HomeMy WebLinkAboutDENSITY TESTING -F241078-1483645100
99
21.9 98116.1
97
95.6 21.9 98115.6
115.5
121.3 97.0 22.8
95.6 23.1
96114.4 93.8 22.5
99
121.5
121.9 97.9 22.7
97.3
2 Ne Corner of Building 20' W FG-1.0 1 8
3 ES of Building 10' W of of Building north entrance FG-1.0 1 8
4 ES of Building 20' W of Building north entrance FG-1.0 1 8
5 ES of Building 30' W of Building north entrance FG-1.0 1
115.2 94.7 22.0
115.4 95.3 22.3
96.1
8
9 Northside of Building 50' E FG-1.0 1 8
6 ES of Building 50' W of Building north entrance FG-1.0 1 8
7 Northside of Building 10' E FG-1.0 1 8
8 Northside of Building 30' E FG-1.0 1 8
8
1483645
1
97
98
22.1
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:10/22/2024
787 Seventh Avenue, 50th Floor Report Date:11/1/2024
Grapevine, Texas Page Number:1 of
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Mitchell, Ebony
New York, NY 10019 Weather:Clear
Work Order Number:
Project Specifications
Mat.
No.
Optimum
Moisture
(%)
Max Dry
Weight
(pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
38Dark Brown Clay with Sand 95 100121.4 98.0 0 4
Percent
Compaction
(%)
1 Ne Corner of Building 10' W FG-1.0 1
General Location
Area:NE corner of building /eastside of Building/Northside of building
405
Remarks:
Field Test Data
Test
No.Test Location Lift/
Depth
Mat.
No.
Probe
Depth
(in.)
Wet
Density
(pcf)
Dry
Density
(pcf)
Percent
Moisture
(%)
Gauge Information Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:9941 Manufacturer:Humboldt Model:5001EZ
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Ronnie Yeoman
Project Manager
Respectfully Submitted,
Standard Count:(D): 2876 (M):