HomeMy WebLinkAboutMOISTURE DENSITY - F241078-1428191approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
Ronnie Yeoman
Remarks:
Respectfully Submitted,
Gauge Information Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
12
(D): 2275 (M):729Standard Count:
115.3
118.0
117.6
21.4 96
Field Test Data
Test
No.Test Location Lift/
Depth
Mat.
No.
Probe
Depth
(in.)
Wet
Density
(pcf)
Dry
Density
(pcf)
Percent
Moisture
(%)
Percent
Compaction
(%)
97.8 20.2
95.0Storm Drain Line D at Station 2+25 FG-1.0 2 6
4 923
-2 2 95
General Location
Area:Building Pad Footings
96
100221.1
1 18.0
5
Project Specifications
Mat.
No.
Optimum
Moisture
(%)
Max Dry
Weight
(pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
99.4
Material Information Laboratory Data
39Dark Brown and Brown Sandy Clay
Light Reddish Brown Clay 43
105.3
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 1
1428191
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:7/20/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:7/31/2024
New York, NY 10019 Weather:Clear
98.7 19.6 99
96
20.4
95
98
98
19.3
10 Storm Drain Line D at Station 2+25 FG-2.0 2 6
11 Storm Drain Line D at Station 1+25 FG-1.5 2 6
123.9 101.2 22.4
3 C/3- North FG-2.5 1 6
2 C/2- South FG-2.5 1 6
122.9 98.8
1 C/2- North FG-2.5 1 6
117.0 97.2
8 Storm Drain Line D at Station 2+25 FG-3.0 2 6
7 Storm Drain Line D at Station 1+25 FG-3.5 2
4 C/3- South FG-2.5
9 Storm Drain Line D at Station 1+25 FG-2.5 2 6
6
Utility Backfill/Paving Area
5 C/4- North FG-2.5 1 6
123.5
123.6 100.7 22.7 96
94
98.3 25.6 93
24.4
96
6 C/4- South FG-2.5 1 6
118.0 98.9 99
24.1 94123.5
123.7
115.6 95.4 21.2
100.2 23.5
99.516