Loading...
HomeMy WebLinkAboutDENSITY TESTING -F241078-139938525.9 94115.5 91.716 117.2 95 93.2 25.7 95 25.3 4 30' S and 10' E from NW Corner of Office Building Pad FG-3.0 116.2 92.8 25.2 3 30' S and 25' E from NW Corner of Office Building Pad FG-3.0 1 6 2 30' S and 40' E from NW Corner of Office Building Pad FG-3.0 1 6 117.2 93.5 1 30' S and 55' E from NW Corner of Office Building Pad FG-3.0 1 6 Clear 95 1399385 Project:121 Commerce Center Addition (Lot 1)Project Number:F241078 Client:GTIS Acquisitions, LLC Service Date:05/27/2024 5058 Brush Creek Rd Fort Worth, TX 76119 www.TeamUES.com TBPELS Firm No. 813 In-Place Nuclear Density Test Report Work Order Number: 787 Seventh Avenue, 50th Floor Report Date:6/6/2024 New York, NY 10019 Weather: Off Genesis Way and Enchanted Way Technician:Byusa, Jean Joel Grapevine, Texas Page Number:1 of 1 Material Information Laboratory Data 38Dark Brown Clay with Sand 98.0 Project Specifications Mat. No. Optimum Moisture (%) Max Dry Weight (pcf) Proctor Report No. Moisture Min. (%) Max. Compaction Min. (%) Max.Material Description/Classification PI 4 921 General Location Area:Building Pad 96121.0 Field Test Data Test No.Test Location Lift/ Depth Mat. No. Probe Depth (in.) Wet Density (pcf) Dry Density (pcf) Percent Moisture (%) Percent Compaction (%) Gauge Information Non-compliant results are indicated by an asterisk(*) if applicable. Serial No:10071 Manufacturer:Humboldt Model:H5001 EZ (D): 3006 (M):342Standard Count: Remarks: Respectfully Submitted, Ronnie Yeoman approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016) Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies This report is in general compliance with one or more of the following technical standards: D6938-15 Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written Project Manager UES / Riner Engineering