Loading...
HomeMy WebLinkAboutDENSITY TESTING -F241078-149457818.6 96119.7 95 99.8 18.2 95118.8 96120.3 101.2 19.1 2 25' E from Center of parking Pad FG 1 6 3 25' S from Center of parking Pad FG 1 6 4 25' N from Center of parking Pad FG 1 6 5 Center of south parking Pad FG 1 119.6 100.3 18.6 119.3 100.4 18.8 100.8 6 6 1494578 1 95 5058 Brush Creek Rd Fort Worth, TX 76119 www.TeamUES.com TBPELS Firm No. 813 In-Place Nuclear Density Test Report Client:GTIS Acquisitions, LLC Service Date:11/15/2024 787 Seventh Avenue, 50th Floor Report Date:11/26/2024 Grapevine, Texas Page Number:1 of Project:121 Commerce Center Addition (Lot 1)Project Number:F241078 Off Genesis Way and Enchanted Way Technician:Mitchell, Ebony New York, NY 10019 Weather:Clear Work Order Number: Project Specifications Mat. No. Optimum Moisture (%) Max Dry Weight (pcf) Proctor Report No. Moisture Min. (%) Max. Compaction Min. (%) Max.Material Description/Classification PI Material Information Laboratory Data 39Dark brown and brown sandy clay 953 100118.0 105.3 0 4 Percent Compaction (%) 1 25' W from Center of parking Pad FG 1 General Location Area:Paving 407 Remarks: Field Test Data Test No.Test Location Lift/ Depth Mat. No. Probe Depth (in.) Wet Density (pcf) Dry Density (pcf) Percent Moisture (%) Gauge Information Non-compliant results are indicated by an asterisk(*) if applicable. Serial No:9941 Manufacturer:Humboldt Model:5001EZ UES / Riner Engineering approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016) Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies This report is in general compliance with one or more of the following technical standards: D6938-15 Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written Ronnie Yeoman Project Manager Respectfully Submitted, Standard Count:(D): 2862 (M):