Loading...
HomeMy WebLinkAboutREBAR PAVING - F241078-1458039 -9-24-2024Grade Beam / Column Size Based on the representative's visual observation using the provided project plans, the area was compliant X PT Drawings X Cable/Tendon Count & Spacing X Cable/Tendon Drape X Proper Cover Proper Support Dowels in Place Stirrup Size X X Sheathing X X The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office. Respectfully Submitted, Remarks: Ronnie Yeoman Project Manager Correct Splicing Correct X X Item Observed Bar Length & Spacing UES / Riner Engineering Project: 5058 Brush Creek Rd Fort Worth, TX 76119 www.TeamUES.com TBPELS Firm No. 813 Reinforcing Steel Observation Report • • 09/12/2024Service Date:Client:GTIS Acquisitions, LLC 787 Seventh Avenue, 50th Floor New York, NY 10019 Work Order Number: Project Number: Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies Paving: Parking lot on the westside area 6 pour #6 The representative utilized the following provided project plans to perform the observation: Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written X approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016) Drawings Approved Observation Information X X C15 Report Date: Weather: 121 Commerce Center Addition (Lot 1) Page Number: 1458039 1 of 1 Overcast 9/24/2024 Off Genesis Way and Enchanted Way F241078 Technician: 4/26/2024 X X Size of Reinforcement N/A •Date: X X X Stirrup Spacing Not Correct Henn, Michael The representative observed the reinforcing steel related items for the following area: A UES engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled. Detail Sheet:• Plan Sheet: Grapevine, Texas C15, C15.1 Not Correct Reinforcement Clean Form Clean Item Observed Correct Proper Placement Reinforcement Tied Properly Grade Reinforcement Number of Reinforcement X X N/A