Loading...
HomeMy WebLinkAboutDENSITY TESTING -F241078-146713422.7 98118.2 97 95.9 22.9 98117.9 117.9 95.5 23.5 98117.8 95.7 23.1 2 Station 1+38.62 water line C-2 FG 1 6 3 Station 2+51.63 water line C-2 FG-1.0 1 6 4 Station 2+51.63 water line C-2 FG 1 6 5 Station 7+99.23 Water Line C-2 FG-1.0 1 119.8 97.3 23.1 117.3 94.9 23.6 96.3 6 6 Station 7+99.23 Water Line C-2 FG 1 6 6 1467134 1 99 97 5058 Brush Creek Rd Fort Worth, TX 76119 www.TeamUES.com TBPELS Firm No. 813 In-Place Nuclear Density Test Report Client:GTIS Acquisitions, LLC Service Date: 09/26/2024 787 Seventh Avenue, 50th Floor Report Date: 9/30/2024 Grapevine, Texas Page Number: 1 of Project:121 Commerce Center Addition (Lot 1)Project Number: F241078 Off Genesis Way and Enchanted Way Technician: Rosse, Joel New York, NY 10019 Weather: Clear Work Order Number: Project Specifications Mat. No. Optimum Moisture (%) Max Dry Weight (pcf) Proctor Report No. Moisture Min. (%) Max. Compaction Min. (%) Max.Material Description/Classification PI Material Information Laboratory Data 38Dark Brown Clay with Sand 951121.4 98.0 0 4 Percent Compaction (%) 1 Station 1+38.62 water line C-2 FG-1.0 1 General Location Area:Utilities 716 Remarks: Field Test Data Test No.Test Location Lift/ Depth Mat. No. Probe Depth (in.) Wet Density (pcf) Dry Density (pcf) Percent Moisture (%) Gauge Information Non-compliant results are indicated by an asterisk(*) if applicable. Serial No:4300 Manufacturer:Instrotek Model:Xplorer 2 UES / Riner Engineering approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016) Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies This report is in general compliance with one or more of the following technical standards: D6938-15 Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written Ronnie Yeoman Project Manager Respectfully Submitted, Standard Count:(D):2285 (M):