Loading...
HomeMy WebLinkAboutREBAR PIER CAPS - F241078-1442803 - 8-26-2024S4.02/112-114 2/18/2023 Alvarado, Henry The representative observed the reinforcing steel related items for the following area: A UES engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled. Detail Sheet:• Plan Sheet: Grapevine, Texas Page Number: 1442803 1 of •Date: X X X Stirrup Spacing Not Correct Not Correct Reinforcement Clean Form Clean Item Observed Correct Proper Placement Reinforcement Tied Properly Grade Reinforcement Number of Reinforcement X X Drawings Approved Observation Information X 1 Clear 8/26/2024 Off Genesis Way and Enchanted Way F241078 Technician: 08/16/2024Service Date:Client:GTIS Acquisitions, LLC 787 Seventh Avenue, 50th Floor New York, NY 10019 Work Order Number: Project Number: Report Date: Weather: 121 Commerce Center Addition (Lot 1)Project: 5058 Brush Creek Rd Fort Worth, TX 76119 www.TeamUES.com TBPELS Firm No. 813 Reinforcing Steel Observation Report • • Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies PIER CAPS WEST SIDE OF PAD, 1/D.2,D.6, B.4,B.9, A.5,-A.9 The representative utilized the following provided project plans to perform the observation: Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written X approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016) Ronnie Yeoman Project Manager UES / Riner Engineering Remarks: Item Observed Bar Length & Spacing X X Size of Reinforcement N/A N/A X Correct Splicing Correct X X Respectfully Submitted, Grade Beam / Column Size X X The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office. Based on the representative's visual observation using the provided project plans, the area was compliant PT Drawings X Cable/Tendon Drape X S4.02,S4.03 X Sheathing X X Cable/Tendon Count & Spacing X Proper Cover Proper Support Dowels in Place Stirrup Size