HomeMy WebLinkAboutPRECON MEETING - F241078-1463853 - 10-7-2024Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of UES. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed,
and are not indicative of the qualities of apparently identical or similar specimens.
September 20, 2024
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Attention: Kyle Roberson
Re: Field Inspection of Structural Steel
121 Commerce Center Addition (Lot 1)
Grapevine, Texas
UES Report No. F241078-1463853
UES arrived on site to perform a Pre-Construction Meeting for the above referenced project. Results of the
inspection are as follows:
I Pre-Construction Meeting – 9/20/2024
A UES arrived on site to attend a structural pre-construction meeting. Personnel from MW
Builders and Busy B’s Steel Erectors were in attendance. Topic discussed included
inspection scheduling, structural steel drawings and notes, welder qualifications
requirements, high strength bolting requirements and RFI requirements if steel connections
cannot not be completed per the contract drawing and have to be field modified.
*Discrepancies, if any, are noted above in bold.
INSPECTOR:
Chris Lalic
CWI#16010691
We are pleased to be of service on this project and if you have any questions, please contact our office.
Sincerely,
UES Professional Solutions 44, LLC
(Formerly Alpha Testing)
Ronnie Yeoman
Project Manager