Loading...
HomeMy WebLinkAboutPROOF ROLLING - F241078-1412299Proof Rolling Observation Report Grapevine, Texas Page Number: 1412299 1 Reyes, RubenTechnician: GTIS Acquisitions, LLC 787 Seventh Avenue, 50th Floor 1 121 Commerce Center Addition (Lot 1) Service Date:Client: • The technician observed proof rolling operations of the subgrade for the following area. 6/20/2024 F241078 Off Genesis Way and Enchanted Way of Building Pad: A-F/4.5-6.0 Any soft areas where rutting or pumping occurred was removed and replaced with suitable fill. Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies Project: Report Date: Weather:Partly Cloudy 6/26/2024 The UES Technician traveled to the above referenced site to observe on-going work and perform field testing as requested. 5058 Brush Creek Rd Fort Worth, TX 76119 www.TeamUES.com TBPELS Firm No. 813 Work Order Number: Project Number: New York, NY 10019 Project Manager Remarks: Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016) Ronnie Yeoman UES / Riner Engineering Respectfully Submitted, Test results on this report meet project specifications.