Loading...
HomeMy WebLinkAboutDENSITY TESTING -F241078-142430197 96 22.6 96123.9 116.5 116.7 95.9 21.7 94.7 23.0 101.116 96 5 Sanitary Sewer Line S-2 at Station 1+75 FG-6.5 2 6 115.7 116.4 96.6 95.2 123.0 95 98.6 24.7 94 23.5 4 D/11- South FG-2.5 9 Sanitary Sewer Line S-2 at Station 1+75 FG-4.5 2 6 6 6 Sanitary Sewer Line S-2 at Station 2+75 FG-6.0 2 6 Utility Backfill/Paving Area 117.2 98.0 8 Sanitary Sewer Line S-2 at Station 2+75 FG-5.0 2 6 7 Sanitary Sewer Line S-2 at Station 1+75 FG-5.5 2 123.1 100.6 22.4 3 D/11- North FG-2.5 1 6 2 D/10- South FG-2.5 1 6 123.1 99.7 1 D/10- North FG-2.5 1 6 10 Sanitary Sewer Line S-2 at Station 2+75 FG-4.0 2 6 11 Sanitary Sewer Line S-2 at Station 1+75 FG-3.5 2 6 Clear 95.1 21.3 96 22.0 96 96 19.6 95 97 99 95.3 20.5 21.5 1424301 Project:121 Commerce Center Addition (Lot 1)Project Number:F241078 Client:GTIS Acquisitions, LLC Service Date:7/19/2024 5058 Brush Creek Rd Fort Worth, TX 76119 www.TeamUES.com TBPELS Firm No. 813 In-Place Nuclear Density Test Report Work Order Number: 787 Seventh Avenue, 50th Floor Report Date:7/31/2024 New York, NY 10019 Weather: Off Genesis Way and Enchanted Way Technician:Reyes, Ruben Grapevine, Texas Page Number:1 of 2 99.4 Material Information Laboratory Data 39Dark Brown and Brown Sandy Clay Light Reddish Brown Clay 43 105.3 Project Specifications Mat. No. Optimum Moisture (%) Max Dry Weight (pcf) Proctor Report No. Moisture Min. (%) Max. Compaction Min. (%) Max.Material Description/Classification PI 4 923 -2 2 95 General Location Area:Building Pad Footings 96 100221.1 1 18.0 5 96.7 20.6 94.8 Sanitary Sewer Line S-2 at Station 1+75 FG-2.5 2 6 Sanitary Sewer Line S-2 at Station 2+75 FG-3.0 2 6 116.3 22.9 95 14 Sanitary Sewer Line S-2 at Station 2+75 Field Test Data Test No.Test Location Lift/ Depth Mat. No. Probe Depth (in.) Wet Density (pcf) Dry Density (pcf) Percent Moisture (%) Percent Compaction (%) Gauge Information Non-compliant results are indicated by an asterisk(*) if applicable. Serial No:4457 Manufacturer:Instrotek Model: 12 118.4 98.8 19.8 99 (D): 2266 (M):733Standard Count: 116.5 115.4 116.6 13 Remarks: FG-2.0 2 6 Respectfully Submitted, Ronnie Yeoman approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016) Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies This report is in general compliance with one or more of the following technical standards: D6938-15 Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written Project Manager UES / Riner Engineering approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016) Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies This report is in general compliance with one or more of the following technical standards: D6938-15 Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written UES / Riner Engineering Ronnie Yeoman Project Manager Respectfully Submitted, (D): 2266 (M):733 Remarks: Gauge Information Non-compliant results are indicated by an asterisk(*) if applicable. Serial No:4457 Manufacturer:Instrotek Model:Standard Count: 16 Sanitary Sewer Line S-2 at Station 2+75 FG-1.0 2 6 116.8 95.3 22.6 15 Sanitary Sewer Line S-2 at Station 1+75 FG-1.5 2 6 117.1 96.4 21.5 97 96 Field Test Data Test No.Test Location Lift/ Depth Mat. No. Probe Depth (in.) Wet Density (pcf) Dry Density (pcf) Percent Moisture (%) Percent Compaction (%) General Location Area:Utility Backfill/Paving Area 92 96 2 95 100Light Reddish Brown Clay 4325 21.1 99.4 -2 Material Description/Classification PI Dark Brown and Brown Sandy Clay 39 Material Information Laboratory Data Project Specifications Moisture Min. (%) Max. Compaction Min. (%) Max. 1 3 18.0 105.3 4 Mat. No. Proctor Report No. Optimum Moisture (%) Max Dry Weight (pcf) Project:121 Commerce Center Addition (Lot 1)Project Number:F241078 Off Genesis Way and Enchanted Way Technician:Reyes, Ruben Grapevine, Texas Page Number:2 of 2 787 Seventh Avenue, 50th Floor Report Date:7/31/2024 New York, NY 10019 Weather:Clear Work Order Number:1424301 Client:GTIS Acquisitions, LLC Service Date:7/19/2024 5058 Brush Creek Rd Fort Worth, TX 76119 www.TeamUES.com TBPELS Firm No. 813 In-Place