Loading...
HomeMy WebLinkAboutDENSITY TESTING -F241078-1399090approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016) Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies This report is in general compliance with one or more of the following technical standards: D6938-15 Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written Project Manager UES / Riner Engineering Ronnie Yeoman Remarks:Test results on this report meet project specification. Respectfully Submitted, Gauge Information Non-compliant results are indicated by an asterisk(*) if applicable. Serial No:10071 Manufacturer:Humboldt Model:H5001 EZ (D): 2998 (M):337Standard Count: Field Test Data Test No.Test Location Lift/ Depth Mat. No. Probe Depth (in.) Wet Density (pcf) Dry Density (pcf) Percent Moisture (%) Percent Compaction (%) 4 921 General Location Area:Building Pad 96121.0 Project Specifications Mat. No. Optimum Moisture (%) Max Dry Weight (pcf) Proctor Report No. Moisture Min. (%) Max. Compaction Min. (%) Max.Material Description/Classification PI Material Information Laboratory Data 38Dark Brown Clay with Sand 98.0 Off Genesis Way and Enchanted Way Technician:Byusa, Jean Joel Grapevine, Texas Page Number:1 of 1 1399090 Project:121 Commerce Center Addition (Lot 1)Project Number:F241078 Client:GTIS Acquisitions, LLC Service Date:05/25/2024 5058 Brush Creek Rd Fort Worth, TX 76119 www.TeamUES.com TBPELS Firm No. 813 In-Place Nuclear Density Test Report Work Order Number: 787 Seventh Avenue, 50th Floor Report Date:6/3/2024 New York, NY 10019 Weather:Clear 96 96 25.7 25.2 117.7 94.1 25.1 3 10' S and 25' E from NW Corner of Office Building FG-3.0 1 6 2 10' S and 40' E from NW Corner of Office Building FG-3.0 1 6 118.5 93.9 1 10' S and 55' E from NW Corner of Office Building FG-3.0 1 6 8 30' S and 10' E from NW Corner of Office Building FG-4.0 1 4 10' S and 10' E from NW Corner of Office Building FG-3.0 6 7 30' S and 25' E from NW Corner of Office Building FG-4.0 1 6 5 30' S and 55' E from NW Corner of Office Building FG-4.0 1 6 118.4 119.1 94.5 26.0 96 96 94.5 25.3 96 26.2 6 30' S and 40' E from NW Corner of Office Building FG-4.0 1 6 117.3 118.3 94.1 93.7 96 96 25.4 95117.1 118.0 93.9 25.7 93.416