Loading...
HomeMy WebLinkAboutNUCLEAR DENSITY - Ronnie Yeoman-F241078-1442224-DEN 11.8 98 129.0 99 115.8 11.6 99129.2 130.7 116.2 12.5 114.6 11.5 98 128.3 115.0 11.6 FG 1 6 3 Sta 14+00 FG 1 6 127.8 130.0 116.6 11.5 115.4 12 10 4 Sta. 14+50 FG 1 6 5 Sta. 15+00 FG 1 6 9 6 Sta. 15+30 FG 1 6 7 8 6 2 Sta. 13+50 1442224 1 99 98 5058 Brush Creek Rd Fort Worth, TX 76119 www.TeamUES.com TBPELS Firm No. 813 In-Place Nuclear Density Test Report Client:GTIS Acquisitions, LLC Service Date:08/14/2024 787 Seventh Avenue, 50th Floor Report Date: Grapevine, Texas Page Number:1 of Project:121 Commerce Center Addition (Lot 1)Project Number:F241078 Off Genesis Way and Enchanted Way Technician:Eaton, Robert New York, NY 10019 Weather:Clear Work Order Number: 9808F Project Specifications Mat. No. Optimum Moisture (%) Max Dry Weight (pcf) Proctor Report No. Moisture Min. (%) Max. Compaction Min. (%) Max.Material Description/Classification PI Material Information Laboratory Data 1 11.5 117.3 0 4Flex Base Percent Compaction (%) 15 1 Sta. 13+00 FG 1 General Location Area:North Bound Service Road Decel Lane 558 Remarks: Field Test Data Test No.Test Location Lift/ Depth Mat. No. Probe Depth (in.) Wet Density (pcf) Dry Density (pcf) Percent Moisture (%) 14 Gauge Information Non-compliant results are indicated by an asterisk(*) if applicable. Serial No:12039 Manufacturer:Troxler Model:3411B 13 UES / Alpha Testing, LLC approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016) Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies This report is in general compliance with one or more of the following technical standards: D6938-15 Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written Ronnie Yeoman Project Manager 11 Respectfully Submitted, Standard Count: (D):1130 (M):