Loading...
HomeMy WebLinkAboutPIERS - F241078-1421660 - 7-26-20241 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies UES / Riner Engineering Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct. NoNE 10.40 36 99.40 E/13 3636 99.40 36 99.40 95.60 Condition of Bottom (Wet or Dry) Depth From Top Of Concrete To Bottom Of Pier (ft.) 99.40 95.60 21.30 31.70 10.00 10.00 3.80 32.00 10.50 21.50 10.00 10.00 Client: Project: Measured Depth From Ground Level To Top Of Concrete (ft.) Required Penetration (ft.) Actual Penetration (ft.) Pier Diameter (in.) Top of Ground Elevation (ft.) Top of Pier Elevation (ft.) Depth of Bearing Stratum From Ground (ft.) Total Depth of Drilled Pier From Ground (ft.) Building/Structure Identification Drilling Contractor:Maxon DrillingMW Builders D/13 Off Genesis Way and Enchanted Way Grapevine, Texas F241078 General Contractor: Pier Identification 121 Commerce Center Addition (Lot 1)Project Number: approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016) Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written Service Date: Report Date: B/13 Building Pad C/13 Technician: Page Number: 1 of 1 Reyes, Ruben E.3/19, C.4/19, A/16.6 and A/13.4 (24" Piers) were drilled and backfilled due to excessive water in the hole. Recommend them to be cased.Remarks: Project Manager Ronnie Yeoman Respectfully Submitted, Cased Depth (ft.) 28.20 NoNE 27.00 27.90 NoNECasing Diameter (in.) 3.803.80 3.80 NoNE Dry NoNE 27.80 Dry NoNE Dry NoNE NoNE 26.00 27.00 27.60 95.60 20.50 30.80 10.00 10.30 95.60 21.60 31.60 27.80 Dry Vertical Bar Size (#)8 8 8 8 Number of Vertical Bars (each)15 15 15 15 Length of Vertical Bars (ft.) Stirrup Spacing (in.)12 12 12 12 Stirrup Size (#)3 3 3 3 Time Drilling was Completed 9:24 AM 9:48 AM 10:12 AM 10:39 AM Concrete Placed Same Day (Yes or No)Yes Yes Time Concrete was Placed 11:45 AM 11:51 AM 12:50 PM 12:56 PM Yes Yes GTIS Acquisitions, LLC 787 Seventh Avenue, 50th Floor New York, NY 10019 7/10/2024 7/26/2024 Clear 1421660 5058 Brush Creek Rd Fort Worth, TX 76119 www.TeamUES.com TBPELS Firm No. 813 Drilled Straight Shaft Pier Observation Report Weather: Work Order Number: