutions 44, LLC TBPELS #813 / TBPG #50341 FIELD DATA Placement Location:PAVING: FIRELANE Project Desc:121 COMMERCE CENTER ADDITION (LOT 1) OFF GENESIS WAY AND ENCHANTED WAY Our Report #:F241078-1493374-S5 GTIS ACQUISITIONS, LLC 787 SEVENTH AVENUE, 50TH FLOOR NEW YORK, NY 10019 KYLE ROBERSONATTN: Date Placed:11/12/2024 Time Placed:12:18 PM 4 3.9 74 80 Date Received:N/A Concrete Supplier:HOLCIM Submitted By:Everly, Keishawn Plant Number:952 Delivery Ticket No.:91653057 144.8 Batch Time:11:48:00 AM Tested For: Lab No.: Cure Type: Date Tested: Age (Days): Max Load: Area: Sq. In.PSI: Cap Spec: CYLINDER COMPRESSION TEST RESULTS (ASTM C-231) Avg. Length Avg. Width Avg Depth/ Diameter Cast By:UES Cured Specification:ASTM C-31 Mix ID:AEA Break Type: Sample Location:65'N 65'E NW CORNER PM:RONNIE YEOMAN Date Issued:12/11/2024 Specified Strength:4000 Result Specification 3-5 3-6 N/A N/A N/A Air Content: Ambient Temp (F): Concrete Temp (F): Unit Weight: Slump (ASTM C-143): Weather: Wind: Clear Initial Curing Method:Protected Area, Covered with Lid Final Curing Method:Moist Room Truck Number:N/A 876 11/19/2024 7 13412028.27 4740LABC-1231 12.00 N/A 6.002 877 12/10/2024 28 16559028.27 5860LABC-1231 12.00 N/A 6.001 878 12/10/2024 28 16996028.27 6010LABC-1231 12.00 N/A 6.001 879 HOLD HOLD 028.27 0LABC-1231 12.00 N/A 6.00 Average 28-day Compressive Strength is compliant with project specifications CC: 5940 Respectfully Submitted By:__________________________________________________________ of UES Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 604741 Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec This report is in general compliance with one or more of the following technical standards: ASTM C31, C39, C78, C109, C138, C143, C172, C173, C231, C193, C617, C780, C1064, C1019, and/or C1231 Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. This report shall not be reproduced except in full, without the prior written approval of UES. Page 5 of 5