HomeMy WebLinkAboutREBAR SLAB - F241078-1525904 - 1-28-2025Grade Beam / Column Size
Based on the representative's visual observation using the provided project plans, the area was compliant
X
PT Drawings X Cable/Tendon Count &
Spacing X
Cable/Tendon Drape X
Proper Cover
Proper Support
Dowels in Place
Stirrup Size
X
X
Sheathing
X
X
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Respectfully Submitted,
Remarks:
Ronnie Yeoman
Project Manager
Correct Splicing
Correct
X
X
Item Observed
Bar Length & Spacing
UES / Riner Engineering
Project:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Reinforcing Steel
Observation Report
•
•
01/14/2025Service Date:Client:GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Work Order Number:
Project Number:
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Slab-on-Grade: F/19
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
X
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Drawings Approved
Observation Information
X
X
S0.06
Report Date:
Weather:
121 Commerce Center Addition (Lot 1)
Page Number:
1525904
1 of 1
Cloudy
1/28/2025
Off Genesis Way and Enchanted Way
F241078
Technician:
12/18/2023
X
X
Size of Reinforcement
N/A
•Date:
X
X
X
Stirrup Spacing
Not Correct
Karege, Patrick
The representative observed the reinforcing steel related items for the following area:
A UES engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Detail Sheet:•
Plan Sheet:
Grapevine, Texas
S0.06
Not Correct
Reinforcement Clean
Form Clean
Item Observed Correct
Proper Placement
Reinforcement Tied Properly
Grade Reinforcement
Number of Reinforcement
X
X
N/A