Loading...
HomeMy WebLinkAboutDENSITY TESTING -F241078-148207299 97 19.0 99124.5 95 106.7 16.1 95123.9 123.8 123.2 119.6 100.6 18.9 105.1 17.2 99125.1 104.7 19.5 96 122.0 122.5 104.0 17.8 101.9 2 75' S and 20' E from NE Corner of Building SG 1 6 3 75' S and 30' E from NE Corner of Building SG 1 6 4 75' S and 10' E from NE Corner of Building FG-4.0 2 6 5 75' S and 20' E from NE Corner of Building FG-4.0 2 126.7 111.3 13.8 125.8 106.8 17.8 104.6 12 75' S and 30' E from NE Corner of Building FG-2.0 2 10 75' S and 10' E from NE Corner of Building FG-2.0 2 6 6 9 75' S and 30' E from NE Corner of Building FG-3.0 2 6 6 75' S and 30' E from NE Corner of Building FG-4.0 2 6 7 75' S and 10' E from NE Corner of Building FG-3.0 2 6 8 75' S and 20' E from NE Corner of Building FG-3.0 2 6 6 1482072 2 6 121.2 101.4 19.5 99 104.9 19.3 100 104.4 18.6 100 19.7 5058 Brush Creek Rd Fort Worth, TX 76119 www.TeamUES.com TBPELS Firm No. 813 In-Place Nuclear Density Test Report Client:GTIS Acquisitions, LLC Service Date:10/21/2024 787 Seventh Avenue, 50th Floor Report Date:11/1/2024 Grapevine, Texas Page Number:1 of Project:121 Commerce Center Addition (Lot 1)Project Number:F241078 Off Genesis Way and Enchanted Way Technician:Lujan, Jacob New York, NY 10019 Weather:Clear Work Order Number: Project Specifications Mat. No. Optimum Moisture (%) Max Dry Weight (pcf) Proctor Report No. Moisture Min. (%) Max. Compaction Min. (%) Max.Material Description/Classification PI Material Information Laboratory Data 15Brown Clayey Sand Dark Brown and Brown Sandy Clay 39 952 -2 2 953 100 100218.0 1 15.8 112.1 -2 2 105.3 Percent Compaction (%) 19.8 95 96 15 75' S and 30' E from NE Corner of Building 75' S and 20' E from NE Corner of Building FG-1.0 2 6 75' S and 10' E from NE Corner of Building FG-1.0 2 6 99 99 100.4 1 75' S and 10' E from NE Corner of Building SG 1 General Location Area:NE Ramp 644 Remarks: Field Test Data Test No.Test Location Lift/ Depth Mat. No. Probe Depth (in.) Wet Density (pcf) Dry Density (pcf) Percent Moisture (%) 14 Gauge Information Non-compliant results are indicated by an asterisk(*) if applicable. Serial No:33700 Manufacturer:Troxler Model:3430 13 118.6 100.5 18.0 95 120.3 FG-1.0 2 125.1 124.6 103.9 19.9 UES / Riner Engineering approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016) Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies This report is in general compliance with one or more of the following technical standards: D6938-15 Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written Ronnie Yeoman Project Manager 6 11 75' S and 20' E from NE Corner of Building FG-2.0 2 6 Respectfully Submitted, Standard Count:(D): 1723 (M): Ronnie Yeoman This report is in general compliance with one or more of the following technical standards: D6938-15 Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016) Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies Project Manager UES / Riner Engineering Respectfully Submitted, Standard Count:(D): 1723 (M):644 Remarks: Serial No:33700 Manufacturer:Troxler Model:3430 Gauge Information Non-compliant results are indicated by an asterisk(*) if applicable. 2 6 119.9 961875' S and 30' E from NE Corner of Building FG 2 6 121.0 101.5 19.2 101.3 18.4 961775' S and 20' E from NE Corner of Building FG 16 75' S and 10' E from NE Corner of Building FG 2 6 120.5 100.4 Field Test Data Test No.Test Location Lift/ Depth Mat. No. Probe Depth (in.) Wet Density (pcf) Dry Density (pcf) Percent Moisture (%) Percent Compaction (%) 20.0 95 General Location Area:NE Ramp 10023Dark Brown and Brown Sandy Clay 39 18.0 105.3 -2 2 95 Max Dry Weight (pcf) Moisture Min. (%) Max. Compaction Min. (%) Max. 1 2 Brown Clayey Sand 15 15.8 112.1 Mat. No. Proctor Report No.Material Description/Classification PI Optimum Moisture (%) -2 2 95 100 Material Information Laboratory Data Project Specifications Off Genesis Way and Enchanted Way Technician:Lujan, Jacob Grapevine, Texas Page Number:2 of 2 Work Order Number:1482072 Project:121 Commerce Center Addition (Lot 1)Project Number:F241078 787 Seventh Avenue, 50th Floor Report Date:11/1/2024 New York, NY 10019 Weather:Clear 5058 Brush Creek Rd Fort Worth, TX 76119 www.TeamUES.com TBPELS Firm No. 813 In-Place Nuclear Density Test Report Client:GTIS Acquisitions, LLC Service Date:10/21/2024