Loading...
HomeMy WebLinkAboutREBAR PAVING - F241078-1440847 - 8-28-2024Detail Sheet:• Plan Sheet: Grapevine, Texas C15.0 Not Correct Reinforcement Clean Form Clean Item Observed Correct Grade Reinforcement Number of Reinforcement N/A 4/26/2024 X X Size of Reinforcement N/A •Date: X X X Stirrup Spacing Not Correct Proper Placement Reinforcement Tied Properly X X 1 of 1 Clear 8/28/2024 Off Genesis Way and Enchanted Way F241078 Technician:Mendoza, Andrew Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies • Paving: Firelane North and East of Building The representative utilized the following provided project plans to perform the observation: Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written X approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016) Drawings Approved Observation Information X X C15.0 08/13/2024Service Date:Client:GTIS Acquisitions, LLC 787 Seventh Avenue, 50th Floor New York, NY 10019 Work Order Number: Project Number: Report Date: Weather: 121 Commerce Center Addition (Lot 1) 1440847 Project: 5058 Brush Creek Rd Fort Worth, TX 76119 www.TeamUES.com TBPELS Firm No. 813 Reinforcing Steel Observation Report • • • Page Number: The representative observed the reinforcing steel related items for the following area: A UES engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled. Item Observed Bar Length & Spacing UES / Riner Engineering Correct X X Respectfully Submitted, Remarks: Ronnie Yeoman Project Manager X Sheathing X X The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office. Proper Cover Proper Support Dowels in Place Stirrup Size X Grade Beam / Column Size Based on the representative's visual observation using the provided project plans, the area was compliant X PT Drawings X Cable/Tendon Count & Spacing X Cable/Tendon Drape X Correct Splicing