Loading...
HomeMy WebLinkAboutMOISTURE DENSITY - F241078-1421213approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016) Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies This report is in general compliance with one or more of the following technical standards: D6938-15 Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written Project Manager UES / Riner Engineering Ronnie Yeoman Remarks: Respectfully Submitted, Gauge Information Non-compliant results are indicated by an asterisk(*) if applicable. Serial No:4457 Manufacturer:Instrotek Model:(D): 2266 (M):735Standard Count: Field Test Data Test No.Test Location Lift/ Depth Mat. No. Probe Depth (in.) Wet Density (pcf) Dry Density (pcf) Percent Moisture (%) Percent Compaction (%) 4 923 -2 2 95 General Location Area:Utility Backfill/Building Pad 96 100226.3 1 18.0 06L Project Specifications Mat. No. Optimum Moisture (%) Max Dry Weight (pcf) Proctor Report No. Moisture Min. (%) Max. Compaction Min. (%) Max.Material Description/Classification PI 93.2 Material Information Laboratory Data 39Dark Brown and Brown Sandy Clay Light Brown and Tan Clay 13 105.3 Off Genesis Way and Enchanted Way Technician:Reyes, Ruben Grapevine, Texas Page Number:1 of 1 1421213 Project:121 Commerce Center Addition (Lot 1)Project Number:F241078 Client:GTIS Acquisitions, LLC Service Date:7/9/2024 5058 Brush Creek Rd Fort Worth, TX 76119 www.TeamUES.com TBPELS Firm No. 813 In-Place Nuclear Density Test Report Work Order Number: 787 Seventh Avenue, 50th Floor Report Date:7/26/2024 New York, NY 10019 Weather:Clear 96 95 24.6 25.4 123.8 101.2 22.3 3 Plumbing E.4/18.6 FG-1.5 1 6 2 Plumbing A.5/18.6 FG-2.0 1 6 124.1 100.4 1 Plumbing E.5/18.6 FG-2.0 1 6 8 Plumbing A.4/18.6 Final 2 4 Plumbing A.4/18.6 FG-1.5 6 7 Plumbing E.4/18.6 Final 2 6 5 Plumbing E.5/18.6 FG-1.0 1 6 123.6 123.4 100.2 23.2 95 95 99.3 24.5 94 23.6 6 Plumbing A.5/18.6 FG-1.0 1 6 114.0 114.8 92.1 90.9 99 98 22.7 96123.8 122.3 99.6 22.8 100.916