HomeMy WebLinkAboutREBAR PAVING - F241078-1442393 - 8-26-2024The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Based on the representative's visual observation using the provided project plans, the area was compliant
X
PT Drawings X Cable/Tendon Count &
Spacing X
Cable/Tendon Drape X Sheathing
X
X
X
X
Grade Beam / Column Size
Proper Cover
Proper Support
Dowels in Place
Respectfully Submitted,
Remarks:
Item Observed
Bar Length & Spacing
Proper Placement
Reinforcement Tied Properly
Grade Reinforcement
Number of Reinforcement
X
X
N/ACorrectNot Correct
Reinforcement Clean
Form Clean
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Ronnie Yeoman
Project Manager
UES / Riner Engineering
•
•
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
EAST SIDE PARKING LOT, S. APPROACHMENT, S.B. ENCHANTMENT WAY,NB.300' +/-
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
X
Correct Splicing
Correct
X
X
Project:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Reinforcing Steel
Observation Report
8/15/2024Service Date:Client:GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, New York 10019
Work Order Number:
Project Number:
Report Date:
Weather:
121 Commerce Center Addition (Lot 1)
Detail Sheet:•
Plan Sheet:
Grapevine, Texas Page Number:
1442393
1 of 1
Clear
8/26/2024
Off Genesis Way and Enchanted Way
F241078
Technician:Alvarado, Henry
The representative observed the reinforcing steel related items for the following area:
A UES engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
C 15.0
C 15.0
11/13/2023
X
X
Size of Reinforcement
N/A
•Date:
X
X
X
Stirrup Spacing
Not Correct Item Observed
Stirrup Size
Drawings Approved
Observation Information
X
X