Nuclear Density Test Report 97 96 22.6 96123.9 116.5 116.7 95.9 21.7 94.7 23.0 101.116 96 5 Sanitary Sewer Line S-2 at Station 1+75 FG-6.5 2 6 115.7 116.4 96.6 95.2 123.0 95 98.6 24.7 94 23.5 4 D/11- South FG-2.5 9 Sanitary Sewer Line S-2 at Station 1+75 FG-4.5 2 6 6 6 Sanitary Sewer Line S-2 at Station 2+75 FG-6.0 2 6 Utility Backfill/Paving Area 117.2 98.0 8 Sanitary Sewer Line S-2 at Station 2+75 FG-5.0 2 6 7 Sanitary Sewer Line S-2 at Station 1+75 FG-5.5 2 123.1 100.6 22.4 3 D/11- North FG-2.5 1 6 2 D/10- South FG-2.5 1 6 123.1 99.7 1 D/10- North FG-2.5 1 6 10 Sanitary Sewer Line S-2 at Station 2+75 FG-4.0 2 6 11 Sanitary Sewer Line S-2 at Station 1+75 FG-3.5 2 6 Clear 95.1 21.3 96 22.0 96 96 19.6 95 97 99 95.3 20.5 21.5 1424301 Project:121 Commerce Center Addition (Lot 1)Project Number:F241078 Client:GTIS Acquisitions, LLC Service Date:7/19/2024 5058 Brush Creek Rd Fort Worth, TX 76119 www.TeamUES.com TBPELS Firm No. 813 In-Place Nuclear Density Test Report Work Order Number: 787 Seventh Avenue, 50th Floor Report Date:7/31/2024 New York, NY 10019 Weather: Off Genesis Way and Enchanted Way Technician:Reyes, Ruben Grapevine, Texas Page Number:1 of 2 99.4 Material Information Laboratory Data 39Dark Brown and Brown Sandy Clay Light Reddish Brown Clay 43 105.3 Project Specifications Mat. No. Optimum Moisture (%) Max Dry Weight (pcf) Proctor Report No. Moisture Min. (%) Max. Compaction Min. (%) Max.Material Description/Classification PI 4 923 -2 2 95 General Location Area:Building Pad Footings 96 100221.1 1 18.0 5 96.7 20.6 94.8 Sanitary Sewer Line S-2 at Station 1+75 FG-2.5 2 6 Sanitary Sewer Line S-2 at Station 2+75 FG-3.0 2 6 116.3 22.9 95 14 Sanitary Sewer Line S-2 at Station 2+75 Field Test Data Test No.Test Location Lift/ Depth Mat. No. Probe Depth (in.) Wet Density (pcf) Dry Density (pcf) Percent Moisture (%) Percent Compaction (%) Gauge Information Non-compliant results are indicated by an asterisk(*) if applicable. Serial No:4457 Manufacturer:Instrotek Model: 12 118.4 98.8 19.8 99 (D): 2266 (M):733Standard Count: 116.5 115.4 116.6 13 Remarks: FG-2.0 2 6 Respectfully Submitted, Ronnie Yeoman approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016) Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies This report is in general compliance with one or more of the following technical standards: D6938-15 Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written Project Manager UES / Riner Engineering approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016) Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies This report is in general compliance with one or more of the following technical standards: D6938-15 Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written UES / Riner Engineering Ronnie Yeoman Project Manager Respectfully Submitted, (D): 2266 (M):733 Remarks: Gauge Information Non-compliant results are indicated by an asterisk(*) if applicable. Serial No:4457 Manufacturer:Instrotek Model:Standard Count: 16 Sanitary Sewer Line S-2 at Station 2+75 FG-1.0 2 6 116.8 95.3 22.6 15 Sanitary Sewer Line S-2 at Station 1+75 FG-1.5 2 6 117.1 96.4 21.5 97 96 Field Test Data Test No.Test Location Lift/ Depth Mat. No. Probe Depth (in.) Wet Density (pcf) Dry Density (pcf) Percent Moisture (%) Percent Compaction (%) General Location Area:Utility Backfill/Paving Area 92 96 2 95 100Light Reddish Brown Clay 4325 21.1 99.4 -2 Material Description/Classification PI Dark Brown and Brown Sandy Clay 39 Material Information Laboratory Data Project Specifications Moisture Min. (%) Max. Compaction Min. (%) Max. 1 3 18.0 105.3 4 Mat. No. Proctor Report No. Optimum Moisture (%) Max Dry Weight (pcf) Project:121 Commerce Center Addition (Lot 1)Project Number:F241078 Off Genesis Way and Enchanted Way Technician:Reyes, Ruben Grapevine, Texas Page Number:2 of 2 787 Seventh Avenue, 50th Floor Report Date:7/31/2024 New York, NY 10019 Weather:Clear Work Order Number:1424301 Client:GTIS Acquisitions, LLC Service Date:7/19/2024 5058 Brush Creek Rd Fort Worth, TX 76119 www.TeamUES.com TBPELS Firm No. 813 In-Place Nuclear Density Test Report