HomeMy WebLinkAboutREBAR PAVING - F241078-1447504 - 9-9-2024S0.05 Not Correct Reinforcement Clean Form Clean Item Observed Correct Proper Placement Reinforcement Tied Properly Grade Reinforcement Number of Reinforcement X X N/A 11/17/2023 X X Size of Reinforcement N/A •Date: X X X Stirrup Spacing Not Correct McClure, Zachary The representative observed the reinforcing steel related items for the following area: A UES engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled. Detail Sheet:• Plan Sheet: Grapevine, Texas Report Date: Weather: 121 Commerce Center Addition (Lot 1) Page Number: 1447504 1 of 1 Clear 9/9/2024 Off Genesis Way and Enchanted Way F241078 Technician: Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies Paving on the East end of the building West from Enchanted Way The representative utilized the following provided project plans to perform the observation: Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written X approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016) Drawings Approved Observation Information X X C15.0 UES / Riner Engineering Project: 5058 Brush Creek Rd Fort Worth, TX 76119 www.TeamUES.com TBPELS Firm No. 813 Reinforcing Steel Observation Report • • 8/23/2024Service Date:Client:GTIS Acquisitions, LLC 787 Seventh Avenue, 50th Floor New York, NY 10019 Work Order Number: Project Number: Correct Splicing Correct X X Item Observed Bar Length & Spacing Respectfully Submitted, Remarks: Ronnie Yeoman Project Manager X Proper Cover Proper Support Dowels in Place Stirrup Size X Sheathing X X The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office. Based on the representative's visual observation using the provided project plans, the area was compliant X PT Drawings X Cable/Tendon Count & Spacing X Cable/Tendon Drape X Grade Beam / Column Size